ARMY MIL-C-48360-1980 CHARGE PROPELLING M200 FOR 105MM HOWITZER M119 LOADING ASSEMBLING AND PACKING《M119型105MM手榴弹用M200型装药推进器的装卸 组装和包装》.pdf
《ARMY MIL-C-48360-1980 CHARGE PROPELLING M200 FOR 105MM HOWITZER M119 LOADING ASSEMBLING AND PACKING《M119型105MM手榴弹用M200型装药推进器的装卸 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-48360-1980 CHARGE PROPELLING M200 FOR 105MM HOWITZER M119 LOADING ASSEMBLING AND PACKING《M119型105MM手榴弹用M200型装药推进器的装卸 组装和包装》.pdf(19页珍藏版)》请在麦多课文档分享上搜索。
1、5-37-05 - MIL-(2-48360 (AR) 3 July 1980 5 MILITARY SPECIFICATION CHARGE, PROPELLING, M200, FOR 105MM HOWITZER, M204 LOADING, ASSEMBLING, AND PACKING This specification is approved for use by the US Army Armament Research and Development Command, and is available for use by all Departments and Agenci
2、es of Department of Defense. 1. SCOPE 1.1 This specification covers the loading, assembling, and packing for one type of Propelling Charge designated as M200 for the 14204 Howitzer. 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on the date of invitation for bids, or requ
3、ests for proposals, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-A-48078 STANDARDS MILITARY MIL-STD- 10 5 MIL - STD- 12 9 MIL-STD-414 MIL-STD-123 5 -Ammunition, Standard Quality Assurance Pro- visions, General Specification for -Sampling Procedures an
4、d Tables for I ns pec ti on by At t r i but es -Marking for Shipment and Storage -Sampling Procedures and Tables for Inspection by Variables for Percent Defective Single and Multilevel.Continuous . Sampling Procedures and Tables for Inspection by Attributes. FSC: 1315 Beneficid commenta (recommendat
5、ions, additions, deletions) and any pertinent data which may be of une in improving this document should be addrgvted to: Commander, us Amy Armament Research and Development Command, Attn. DRDARQA, Dover, New Jersey 07801 by wing the sdf-addreed Standardization Document Improvement fioposal (DD Fom
6、1426) appearing at the end of this document or by letter. I I / _. I - =- Ali# Licensed by Information Handling ServicesMIL-C-LI8360 33 a 9999906 0339297 5 a- - MIL-C-48360 (AR) DRAWINGS (see 6.Q) U.S. ARMY ARMAMENT RESEARCH AND DEVELOPMENT COMMAND 9217087 9282042 (Copies of speci -Marking Diagram a
7、nd Sealinq of Steel Drums for Shipment of Propellants and Ragqed Charges -Charqe, Propellj.ng M200 Loading Assembl-y cations, standards, drawings and nublications reqired bv contractors in connection with soecific procurement functj.ons shou1.d be obtained from the procurinq activity or as directed
8、by the contra-ctinq officer .I 2.2 Other publ-ications. The followinq document forms a part of this soecification to the extent specified herein. Unl.esc otherwise indicated, the i.ssue in effect on date of invitations for bids chal!. applv. CODE OF FEDERAL REGULATIONS Title 49 Transportation, CFR 4
9、9 Part 1.00-19c) (The Interstate Commerce Commission Regulations are now a Dart of the Code of Federal. Regulations, avai.1-able from the Superintendent of Documents, U.S. Government Printing Officer, Washinqton, D.C. 20402. Orders for the above oubl-ications should cite, “49 CFR 100-1.99“. (Latest
10、revision ). 3. REQU IREMEN3 3.1 Material. Material shall be in accordance with aDpl.icable drawings and specif i-cations. shall complv with all. requirements specified on Drawj-ng (d.wg) 9282042 and with all the requirements specified in applicable specifications. . 3.3 PropeL1.ant weight. The net w
11、eight of the mouellant shal.1 not differ by more than the 0.07 ounce from that specified in the 1. oad i ng au tho r i z a t i on . 3.2 Propelling charge assemb1.v. The propel-ling charqe assembl-Y , 2 = .,- Licensed by Information Handling ServicesMIL-C- 48 36 O (AR) 3.4 Proving ground. The propell
12、ing charge, when fired in the M204 Howitzer and with the weight of projectile (33 lbs + 0.10 lbs) for which it was manufactured, shall comply with the following requirements when tested as specified in 4.5.3. 3.4.1 PIMP Pressure (+145OF). The propelling charg I at recommended charge weight, shall no
