ARMY MIL-C-48360 (5)-1998 CHARGE PROPELLING M200 FOR 105MM HOWITZER M119 LOADING ASSEMBLING AND PACKING《M119型105MM手榴弹用M200型装药推进器的装卸 组装和包装》.pdf
《ARMY MIL-C-48360 (5)-1998 CHARGE PROPELLING M200 FOR 105MM HOWITZER M119 LOADING ASSEMBLING AND PACKING《M119型105MM手榴弹用M200型装药推进器的装卸 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-48360 (5)-1998 CHARGE PROPELLING M200 FOR 105MM HOWITZER M119 LOADING ASSEMBLING AND PACKING《M119型105MM手榴弹用M200型装药推进器的装卸 组装和包装》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、IINCH-POUND 1 MIL-C-48360 (AR) AMENDMENT5 30 September 1998 SUPERSEDING AMENDMENT4 12 March 1993 MILITARY SPECIFICATION CHARGE, PROPELLING, M200 FOR 105MM HOWITZER, M119 LOADING, ASSEMBLING AND PACKING This Amendment forms a part of Military Specification MIL-C-48360 (AR), dated 3 July, 1980, and is
2、 approved for use by the US Army Research Development and Engineering Center, and is available for use by all Departments and Agencies of the Department of Defense. PAGE 1 Title: Delete “M24” and substitute “M1 19”, and whenever it appears in this specification. PAGE 3 3.4.3: Delete “47,000 PSI and
3、substitute “46,500 PSI”. 3.4.4: Delete in its entirety and substitute new paragraph 3.4.4: “3.4.4 Muzzle velocitv and velocitv standard deviation. The muzzle velocity of 70 degrees F temperature shall not be less than 2052 feet per second nor greater than 2102 feet per second and the standard deviat
4、ion of the lot shall not be greater than 8 feet per second.” Add new paragraph: “3.7 Initiai production test. This specification contains provisions for the submission of an initial production sample. This is a one time qualification test for a new contractor to load, assemble and pack M200 propelli
5、ng charges. Test samples shall be withdrawn from the first lot produced by the contractor. Charges will be tested in accordance with all the requirements of this specification and Table II (see 6.10). Until the initial production sample has been found to be acceptable, the contractor is in no way au
6、thorized by the Government to initiate production of a second lot unless otherwise directed by the contracting officer.” 1 of4 AMSC NIA FSC 1315 DISTRIBUTION STATEMENT A. Approved for public release; Distribution is unlimited. Licensed by Information Handling Services D 999990b 2081052 825 9 MIJ-483
7、60 (AR) AMENDMENT5 PAGE 4 4.2: Add the following: %. Initial Production Inspection (see 6. lo).” PAGE 5 Table I: Delete “Foil, Lead” and “(Dwg 9282047)”; and substitute “Cloth, Lead Laminate wg 12913756)”. 4.4.1: Add the following: “An entire lot of propellant shall be utilized in the formation of o
8、ne lot of propelling charges unless otherwise directed by the Contracting Officer.” 4.4.2.b: Delete “Major and Defects” and substitute “Major and Minor Defects.” PAGE 7 4.4.2.1: Delete Major Defects 102 and 103 in their entirety. PAGE 8 4.4.2.2: Title: Delete Toil Lead” and substitute “Cloth, Lead,
9、Laminate”. Major Defect 101: Delete “Length” and substitute “Established Length”. Major Defect 102: Delete Width” and substitute “Established Width”. PAGE 9 4.4.2.3: Major Defect 103: Delete Zength from edge of lead foil to edge of liner” and substitute “Body seam improperly assembled”. Delete “Gagd
10、Scale” and substitute “visuai”. Major Defect 104: Delete in its entirety. 2 Licensed by Information Handling Services0b 2083053 i63 MIL-C-48360 (AR) AMENDMENT 5 PAGE 10 * 4.4.2.4: Add Critical 1 and Majors 105 and 106 as follows: Category Examination or Test Req. Para. Para Ref. Critical 1 Proving G
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC4836051998CHARGEPROPELLINGM200FOR105MMHOWITZERM119LOADINGASSEMBLINGANDPACKINGM119 105 MM 手榴弹

链接地址:http://www.mydoc123.com/p-441608.html