ARMY MIL-C-70501-1984 CHARGE PROPELLING M204 PAPER PREFORM PROCESS PARTS AND CONTAINER ASSEMBLY《M204型装药推进纸张预制加工零件的集装箱装配》.pdf
《ARMY MIL-C-70501-1984 CHARGE PROPELLING M204 PAPER PREFORM PROCESS PARTS AND CONTAINER ASSEMBLY《M204型装药推进纸张预制加工零件的集装箱装配》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-70501-1984 CHARGE PROPELLING M204 PAPER PREFORM PROCESS PARTS AND CONTAINER ASSEMBLY《M204型装药推进纸张预制加工零件的集装箱装配》.pdf(23页珍藏版)》请在麦多课文档分享上搜索。
1、- MIL-C-70501 13 7779706 0355307 M flwJ4-35 MIL-C-70501 (AR) 8 JUNE 1984 MILITARY SPECIFICATION CHARGE, PROPELLING, M204, PAPER PREFORM PROCESS .PARTS AND CONTAINER ASSEMBLY This specification is approved for use by the US Army Armament, Munitions and Chemical Command, and is available for use by al
2、l Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 This specification covers requirements, quality assurance provisions and packaging for the parts and container assembly manufactured by the paper preform process for the propelling charge designated as Charge, Propelling, M204 and
3、 used on the ammunition for the Lightweight Company Mortar System ( LWCMS ) . 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards. Unless otherwise specified (see 6.2), the following specifications and standards of the issue listed in that issue of the Department of
4、Defense Index of Specifications and Standards (DoDISS) specified in the solicitation, forms a part of this specification to the extent specified herein. SPECIFICATIONS MIL I TARY MIL-A-48078 - Ammunition, Standard Quality Assur- ance Provisions, General Specifica- tion for FSC 1310 Beneficial commen
5、ts (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commander, US Arm Armament Research and Development Center, Attn. DRSMC-QA, Dover, New Lrsey 07801 by using the self-addressed Standardization Document Improvement
6、 Proposal (DD Form 1426) appearing at the end of this document or by letter. I THIS DOCUMENT CONTAINS -a3 PAGES Licensed by Information Handling ServicesMIL-C-70501 13 9499906 0355308 T MIL-C-70501 (AR) STANDARDS MILITARY MIL-STD- 10 5 - Sampling Procedures and Tables for MIL-STD-286 - Propellants,
7、Solid: Sampling, M IL- STD- 41 4 - Sampling Procedures and Tabls for Inspection by Attributes Examination and Testing Inspection by Variables for Percent Defective MIL-STD-810 - Environmental Test Methods 2.1.2 Other Government - documents, drawings and publica- tions. The followins other Government
8、 documents, drawings, and publications form a part of this specification to the extent specified herein. DRAWINGS (See 6.4) US ARMY ARMAMENT RESEARCH AND DEVELOPMENT CENTER (ARDC) 9381562 9345311 9312698 92 93 287 9293439 92 93440 9313703 9313727 - Composition - Container Assembly - Charge, Propelli
9、ng M204 - Packing and Marking Container, Ammunition, Fiber, PA 78 for 60MM Cartridge, HE, M720 with Fuze M734 - Packaging and Marking for Container Ammunition, Metal, PA 70 for 60MM Cartridge, HE, M720 with Fuze M734 - Box, Wirebound, Packing, Ammunition for 60MM Cartridge, HE, M720 with Fuze M734,
10、Packing and Marking - Packing and Marking for Box, Fiber- board, Outer for Charge Propelling, M204 or Container Assembly - Packing for Pallet for Box, Fiber- board, Outer for Charge Propelling M204 or Container Assembly (Copies of specifications, standards, handbooks, drawings and publications requi
11、red by manufacturers in connection with specific acquisition functions should be obtained from the contracting activity or as directed by the contracting officer.) 2.1.3 Order of precedence. In the event of a conflict between the text of this specification and the reference cited herein, the text of
12、 this specification shall take precedence. z Licensed by Information Handling ServicesMIL-C-70501 13 = 7777706 0355307 1 W MIL-C-70501 (AR) -8 - a 3. REQUIREMENTS 3.1 Materials, The materials including packing shall be in accordance with the applkable drawings and specifications. 3-2 Assembiec. Cont
13、ainer assemblies shall comply with all the requirements specified on drawing 9345311 and on all reIated drawings and with all the requirements specified in the appIicable -specifications. 3-3 StabIity heat test (134.5OC). The nitrocellulose in the container assemblies and closre shall not completely
14、 change the color of the methyl violet paper to salmon pink color in less than thirty-five minutes when tested in accor- dance with 4.5-2. 3.4 Residue test, The container assemblies when loaded and fired ballistically shall not leave residue which wil cause cartridge hang-up in the mortar tube, shal
15、l not produce a secondary flame after 2 seconds (sec) minimum (min.) from the primary flame of the cartridge launch and when ired at zone 4, sha11 not produce fIaming debris on the ground . The test shal1 be performed as specified in 4-5.3. 3.5 Percent by weight of resin and additives, kraft and pol
16、yester staple fiber. The percent by weight of resin and additives, kraft and polyester staple fiber shall not be less than 12.95 and not more than 21.55 when tested in accordance with 4-5.1.3.5. 3.6 Homogeneity of material. The material used to manu- facture the parts and assemblies shal be uniform
17、in structure or compositin throughout, The presence of spots of 1/16 inch or larger diameter or any spot which compIetely permeates through the entire thickness of the part of assemby shall indicate non-homogeneity, The presence of thin membrane-like areas shall indicate non-homogeneity. The top and
18、 bottom halves shall not exhibit non-homogeneities including cracks, splits, cuts, tears, rips or holes when tested as specified in 4-5.7. The Government shall establish visual standards prior to production with the assistance of the contractor. 3.7 Compression strength test, The container assemblie
19、s - - shall exhibit a compression strength of not less than 0.9 pounds when tested as specified in 4.5.4. Licensed by Information Handling ServicesMIL-C-70501 13 m 7777906 0355310 MIL-C-70501 (AR) 3.8 Transportation-vibration test. The container assemblies shall be able to withstand the transportati
20、on- vibration procedure of 4.5.5 and subsequently be safe to handle and fire. 3.9 Water repellancy. The container assemblies shall satisfactorily pass the water repellancy test specified in 4.5.6. 3.10 Fin-boom simulation test. The container assemblies shall satisfactorily pass thefin-boom simulatio
21、n test speci- fied in 4.5.8. 3.11 Process description. A process control document, including a complete process description in accordance with DI-P-1604 (Modified) is required during first article. Government review of the process control document is required prior to initiation of production. 3.12
22、First article inspection. - This specification makes provisions for first article inspection. Requirements for submission of first article samples by the contractor shall be as specified in the contract. 3.13 Workmanship. I- 3.13.1 Container parts and assemblies. The container parts and assemblies s
23、hall be free of dirt, grease or other foreign material. 3.13.2 Packaging. The packaging shall be free from foreign material. The boxes shall be assembled without undue binding and no flap shall project beyond the edge of the box when closed. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsiblity for insp
24、ection and standard quality assurance provisions. Unlzs otherwise specified herein or in the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail specification. 4 Licensed by Information Handling ServicesMIL-C-70501 13 m 9999906 0355311 T m MIL-C-70501 (AR) 4
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC705011984CHARGEPROPELLINGM204PAPERPREFORMPROCESSPARTSANDCONTAINERASSEMBLYM204 型装药 推进 纸张 预制 加工

链接地址:http://www.mydoc123.com/p-442168.html