ARMY MIL-D-13512 B-1964 DELAY ELEMENT NON-DELAY M1 LOADING ASSEMBLING AND PACKING《M1非延迟的延迟元件的装载 组装及包装》.pdf
《ARMY MIL-D-13512 B-1964 DELAY ELEMENT NON-DELAY M1 LOADING ASSEMBLING AND PACKING《M1非延迟的延迟元件的装载 组装及包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-D-13512 B-1964 DELAY ELEMENT NON-DELAY M1 LOADING ASSEMBLING AND PACKING《M1非延迟的延迟元件的装载 组装及包装》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-D-l3512B(MU) 24 MARCH 1964 SUPERSEDING MIL-D-l3512A(ORD) 28 APRIL 1961 (SEE 6.6) MILITARY SPECIFICATION DELAY ELEME“, NON-DELAY MI LOADING, ASSEMBLING AND PACKING 1. SCOPE 1.1 This specification covers the loading, assembling and packing for one type of de- lay element designated as Delay Elemen
2、t, Non-Delay, M1. 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-P-116 -Preservation, Methods of. MIGA-2550 -Ammunition an
3、d Spe- cial Weapons, Gen- e r a 1 Specification for. MIGP-13392 -P r i m e r , Percussion, MU. MIL146208 -Inspection R e q u i r e - ments, General Spec- ification for, MILI46607 -Inspection Equipment, Supply and Mainte- nance of. STANDARDS MARY MILSTD-1OSD -Sampling P r o c e - dures and Tables for
4、 Inspection by Attributes. MIL-STD-109 -Quality Assurance Terms and Defini- tions. MILSTD-1235 -Single and Multi- level Continuous Sampling Proce- dures and Tables for Inspection by Attributes. DRAWINGS ORDNANCE CORPS 7548277 -Box, Packing, Ammu- nition, For Delay Elements, M1 and M2. 7548278 -Box,
5、Set-up, Packing, Amm., Inner and Outer For Deiay Elemenis, M1 and M2. 8853675 -Delay Element, M1, Non-Delay Assem- bly. PUBLICATIONS ORDNANCE CORPS IEL-8853675 -Index of Inspection (Copies of specifications, standards, drawings, and publications required by suppliers in connection with specific proc
6、urement functions should be obtained from the procuring activity or as directed by the contradig officer.) Equipment Lists. 3. REQUIREMENTS 3.1 Materia. Materiais and parts shall be Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIGD-l3512B(MU) in a
7、ccordance with applicable drawings and specifications. 3.2 Delay elements. The delay element as- semblies shall comply with all requirements specified on Drawing (dwg.) 8853675 and With all requirements specified in applicable specifications. 3.3 Fmctioning. The delay element assem- blies shall not
8、fail to function, and shall func- tion with a maximum (max.) delay time of 0.003 seconds, when tested as specified in 4.4.2 (see 6.7). 3.4 Workmanship. All parts shall be free of chips, dirt, grease, rust, and other foreign material. The cleaning method shall not be injurious to any of the parts nor
9、 shall the parts be contaminated by the cleaning agents. 4. QUALITY ASSURANCE PROVISIONS 4.1 General quality assurance provisions. Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of all inspection require- ments specified herein. Except a
10、s otherwise specified, the supplier may utilize his own or any other inspection facilities and services acceptable to the Government. Inspection records of the examinations and testa shall be kept complete and available to the Govern- ment as specified in the contxact or order. The Government reserv
11、es the right to per- form any of the inspections set forth in the specification where such inspections are deemed necessary to assure that supplies and services conform to prescribed requirements. Reference shall be made to Standard MIL- STD-109 in order to define terms used herein. The provisions o
12、f Specification MIL-A-2550 shall apply. 4.1.1 Contmctor quality asszwance system. The contractor shall provide and maintain an effective quality assurance system in com- pliance with the requirements of Specification MIL-145208. 4.1.2 Submission of product. At the time the completed lot of product i
13、s submitted to the Government for acceptance the contractor shall supply the following information ac- Y plicable to the product being submitted: (a) A statement that the lot complies with all quality assurance pro- visions of the approved current written description of the system. (b) Number of uni
14、ts of product in- spected. (c) Results obtained for all inspection performed. (d) Drawing, specification number and date, together with an identifica- tion and date of changes. (e) Certificates of analysis on all ma- terial purchased by the contractor when such material is controlled by Government s
15、pecifications ref- erenced in any of the contractual documents. (f) Number of items in the lot. (g) Date submitted. The certificate shall be signed by a responsi- ble agent of the certifying organization, The initial certificate submitted shall be sub- stantiated by evidence of the agents au- thorit
16、y to bind his principal. Substantiation of the agents authority will not be required with subsequent certificates unless, during the course of the contract, this authority is vested in another agent of the certifying organization. 4.1.3 Government veg.cation. Using the contractors written quality as
17、surance proce- dure, this detail specification, the applicable drawings and other contractual documents as a guide, the Government inspector shall verify at unscheduled intervals all quality assurance operations performed by the con- tractor. Verification will be in accordance with Specification MIL
18、I45208 and will be performed to the extent necessary to assure compliance with the contractual require- ments. Severity of Government inspection of individual characteristics will be directly re- lated to the seriousness of the classification assigned. In no instance will a characteristic classified
19、 “critical” be accepted solely on the basis of the contractors records. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-r 4.2 Initial production inspection, 4.2.1 Submission. Prior to the start of reg- ular production, the contractor shall submit an
20、initial production sampIe consisting of 150 assemblies and 25 sub-assemblies which have been produced by the contractor or furnished by a supplier and which have been manu- f actured using the same production processes, procedures, and equipment which will be used in fulfilling the contract. All par
21、ts and mateitials, including packaging, shall be ob- tained from the same sources of supply as will be used in regular production. The sam- ple shall be accompanied by certificates of analyses for materials. An initial production sample, or porbion thereof, as directed by the contracting officer sha
22、ll also be submitted whenever there is a lapse in production for a period in excess of 90 days, or whenever a change %curs in manufacturing process, material used or supply, as to significantly affect product uniformity as determined by he Government. Prior to submission, the contractor shall inspec
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILD13512B1964DELAYELEMENTNONDELAYM1LOADINGASSEMBLINGANDPACKINGM1 延迟 元件 装载 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-442319.html