ARMY MIL-C-48171-1975 MILITARY SPECIFICATION nCARTRIDGE 81MM HE M374A3 LOADING ASSEMBLING AND PACKING《M374A3型81MM高爆炮弹的装卸 组装和包装》.pdf
《ARMY MIL-C-48171-1975 MILITARY SPECIFICATION nCARTRIDGE 81MM HE M374A3 LOADING ASSEMBLING AND PACKING《M374A3型81MM高爆炮弹的装卸 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-48171-1975 MILITARY SPECIFICATION nCARTRIDGE 81MM HE M374A3 LOADING ASSEMBLING AND PACKING《M374A3型81MM高爆炮弹的装卸 组装和包装》.pdf(15页珍藏版)》请在麦多课文档分享上搜索。
1、MILITARY SPECIFICATION CARTRIDGE, 81, HE, M374A3 LOADING, ASSEMBLING AND PACKING This specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 This specification covers the loading, assembling and packing for one type of high explosive mortar cartr
2、idge desLgnated as Cartridge, 81, HE, M374A3. 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids or request for proposals form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL- A- 2 5 5 O MIL-C-00401 STAND
3、ARDS MILITARY MIL- STD- 105 MIL-STD-109 MIL-STD-453 MIL-STD-3168 MI L-S TD- 12 3 5 -Ammunition and Special Weapons, General Specification for -Composition B, Military Specification for -Sampling.Procedures and Tables for Inspection by Attributes (-ABCr.STD- -Quality Assurance Terms and Defini -Inspe
4、ction, Radiographic -Lot .Numbering of Ammunition -Single and Multilevel Continuous Sampling Procedures and Tables for Inspection by Attributes PRODUCT AND PACKING DRAWINGS ARMY 9241291 -Cartridge, 81MM, HE, N374A3 W/Fuze, PD, M524A6 ,105 . tions 9230175 9278234 -Box, Wirebound, Packing, Ammo for 81
5、MM Mortar 9287601 -Container, Ammo, Fiber, M252A4, For 81MM -Packing however, the use of a densitometer is recommended. 4.3.1.2 Check of photographic density of film.-The photo- 4.3.2 The cartridges shall be fired from a standard 8im mortar One half of the sample Proving ground test.-The test shall
6、be performed at a Government Proving Ground in accordance with the applicable USATECOM Acceptance Test Procedure. at an elevation of forty-five degrees, cartridges shall be fired at charge one and the other half at charge nine. All fuzes shall be set for superquick functioning. The individual veloci
7、ties, pressures and ranges shall be recorded .on the firing record, Observation shall be made for misfires and duds, and shall be recorded. In the event of a misfire, the ignition cartridge shall be removed and forwarded to Picatinny Arsenal. Misfired ignition cartridges shall not be disassembled by
8、 the proving ground. Should a premature burst or metal parts separation occur, a photograph shall be taken of the evidence and attached to the firing record, The velocity and range standard deviations and arithmetic averages shall be calculated and recorded. Range probable error shall be calculated
9、and recorded. Temperature of the day, weather and the time of firing shall also be recorded. Hawk radar shall be used to observe for metal parts separa- tion, unobserved short rounds and unobserved duds. In these events, an analysis should be made of the radar data and should be noted on the firing
10、record. This shall include a comparison of times of flight of the unobserved rounds with that of the normal rounds. Prints of the radar traces of those rounds, and prints of the preceeding and succeeding rounds, shall be attached to the firing record. Data from ballistically acceptable lots may be d
11、iscarded. Smear camera shall be used to photograph all samples, The camera shall be positioned to pick up each round just outside the second velocity coil. Should an umbserved dud, short round or any other abnormal performance occur, a photo print of these rounds, and prints of all the other rounds
12、in-that particular charge zone, shall be attached to the firing record. Film from acceptable lots may be discarded. 11 .= .* Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-48171 13 777790b 031b745 T 4.3.2.1 Test validity.-If for any reason the
13、 proving ground or Picatinny Arsenal considers that the test conditions have detrimentally affected the test results, the test results shall be declared invalid and a new test shall be performed on additional sample cartridges. 4.3.3 Strength of heat weld.-The sample shall be tested for integrity by
14、 applying the required load at the heat weld radially and in a direction away from the axis (center) of the ring. 5. PREPARATION FOR DELIVERY 5.1 Level of packaging and packing.-Packaging and packing shall conform to Level A, as established in DOD Instructions 4100.14 Wnform Preservation - Packaging
15、, Packing and Marking of Items of Supplyt1. 5*2 Packaging, packing and marking.-Packaging, packing and marking shall be in accol-dance with dwg. 9230175 and dwg. 928 7 601. 6. NOTES 6.1 Ordering data.-Procurement documents shall specify the a, Title, number and date of this specification. bo Data ca
16、rds.-Data cards shall be prepared for each following: lot in accordance with the information specified in Standard 6.2 Inspection equipment designs.-Inspection equipment MIL-STD-1167. designs are of two types-Government Special Inspection Equipment (SIE) designs and Contractor Designs. SIE designs a
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC481711975MILITARYSPECIFICATIONNCARTRIDGE81MMHEM374A3LOADINGASSEMBLINGANDPACKINGM374A3 81 MM 炮弹

链接地址:http://www.mydoc123.com/p-441592.html