ARMY MIL-C-70509-1985 CARTRIDGE 9MM TEST HIGH PRESSURE XM905《XM882型9MM测试高压炮弹》.pdf
《ARMY MIL-C-70509-1985 CARTRIDGE 9MM TEST HIGH PRESSURE XM905《XM882型9MM测试高压炮弹》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-70509-1985 CARTRIDGE 9MM TEST HIGH PRESSURE XM905《XM882型9MM测试高压炮弹》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、5 -3 7- a- MIL-C-70509 13 - 999990b 0355499 T m MIL -C -7 O5 O9 ( AR) 7 February 1985 MILITARY SPEC1 FI CATI ON CAWRIDGE, 9MM, TES?, HIGH PHESSURE, XM905 This specification is approved for use by the US Army Armament, Munitions and Chemical Camand, and is available for use by all Department and Agen
2、cies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers Cartridge, 9MM, Test, High Pressure XM905 intended for use %un proofing of 9MM weapons. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards, Unless otherwise specified, -following-ions a
3、n standards of the issue listed in that issue o the Department. sf Beense Index of Specifications and standards (DsDESSi) specified in the solicitation, form a part of this apecf9.catlon to the extent specified herein. SPECIFICATIONS MILITARY O MIL-A-48078 - Ammi tion Standard Quality Assurance Prov
4、isions, General Specification for STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Table for Inspections by Attributes . MIL-STD-636 - Visual Inspection Standards for Small. Arms Ammunition Through Caliber .50 FSC 1305 Beneficial comments (recommendations, additions, deletions) and any perti
5、nent data which may be of use in improving this document should be addressed to: Commander, US Arm Armament Research and Development Center, Attn. DRSMC-QA, Dover, New Jersey 07801 by using theself-addressed Standardization Document Improvement Proposal (BB Form 1426) appearing at the end of this do
6、cument or by letter. THIS BOCUMENT CONTAINS /& PAGES -_- - - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-70507 13 7777706 0355500 2 W MI L-C -705 O9 ( AR) MIL-STD-644 - Visual Inspection Standards and inspection Procedurs for Inspection of
7、Packaging, Packing and Marking of Small Arms Ammunition DOD-STD-1468 - Small Caliber Ammunition Test Procedures, 9MM Cartridges 2.2.1 Other Government documents, drawings, and publications. The followins other Government doucments, drawinqs, and publications-form a part of this specification to the
8、extent spec if i ed herein. DRAWINGS US Army Armament Research and Development Center 9378265 - Cartridge, 9MM, Test, High Pressure, XM905 7643674 - Classification of Cartridge Case Defects for Small Arms Ammunition 9378266 - Packaging and Marking, Cartridges, 9MM, Test, High Pressure, XM905, Carton
9、s, Box, Ammunition, M2A1, Box, W i rebound LI9378265 - index of inspection Equipment Lists Copies of specifications, standards, drawings, and publications required by manufacturers in connection wiYn specific acquisition functions should be obtained from the contracting activity or as directed by th
10、e contracting officer. 2.2 Order of precedence. In the event of a conflict between the text -his specification and the references cited herein, the text of this specification shall take precedence. 3. EQUIREMENTS 3.1 First article inspection. When specified, a sample shall be subjected to first arti
11、cle inspection. (See 4.3) Unless otherwise specified, the first article shall include the pilot pack. 2 h Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-70504 33 74774Ob 0355503 4 3.2 Material. Materials shall be in accordance with the _. appl
12、icable drawings and specifications. O 3.3, Parts. The parts shall comply with all requirements specified on Dwg. 9378265, all associated drawings, and with all requirements specified in applicable specifications. 3.4 Bullet extraction. The average force necessary to extract the bullet-from the cartr
13、idge case shall be not less than 80 lbs, nor shall any individual extraction force be less than 60 lbs. 3.5 Residual stress. The cartridge case shall not split when -I_ - - subjected to one percent mercurous nitrate solution for 15 minutes. 3.6 Chamber pressure. The corrected average peak chamber pr
14、essure of the cartridge at the case mouth position shall be 276 MPa plus or minus 15 MPa when conditioned and fired at 21OC. The standard deviation of the chamber pressures shall not exceed 11 MFa. When conditioned and fired at the following temperatures, the uncorrected average peak chamber pressur
15、e at each temperature shall not vary by more than plus or minus 20 MPa from the uncorrected average pressure obtained at 21OC. - +38OC 3.7 Wateroroof. When placed under water and subjected to a -A,- one half atmosphere negative pressure for 30 seconds, the cartridge shall not release more than one b
16、ubble of air. 3.8 Primer sensitivity. The energy imparted by a 55 + 0.5 gram steel ball falling 1T:O inches shall initiate all primers. The energy imparted by a 55 + 0.5 gram steel ball falling three inches shall not cause initiation of the primer. 3.9 Workmanship. The requirements for workmanship a
17、re as specified-& the applicable drawings, referenced specifications and the following: 3.9.1 Metal defects. The cartridge shall be free of folds, - wrinkles, deep draw scratches, scaly metal, dents and other defects , 3.9.2 Foreign matter. The cartridge shall be free of -Id- corrosion, stains, disc
18、oloration, dirt, oil, and smears of lacquer. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-70507 13 m 7777706 0355502 b m 4. QUALITY ASSURAMCE PROVISIONS 4.1 Responsibility for inspection and standard y- quality - -. -_ -. assuranceyovision
19、s. - Unless otherwise specified herein or in the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail specification. requirements specified herein are classified as follows: 4.2 Classification of inspections. The inspection -I.-_- -7 a. First Article Inspecti
20、on (Cee 4.3) b. Quality Conformance Inspection (See 4.4) 4.3 First article inspection. - - 4.3.1 Submission. The contractor shall submit a first article sample as designated by the Contracting Officer for evaluation in accordance with the provisions of 4.3.2. The sample shall be manufactured using t
21、he same methods and processes proposed for use in manufacturng the production cartridges. The first article sample shall consist of the following items in sample quantitites as indicated. PART DESCRIPTION DRAWING -I _- QUANT I TY - Cartridge, 9MM, Test, High Pressure, XM905 9378265 2,000 4.3.2 I- In
22、spections to be performed. - See MIL-A-48078 and Table I herein. 4.3.3 Rejection. See MIL-A-48078. -I- c 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4 Q) k 7 rn II al k pi G -rl x 4 4J rn Q) E a $ 5 al 0 am 4 o km UE kX rd U MIL-C-70507 13 7797
23、706 0355503 rn c, k O k Q rn c, U al w al k O w c O -rl ci m c .li .rl n 2 x w O c, W al ci U al n Q 7 II a, Q -I -I rn (0 CI rl 5 2 9 a, rn al -I 3 -I cr d u H H a, 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-70507 13 m 7777906 0355504 T
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC705091985CARTRIDGE9MMTESTHIGHPRESSUREXM905XM882 MM 测试 高压 炮弹 PDF

链接地址:http://www.mydoc123.com/p-442175.html