ARMY MIL-C-50494-1972 CAP BLASTING PRACTICE M10 PARTS FOR ASSEMBLING AND PACKING《实战用起爆雷管零件 组装和包装》.pdf
《ARMY MIL-C-50494-1972 CAP BLASTING PRACTICE M10 PARTS FOR ASSEMBLING AND PACKING《实战用起爆雷管零件 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-50494-1972 CAP BLASTING PRACTICE M10 PARTS FOR ASSEMBLING AND PACKING《实战用起爆雷管零件 组装和包装》.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、c III L- c - 5 o 4 g 1 ( rw I 2.2 February 1972 ru rA I TA HY s PI.; c I FI c AT I ON CAP SLASTING, PRACTICE mo PARTS FOR, ASSZM3LINC A?JD PACKIHG 1. SCOPE 1.1 This specification covers the paits for and assembling and packing for one type of inert blasting cap designated as Cap, Blasting, Practice,
2、 M10. 2. APPLICABLE DOCUMENTS 2.1 The following documents, of the issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-A-2550 - Amnunition and Special Weapons; General Specification for S
3、TANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables MIL-STD-109 - Inspection Terns and Definitions MIL-STD-1168 - Lot Numbering of Amaunition MIL-STD-1169 - Packaioii.-U1i:ess otherwise specified ir1 the contract or purchase orcier, the supplier is responsible for the perfornarice ol” all
4、 inspectioil requirenents as specified herein, Except as otherwise specified in the contract or order, the suppllei. ray use his oiln or any other facilities suitable for the perforriance of the inspection requirements specified hei-ein, uiilens disapprovcci by the Governnerit . The Goverricierit re
5、serves the right to perforrn any of the inspections set forth iii the specification where such inspections are deened necessary to assure supplies and services confori:i to prescribed requirencnts . Reference shall be mae to MIL-STD-109 to defirie terns used herein. The provisions of MIL-A-2550 shal
6、l apply. lot of items deliverable under the contract is submitted to the Government for acceptance, the contractor shall supply the following information acconpanied by a certificate which attests that the information provided is correct and applicable to the pioduct beirig subriitted: 4.1.1 Submiss
7、ion of product.-At the time each coilipleted a. A statement that the lot cor3plies with all of the quality assurance provisions specified in this specification. b. Drawing and specification nuinber and date, together with identification and date of changes thereto. C. A statement that all naterial p
8、urchased by the contractor meets requirements, when such material is controlled by Government or commercial specifications referenced in any of the contractual documents, and that certificates of conformance are on file and available for review, d. Number of itens in the lot. e. Date submitted. The
9、certificate shall be signed by a responsible agent of the certifying organization. The .initial certificate Submitted shall be substantiated by evidence of the agents authority to bind his principal. will not be required with subsequent certificates unless, during the course of the contract, this au
10、thority is vested in another agent of the certifying organization. Substantiation of the agents authority c 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-50494 (MU) 4.2 First Article Inspection 4.2.1 Prior to the start of regular production
11、, the contractor shall submit a first article sample, as designated by the contract, for evaluation in accoruance with the provisions of 4.2.2. of items which have been produced by the contractor or furaished by a supplier and which have been manufactured using the sane production processes, procedu
12、res and equipment which will be use in fulfilling tne contract. All parts and materials, including packaging and packing components shall be obtained from the sane source of supply as will be used in regular production. Prior to submission, the contractor shall inspect the sample to the degree neces
13、sary to assure that it conforrns to the requirements of the contract an he shall submit a record of this inspection with the sample, including certificates of confornance of materials. A sample containing known defects shall not be submitted unless specifically authorized by the contracting officer.
14、 A first article sanple, or portion thereof, as directed by the contracting officer shall also be subnitted whenever there is a lapse in proauction for a period in excess of 90 days, or whenever a change occurs in nanufacturing process, material used, drawing or specification such as to significantl
15、y affect product uniformity as deternineci by tne Governnent. In the event of rejection, the Governnent reserves the right to require the contractor to take corrective action and submit an additional sanple or portion thereof of itens for first article inspection. Until a first article sanple is acc
16、epted, the contractor is, in no way, authorized by the Government to initiate regular production unless otherwise directed by the contracting officer. The first article sample shall consist 4.2.2 First Article Inspection Provisions 4.2.2.1 Glasting Cap Asse!nblies 4.2.2.1.1 Submission.-Thirty-two (3
17、3) complete assemblies shall be subrfiitted to a Governnent apZ)rove laboratory designated by the contract. 4.2.2.1.2 Inspections to be pf?rfor:?eci.-The cornplete assemblies will be subjected to any or all of the inspections specified in 4.3.2. j, 4.3.2.6, 11.3.2 . aiiu 4.3.2.8 and the tests specif
18、ied in 4.3.3 of this specification and any or all .I requirements of the applicable drawings. 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-C-50Y94 13 W 9979906 0327697 b I with shall 4.2.2.1.3 Rejection.-If any asseribly fails to conply the
19、 applicable requirenents, the first article sample . be rejected. The Government reserves the right to terminate its inspection of tne first ai.ticle sample upon any failure of an item to conply witn any of the requirements as specified. 4.3 Inspection Provisions 4.3.1 Lot fornation.-The tern “inspe
20、ction lot“ as used in this specification is defined as an essentially homogeneous collection of units of product fron which a representative sample is drawn arid inspected to deterinirie conformance with applicable requirenents. The sample selected shall represent only that quantity of: units fron w
21、hich the sample was drawn and shall not be coiistrued to represent any prior or subsequent quantities presented for inspection. Homogeneity shall be considered to exist pi-ovided the inspection lot has been produced by one nanufacturer, in one unchanged process, using the sane i;iaterials and nethod
22、s in accordance with the same drawings, sane drawing revisions, sane specifications and same specification revisions and conplies with the provisions for submission of product as specified in MIL-STD-105. Chanzes to the process, specification, or drawing not affecting safety, performance, interchang
23、eability, or storage, as determined by the Government, shall not be deemed to alter the homogeneity of an inspection lot. All material submitted for inspection in accordance with this specification shall comply with the homogeneity criteria specified herein regardless of the type of sanpling procedu
24、re which is being applied to determine conforrnance with requirements. Lot numbering, as required, shall be in accordance with MIL-STD-1168. Each inspection lot of complete assemblies shall contain parts of one kind from one supplier. 4.3.2 Examination.-The examinations listed in the following subpa
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC504941972CAPBLASTINGPRACTICEM10PARTSFORASSEMBLINGANDPACKING 实战 起爆 雷管 零件 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-441718.html