1、- _- . - . .- _- - - - - - - - -_ - MIL-C-504b3 13 7779706 0327552 2 PIIL-C -5 O 4 6 9 ( MU ) 14 January 1970 Sunerseding (see para. 6.3.6) MILITARY SPEC IF1 CATION CHARGE, SUPPLEMENTARY FOR DEEP CAVITY LOADED PROJECTILE, PARTS FOR 1. SCOPE 1.1 This specification covers the metal pa.rts, for supplem
2、entary charge, for deep cavity loaded projectiles. 2. APPLICARLE DOCUMENTS 2.1 The followlns documents of the issue in effect on date of invitation for bids or request for pronosals form a part of this specification to the extent snecified herein. SPECIFICATIONS MILITARY MIL-A-2550 -Ammunition and S
3、pecial Weapons, MIL-1-45607 -Inspection Equiprent, SupFly and General Speciflcation for Maintenance of STANDARDS MILITARY MIL-STD-105 -Sampling Procedures and Tables for MIL-STD-109 MIL-STD-1168 -Lot Numbering of Amunition MIL-STD-1169 -Packing and Marking for Shipment of MIL-STD-1235 -Single and Mu
4、ltilevel Continuous Inspection by Attributes (ABC-STD-105) -Quality Assurance Terms and Defintions Inert Ammunition Cormonents: General Specification for Sampling Procedures and Tables for Inspection by Attributes DRAWINGS ARMY 8838201 - Body 8838202 - Disc, Closing ? Provided by IHSNot for ResaleNo
5、 reproduction or networking permitted without license from IHS-,-,- MIL-C-50qb7 13 7777906 0327553 4 MIL-C-50469 (MU) 8838203 - Pad 9248215 - Supplementary Charge Parts Arrangement 8858820 - Disc PUBLICATIONS ARMY ET-9248215 - Equipment Tabulation (Copies of specifications, standards, drawings and p
6、ublications required by contractors in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer.) Other publications.-The following documents form a part of this specification to the extent specified herein. Unless otherw
7、ise indicated, the issue in effect on the date of invitation for bids or request for proposal shall apply. ASTM-D461 Application for copies should be addressed to: American Society for Testing and Materials 1916 Race St., Philadelphia, Pa. 19103 3 REQUIREMENTS 3.1 Materials.-Materials shall be in ac
8、cordance with 3.2 Parts.-The parts shall comply with all requirements applicable drawings and specifications. specified on drawing (dwg) 8838201, 8838202, 8838203 and 8858820 as applicable and with all requirements specified in applicable specifications. 3.3 Workmanship.-All parts shall be dry and f
9、ree of chips, burrs, dirt, grease, rust and other foreign material. The cleaning method shall not be injurious to any of the parts, nor shall the parts be contaminated by the cleaning agent. 4. QUALITY .ASSURANCE PROVISIONS 4.1 Responsibility for inspection.-Unless otherwise specified in the contrac
10、t or purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract or order, 2 . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-_- I_ MIL-C-50Ltb7 13
11、 E 77777Ob 032755LI b W the supplier may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where su
12、ch inspections are deemed necessary to assure supplies and services conform to prescribed requirements. Reference shall be made to Standard MIL-STD-109 in order to define terms used herein. The provisions of Specification MIL- A-2550 shall apply. 4.1.1 Submission of product.-At the time the complete
13、d lot of product is submitted to the Government for acceptance, the contractor shall supply the following information accompanied by a certificate which attests that the information provided is correct and applicable to the product being submitted: a. A statement that the lot complies with all of th
14、e quality assurance provisions specified within this specification. b. Number of units of product inspected. c. Results obtained, by defect code, for all inspections performed. d. Drawing, specification number and date, together with an identification and date of changes. e. Certificates of conforma
15、nce on all material purchased by the contractor when such material is controlled by the Government or commercial specifications referenced in any of the contractual documents. The certificate shall be signed by a responsible agent of the certifying organization. The initial certificate submitted sha
16、ll be substantiated by evidence of the agents authority to bind his principal. Substantiation of the agents authority will not be required with subsequent certificates unless, during the course of the contract, this authority is vested in another agent of the certifying organization. f. Number of it
17、ems in the lot. g. Date submitted. 4.2 First Article Inspection 4.2.1 Submission.-The contractor shall submit a first article sample as designated by the contracting officer for evaluation in accordance with the provisions of 4.2.2. The first article sample shall consist of 25 sets of parts which ha
18、ve been produced by the contractor or furnished by a supplier and which have been manufactured using the same production processes, procedures and equipment which will be used in fulfilling the contract. All parts and materials, including packaging and packing, shall be obtained from the same source
19、 of supply as will be used in regular production. Prior to submission, the con- tractor shall inspect the sample to the degree necessary to assure that it conforms to the requirements of the contract and - 3 ., . . -. . Provided by IHSNot for ResaleNo reproduction or networking permitted without lic
20、ense from IHS-,-,-L. . -_- MIL-C-50469 13 I 7777906 0327555 submit a record of this inspection with the sample, including statements of findings for materials, processes and tests. A sample containing known defects will not be submitted unless specifically authorized by the Contracting Officer, A fi
21、rst article sample, or portion thereof, as directed by the Contracting Officer, shall also be submitted whenever there is a lapse in production for a period in excess of 90 days or whenever a change occurs in manufacturing process, material used, drawing or specification such as to significantly aff
22、ect product uniformity as determined by the Government. 4.2.2 Inspection to be performed.-Assemblies and components will be subjected by the Government to any or all the examinations or tests specified in 4.3.2 of this specification and any or all requirements of the applicable drawings. 4.2.3 Rejec
23、tion.-If any assembly or part fails to comply with the applicable requirements, the initial production sample shall be rejected, In event of rejection, the Government reserves the right to require the contractor to take corrective action and submit new or supplemental quantities until such time as a
24、n acceptable sample is submitted or until otherwise directed by the contracting officer. 4.3 inspection provisions 4.3.1 Lot formation.-The term “lot“ as used throughout this specification refers to an inspection lot, which is defined as an essentially homogeneous collection of units of product from
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC504691970CHARGESUPPLEMENTARYFORDEEPCAVITYLOADEDPROJECTILEPARTSFOR 装有 装弹 零件 补充 组件 装药器 PDF

链接地址:http://www.mydoc123.com/p-441713.html