ARMY MIL-C-63108 B-1995 CARTRIDGE IMPULSE M796《M796型脉冲炮弹》.pdf
《ARMY MIL-C-63108 B-1995 CARTRIDGE IMPULSE M796《M796型脉冲炮弹》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-63108 B-1995 CARTRIDGE IMPULSE M796《M796型脉冲炮弹》.pdf(22页珍藏版)》请在麦多课文档分享上搜索。
1、IINCH-POUND I MIL-C-63108B(AR) 27 February 1995 SUP ERS ED I NG MIL-C-63108A(AR) 19 August 1983 MI LI TARY SPEC I FI CATI ON CARTRIDGE, IMPULSE: M796 This specification is approved for use within the u.S. Army Armament, Munitions and Chemical Command, and is available for use by all Departments and
2、Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. The specification covers the parts for, loading assemblinm packing for one type of electrically initiated cartridge, designated as cartridge, Impulse: 796. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications, standards, an
3、d handbooks. The following specifications, standards, and handbooks form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISSI and sup
4、plement thereto, cited in the soiicitat ion. SPEC1 FI CATIONS M I L I TA RY MIL-A-48078 - STANDARDS MI LI T ARY MIL-STD-810- Ammunition, Standard Quality Assurance Provisions, General Specification For. Environmental Test Methods. Beneficial comments (recommendations, additions, deletions) and any p
5、ertinent data which may be of use to improving this document should be addressed to: Commander, O.S. Army ARDEC, ATTN: AMSTA-AR-EDE-S, Picatinny Arsenal, New Jersey 07806-5000 by using the Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter
6、. AMSC NIA FSC 1377 -. Approved for public release; distribution is un1 imi t ed . Licensed by Information Handling Services- - MIL-C-63108B = 9999906 1998022 640 (Unless otherwise indicated, copies of federal and military specifications, standards, and handbooks are available from the Standardizati
7、on Documents Order Desk, Bldg. 4D, 700 Robbins Avenue, Philadelphia, PA 19111-5094. 2.1.2 Other Government documents, drawings, and The following other Government documents, drawings, form a part of this document to the extent specified herein. Unless otherwise specified, the issues are those cited
8、in the solicitation. DRAWINGS (See 6.4) U.S. ARMY ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING CENTER (ARDEC) 9311660 - Cartridge, Impulse: M796 9313890 - Packing and Marking for Box, Exterior for Impulse Cartridge: M796 9313891 - Packing and Marking for CAN, Metal for Impulse Cartridge: M796 1256
9、1412 - Packing and Marking for CAN, Metal for Impulse Cartridge: M796 12561420 - Packing and Marking for Box, Exterior for Impulse Cartridge: M796 U.S. ARMY ARMAMENT MUNITIONS AND CHEMICAL COMMAND (AMCCOM) 19-48-4116/115E - Cartridge, Impulse, XM796 on 4-way Entry Pallets INSPECTION EQUIPMENT DRAWIN
10、GS 9311451 - 9311402 - 9311428 - 9311434 - 9311464 - 9311478 - 9311488 - 9311551 - 9311611 - 9335632 - 9354498 - Payload Module Assembly Countermeasure, chaff: M1 Breech Plate Assembly Dispenser Assembly Printed Wiring Board Assembly, Sequencer Switch Retaining Plate Assembly Plate Assembly, Sequenc
11、er Chaff, Glass Cable Assembly Payload Module Inert Flare for the M130 Aircraft General Purpose Dispenser 2 Licensed by Information Handling Services(Copies of drawings, publications and other Government documents required by contractors in connection with specific acquisition functions should be ob
12、tained from the contracting activity or as directed by the contracting activity). 2.2 Order of precedence. In the event of a conflict between the text of tnis document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicabl
13、e laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 Materials. Materiais shall be in accordance with the applicable drawings and specifications. 3.2 Assembly. The assembly shall comply with all requirements specified on drawing 9311660 and with all requirements
14、in applicable specifications. 3.3 Bridgewire resistance. The resistance of the bridge circuit of the cartridge (between the contact pin and the case) shall be 1.0 + 0.15 ohms when measured at 75 + 15 degrees Fanrenheit with maximum test current of 10 miTliamperes (ma) direct current (dc). 3.4 No-fir
15、e sensitivity. The cartridge shall not fire when subjected to a minimum of 1 ampere cic with a ripple current not to exceed 5 percent. For First Article Inspection, test current shall be applied for 300 seconds mdnimum. For Quality Conformance Inspection, test current shall be applied for 10 seconds
16、 minimum, 15 seconds maximum. 3.5 Environmental requirements. The cartridges shall remain functional after being subjected to the environment tests as specifed in 4.5.3. 3.5.1 Transportation vibration. See 4.5.3.1 3.5.2 Shock. See 4.5.3.2 3.5.3 Humidity. See 4.5.3.3 3.5.4 Aircraft vibration. See 4.5
17、.3.4 3.5.5 Temperature-altitude. See 4.5.3.5 3.5.6 water immersion. See 4.5.3.6 3 Licensed by Information Handling Services NIL-C-b31OBB m 999990b 1998024 413 m 3.6 All-fire sensitivity. The cartridge shall fire when no more than 4.25 amps dc is applied for a maximum of 15 milliseconds (ms) to the b
18、ridge circuit. 3.6.1 Petaling. After functioning the cartridge, the disc shall show visual evidence of petaling on over half of the visible area (i.e., the pie-sections of the disc shall be folded or melted. Burn-through without visual petaling is not acceptable.). 3.6.2 Integrity of criinp. - After
19、 functioning, the cartridge shall exhibit a secure crimp for 3600 between the case and closure washer. 3.7 Pressure-time traces. The cartridge shall produce a pressure vs. time output response with the following characteristics when tested in a closed bomb having a net volume of 43.5 t 1.5 cc with t
20、he impulse cartridge in place. Firing current shall be in accordance with 3.6. a. Rise Time (ms) 25 maximum b. Peak Pressure (psi) 450 minimum 750 maximum C. Slope (psi/ms) 150 maximum d. Total Function Time (ms) 50 maximum NOTES : 1. Rise time shall be the elapsed time between 10% of peak pressure
21、and peak pressure. 2. Slope shall be determined by that portion of the pressure-time trace between 10% and 90% of peak pressure. 3. Total Function Time shall be the elapsed time from First Application of Firing Current (zero time) to max peak pressure. 3.8 Evacuation test. After firing, not more tha
22、n 5% by weight of the chaff shall remin in the cartridge. Firing current shall be in accordance with 3.6. 3.9 Velocity test. Upon ejection, the inert pellet shall have an initial veloccty of 90 to 200 feet per second as measured between four and twelve feet from the test firing fixture. Firing curre
23、nt shall be in accordance with 3.6. 4 Licensed by Information Handling Services NIL-C-63LOBB 9999906 1998025 35T 3.10 First article inspection. This specification contains technical provisions tor tirst article inspection. Requirements for the submission of first article samples by the contractor sh
24、all be as specified in the contract. 3.11 Workmanship. ll parts and assemblies shall be fabricated and loaded in a thorouqh workmanlike manner, and all manufacturing, processing, and asiembly operations shail be correctly performed. They shall be clean and free of burrs, sharp edges, unblended radii
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC63108B1995CARTRIDGEIMPULSEM796M796 脉冲 炮弹 PDF

链接地址:http://www.mydoc123.com/p-442000.html