13、t produce a PIMP (permissible individual maximum pressure) greater the 57,000 psi at +145OF when fired in a 14204 Howitzer. 3.4.2 Average Pressure (+145OF). The propelling charge, at recommended charge weight, shall not produce an average chamber pressure greater than 54,000 psi at +145OF when fired
14、 in a M204 Howitzer. 3.4.3 Average pressure.(70F). The propelling charge at recommended charge weight shall function and not produce an average chamber pressure greater than 47,000 psi when fired in a M204 Howitzer. 3.4.4 Muzzle velocity. The muzzle velocity at 70O temperature shall not be less than
15、 2170 feet per second nor greater than 2220 feet per second and the standard deviation of the lot shall not be greater than 8 feet per second. 3.5 First article inspection. This specification contains technical provisions for first article inspection. Requirements for the submission of first article
16、 inspection by the contractor shall be as specified in the contract. 3.6 Workmanship. The propellant grains shall be free of dirt, foreign material and other defects that would make the item unsuitable for its intended use. The cloth and thread used for the manufacture of propelling charge bags shal
17、l be void of grease, oil, dirt, foreign material, holes, rips or tears. All components and assemblies shall be fabricated and finished in a thorough workmanlike manner. All required marking shall be neat and sharply defined . 4. QUALITY ASSURANCE PROVISIONS - 4.1 Responsibility for inspection and st
18、andard quality assurance provisions. Unless otherwise specified herein or in the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail specification. Licensed by Information Handling ServicesMIL-C-4 83 60 (AR) 4.2 Classification of inspections. The following t
19、ypes of inspection shall be conducted on this item: a First Article Inspection b. Quality Conformance Inspection 4.3 First article inspection 4.3.1 Submission. The contractor shall submit a First Article sample as designated by the contracting officer for evalua ion in accordance with provisions of
20、4.3.2. consist of fifteen (15) propellant charge assemblies packed in a fiber drum and fifteen (15) complete sets of parts (i.e. 15 each of every component and every sub-assembly) which have been produced by the contractor. The First Article sample shall 4.3.2. Inspection to be performed. The First
21、Article assemblies submitted in accordance with 4.3.1 will be subjected by the Government to any or all the requirements of the applicable drawings and to the inspections of Table I. All- inspections listed in Table I shall be classified Major unless otherwise specified. 4.3.3 Rejection. See MIL-A-4
22、8078, 4 Licensed by Information Handling ServicesNIL-C-483bO I3 W 777770b 0337300 I W VI VI I- +a rl P a, ffl 2 n O i n 8 e .rl rl rl a, k pi a, M k (d A7 u n w I- K O Z I- 0 I w ;i r m Cu J 3 3 rl Cu Cu J Ln 3 J (u Cu (u (u m m m m m m k2 O O d w O O d w O O d w w O O O O 4 rl m o a, k a, R ffl a,
23、k o a Licensed by Information Handling ServicesMIL-C-48360 (AR) 4.4 Quality conformance inspection 4.4.1 Inspection lot information. Inspection lots shall comply with the Lot formation provisions of MIL-A-48078. In addition, inspection lots of propellant shall contain M30 propellant, Type I, from no
24、t more than one lot from one manufacturer. 4.4.2 Examination. See MIL-A-48078. a. Inspection for Critical Defects (and Major Defects, when so Specified) shall be 100 percent. b. Unless otherwise specified in the Classification of Defects and Test Tables, sampling plans for Major and Defects shall be
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC483601980CHARGEPROPELLINGM200FOR105MMHOWITZERM119LOADINGASSEMBLINGANDPACKINGM119 105 MM 手榴弹 M200

链接地址:http://www.mydoc123.com/p-441609.html