ARMY MIL-C-51508 A-1985 CANISTER 155MM WP (FOR THE M825 PROJECTILE)《WP 155MM霰弹(M825射弹)》.pdf
《ARMY MIL-C-51508 A-1985 CANISTER 155MM WP (FOR THE M825 PROJECTILE)《WP 155MM霰弹(M825射弹)》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-51508 A-1985 CANISTER 155MM WP (FOR THE M825 PROJECTILE)《WP 155MM霰弹(M825射弹)》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-C-51508A 13 7777906 0334273 7 s -37- G MIL-C-51508A( EA) 6 December 1985 SUPERSEDING MIL-C-51508 (EA) 28 February i985 MILITARY SPECIFICATION CANISTER, 155 MM, WP (FOR THE 825 PROJECTILE) This specification is approved for use within U.S. Army Chemical Research and Development Center, Department
2、 of the Army, and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers one type of filled canister. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards. The following specifications and stan-
3、 dards form a part of this specification to the extent specified herein. Unless otherwise specified, the issu distribution is unlimited. THIS DOCUMENT CONTAINS 8 PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-51508A( EA) STANDARDS MILIT
4、ARY MIL-STD-105 - Sampling Procedures and Tables for Inspection by Attributes. MIL-STD-129 - Marking for Shipment and Storage. MIL-STD-1168 - Lot Numbering of Ammunition. 2.1.2 Other Government documents, drawings, and publications. The following other Government documents, drawings, and publication
5、s form a part of this specification to the extent specified herein. issues shall be those in effect on the date of the solicitation. Unless otherwise specified, the DRAWINGS AND TECHNICAL DATA PACKAGE LIST (TDPL) U.S. ARMY ARMAMENT, MUNITIONS AND CHEMICAL COMMAND , C. CHEMICAL RESEARCH AND DEVELOPME
6、NT CENTER TDPL 15-12-270 - Canister, 155 MM WP. (Copies of specifications, standards, drawings, and publications required by ontractors in connection with specific acquisition functions should be obtained from the contracting activity or as directed by the contracting activity . ) 2.2 Other publicat
7、ions. The following document forms a part of this specification to the extent specified herein. Unless otherwise specified, the issues of the documents which are DOD adopted shall be those listed in the issue of the DODISS specified in the solicitation. Unless otherwise speci- fied, the issues of do
8、cuments not listed in the DODISS shall be the issue of the nongovernment documents which is current on the date of the solicitation. UNIFORM FREIGHT CLASSIFICATION RULES (Application for copies should be addressed to the Uniform Classification Committee , Room 1106, 222 South Riverside Plaza, Chicag
9、o, IL 60606) . (Nongovernment standards and other publicat ions are normally available from the organizations which prepare or which distribute the documents documents also may be available in or through libraries or other informational services ) These 2.3 Order of precedence. In the event of a con
10、flict between the text of this. specification and the references cited herein ( except for associated detail specifications, specification sheets or MS standards), the text of this specification shall take precedence. Nothing in this specification, however, shall supersede applicable laws and regula
11、tions unless a specific exemption has been obtained. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-5150A 13 9999906 033g273 O MIL-C-51508A( EA) 3. REQUIREMENTS 3.1 Materials and components. 3.1.1 Materials. All materials cited on TDPL 15-12
12、-270 shall conform to the specifications listed thereon or to the specific characteristics set forth on . the drawings . 3.1.2 Components. All components of the canister shall conform to %he specifications and drawings listed on TDPL 15-12-270. 3.2 Filling and assembly. 3.2.1 Filling. The canister s
13、hall be heated to 150“ + 10F and then filled with approximately 12.75 pounds (lbs) of molten WP at a temperature of 140“ + 10F (60“ + 5.6“C) using a vacuum assisted dry fill method (see 6.6 and 6.7): The molten-WP shall conform to MIL-C-215. WP, it shall be buffered by a suitable alkaline salt to ma
14、intain pH value between 6.5 and 8.0. After filling, the canister shall be closed, cleaned, and tested for leakage (3.4). VP shall be solidified with the canister in a vertical position and filling port down. When water is in contact with the After successful completion of the leakage test the 3.2.2
15、Filled canister weight. After the canister has been filled and closed, it shall weigh 37.4 2 1.0 lbs (37.3 + 1.0 lbs before welding closure plug) when tested in accordance with 4.2.5.1: 3.2.3 Assembly. Drawing 15-12-270. The canister shall be assembled and closed as specified on 3.2.4 Closure weld s
16、trength. The inertial weld closure shall withstand a dead load axial push-off force of at least l7,OOO lbs when tested in accordance with 4.2.5.2. 3.3 Cleaning. The exterior of the closed canister, the interior of the burster well, and the burster well threads shall be thoroughly cleaned to remove a
17、ll grease, oil, and WP contamination (see 6.7.). 3.4 .Leakage. The closed and cleaned canister shall not leak when tested in accordance with 4.2.5.3. 3.5 Workmanship. The canister shall be free from foreign matter (oil, grease, or viscous material) and damage such as dents, cracks, or deformation) w
18、hich could affect its intended use. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-flIL-C-5L50A 13 m 999990b 0334274 2 m ?- I MIL-C-51508A( EA) 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the co
19、n- tract or purchase order, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection req
20、uirements speci- fied herein, unless disapproved by the Government. In addition, the Government reserves the right to perform any of the inspections set forth in the specifi- cation where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.1.1
21、Responsibility for compliance. All items must meet all requirements of sections 3 and 5. The inspection set forth in this specification shall become a part of the contractors overall inpsection system or quality program. The absence of any inspection requirements in the specification shall not relie
22、ve the contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all require- ments of the contract. Sampling in quality conformance does not authorize sub- mission of known defective material, either indicated or actual, nor do
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC51508A1985CANISTER155MMWPFORTHEM825PROJECTILEWP155MM 霰弹 M825 射弹 PDF

链接地址:http://www.mydoc123.com/p-441819.html