ARMY MIL-C-48171 (7)-1990 CARTRIDGE 81MM HE M374A3 LOADING ASSEMBLING AND PACKING《M374A3型81MM高爆炮弹的装卸 组装和包装》.pdf
《ARMY MIL-C-48171 (7)-1990 CARTRIDGE 81MM HE M374A3 LOADING ASSEMBLING AND PACKING《M374A3型81MM高爆炮弹的装卸 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-48171 (7)-1990 CARTRIDGE 81MM HE M374A3 LOADING ASSEMBLING AND PACKING《M374A3型81MM高爆炮弹的装卸 组装和包装》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-C-18171 (AR) AMENDMENT 7 20 May 1990 SUPERSEDING AMENDMENT 6 05 July 1988 MILITARY SPECIFICKION CARTRIDGE, 81MMM, HE, M374A3 LOADING, .ASSEMBLING AND PACKING This amendment forms a part of Military Specification MIL-C-48171 (PA), dated 14 January 1975, and is approved for use by the U.S. Army Ar
2、mament, %nitions and Chemical Command, and is available for use by all Departnients and Agencies of the Department of Defense. PAGE 1 2.1, To the list of Military Specifications, add the following: 1WL-C-48156 - Cartridge, Ignition, M299, Loading, Asseriibling and Packing“. Following line 21: Add 11
3、9312548 - Cartridge, 81bll4, HE, W74A3 W/O Fuze“. Line 22: Drawing 1f92412911t delete W/Fuze, P, M524A6l and substitute W/Fuze, PD, M56711. Line 24: Delete 19230175 - Container .,. in Jungle Wrap“ and substitute 1t9276596 - Container Amnunition, Fiber, M252A5 for 81MM Mortar Ammunitiont1 . At bottom
4、 of page: Add 9287603 - Packing and Marking for Container, Fiber, M252A5, Anmo for 81MM Amno in Jungle Wrap“. PAGE 2 # 2.1, Add under Inspection Equipment Drawings as follows: 9280418 - Fin Distortion Gagetf. 3.2, Line 2: Add Ifor 9312648, whichever is applicable.1t PAGE 3 3.5.2, Delete ltninctionTf
5、 and substitute Vunction high order“. AMC;C N/A 1 of 7 FSC 1315 DISTRIBUTION STATEMENT A, Approved for public release; distribution is unlinited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-48171 (7) L3 797770b 0438747 b YIL-C-48171 (AR) AM
6、ENDMENT 7 PAGE 5 4.2.2, Line 4: Delete Yhspection for Critical Defects (and Major Defects, when so specified)“ and substitute ttInspection for Critical Defects and Special Defects (and Major Defects, when so specifiedOt1 Line 12: Examination, insert the following before the last sentence of the para
7、graph: “The contractor may elect to perform 100% inspection with automated equipcnent or impose mndatory process controls on automated operations in lieu of conducting sampling inspection for defects listed in this specification. in such cases, calibration plans shall be submitted to the Technical A
8、gency (see 6.8) for approval for each automatic inspection station and process control plans must be submitted for approval for each of the automated operations, The plans shall identify; (1 ) the frequency (production interval) for validating equipment functioning, description of niaterial control
9、procedures to be imposed on product passing through each automated station during the production interval between validations. Under these provisions final acceptance will be withheld from material produced during a production interval until satisfactory validation of each of the automated stations
10、so controlled. in the event of a validation failure of any station, the material processed through such station since the last acceptable validation shall be placed in a rejected status pending correct ive act ion . (2) the defect standards and (3) a PAGE 6 4.2.2.1, Line 2: Delete 19241291 Ifc at en
11、d of line and add “9241291 or 931 2648. 4.2.2.2, Line 3: Delete 1t92412911f and add 9241291 or 9312648.0 4.2.2.2, Line 8: Delete lt101. Depth .*. mx . Gage CDtl add new catagory heading, major: 100 percent inspection 101. Depth of fuze well, mx . . . Gage CD.“ 4,2.2,3, Line 2: Delete tt92412911t and
12、 add It9241291 or 9312648.tt Line 6: Delete Writical 2. High explosive extends beyond top of liner . Visual“ in its entirety. 4.2.2.3.1, Add new paragraph as follows: t14.2.2.3.1 Charge, Propelling, M205 (see dwg. 92805881, Note a Critical 1. propellant shall escape . . . Visual Container or contain
13、er seal damaged to the extent that (see 4.3.4) Major 101. Container or container seal damage but not to the extent that propellant shall escape (100% inspection) . Visual (see 4.3.4) . Minor: None defined - 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from I
14、HS-,-,-Note a - If LAP of the propelling charge, M205, and the cartridge, M374A3, are performed at the same installation, this paragraph is not required.“ 4.2.2.4, Line 1: Delete in its entirety and add ?)4,2.2.4 Cartridge (see dwg. 9241291 or 9312648Irt Line 3: Delete Critical I. ignition cartridge
15、 head not fully seated . . . Visual“ and add Critical 1. Deptn of ignition cartridge from fin end below minimum . Gage CD“ PAGE 7 4.2.2.4, Line 1: from top of page: Delete line in its entirety and add “2. Visual-Manual “ Fuze safety wire missing or insecure (if applicable; see dwg. 9241291 ) Delete
16、critical 3 and add new critical 3 as follows: “3. shall escape (if applicable, see 4.3.4.1) . 100% . 3.2 . Visual (see 4.3,411 Line 5 from top of page; Cracks in fin housing . Visual (4 power mgnification)“ Following line 5 from top of page: missing or illegible - Visual (see 6.7)11 Propel1 ing char
17、ge missing or damaged to the extent that propellant * Delete line in its entirety and add tt6 . i Add: “Special a: Varning notice(s1 Line 10: Add new Major 105 as follows: Delete line 103. utside diameter, rnax . . . Gage CD“ * “105 Fin blade damaged or distorted . . . 100% inspection .3.2 .Gage (se
18、e drawing 9280418)rf Line Xi from top of page: Delete line in its entirety and add “108. Fuze fails to meet mimum assembly torque (if applicable; see dwg, 9241291 1. Test Line 24 from top of page; Delete line in its entirety and add “1 11 Fuze not fully seated (if applicable; see dwg. 9241291 . . .
19、Visual“ Add new 112 as follows: “112. Propelling charges damaged but not to the extent that propellant shall escape (if applicable, see 4.3.4.1) (100% inspection) 3.2 . Visual (see 4.3.4)“ Line 28 from top of page: Delete “Minor: 202. Pettman cement does not cover . Visual1 in its entirety and subst
20、itute “Minor: 202. Pettman cement (or alternate) improperly applied (applicable to the fze, fin and ignition cartridge) . . . Visual“ 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-48171 (AR) AFDENDtENT 7 Line 33 from top of page add “Minor
21、205 Closing plug not fully seated (if applicable; see dwg. 9312548) . Visualt1 4.2.3.5, Line 1: Delete “see dwg. 9230175“ and substitute “see dwg. 9287603“ Line 3: Delete “Critical: None defined“ and substitute Critical 1 and Special A. as follows: tl. Propelling charge damaged to the extent that pr
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC4817171990CARTRIDGE81MMHEM374A3LOADINGASSEMBLINGANDPACKINGM374A3 81 MM 炮弹 装卸 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-441590.html