ARMY MIL-C-48152-1974 CAP SPIKE FOR CARTRIDGE 105MM HEAT-T M456A1E1《M456A1E1型105MM传热炮弹的钉状雷管》.pdf
《ARMY MIL-C-48152-1974 CAP SPIKE FOR CARTRIDGE 105MM HEAT-T M456A1E1《M456A1E1型105MM传热炮弹的钉状雷管》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-48152-1974 CAP SPIKE FOR CARTRIDGE 105MM HEAT-T M456A1E1《M456A1E1型105MM传热炮弹的钉状雷管》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、_- . MIL-C-48252 23 m 0b 03Lb727 O m S-37-05 MIL-C-48152 (PA) 22 January 1974 MILITARY SPECIFICATION CAP , SPIRE , FOR CARTRIDGE, lO.SMM, HEAT-T, M456AlEl 1. SCOPE 1.1 This specification covers the spike cap for use with Cartridge, 105MM, HEAT-T, M456AlE1. 2. APPLICABLE DOCUEIENTS 2.1 The following
2、documents of the issue in effect on date of invitation for bids, or request for proposals, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-A-2550 STANDARDS MIL I TARY MIL-STD-105 MIL-STD-109 MIL-STD-1168 MIL-STD-1169 MIL-STD-12 35 DRAWINGS ARMY 9271036 -
3、 Ammunition and Special Weapons; General Specification for. - Sampling Procedures and Tables for Inspection by Attributes (ABC-STD-105). - Quality Assurance Terms and Definitions. - Lot Numberin? of Ammunition. - Packauinq, Packing and Markin? for Shipment of Inert Ammunition Components. - Single an
4、d Multilevel Con- tinuous Sampling Procedures and Tables for Samplinq by Attributes. - Cap, Spike. FSC: 1315 THIS W&gENB CONTAINS 4 PAGES. A Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-b L MIL-C-48152 13 9979706 0316728 i? m I MIL-(2-48152 (PA) (
5、Copies of specifications, standards, drawings and publications required by contractors in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer). 2.2 Other Publications.-The following document forms a part of this spec
6、ification to the extent specified herein. Unless otherwise indicated, the issue in effect on date of invitation for bids shall apply. AMERICAN SOCIETY FOR TESTING AND MATERIALS ACTM-E-18 - Rockwell Hardness and Rockwell Superficial Hardness of Metallic Materials. (Applicable for copies should be add
7、ressed to the American Society for Testing and Materials, 1916 Race Street, Phila- delphia, Pa. 19103.) 3. REQUIREMENTS 3.1 Material.-Materials shall be in accordance with applicable drawings and specifications. 3.2 Parts.-The parts shall comply with all requirements specified on Drawing (wg.) 92710
8、36, as applicable, and with all requirements specified in applicable specifications. 3.3 Workmanship.-Al1 parts shall be of the proper finish &nd free of cracks, burrs, chips, dirt, grease and other foreign material. The cleaning method used shall not be injurious to any of the parts, nor shall the
9、parts be contaminated by the cleaning agents. 3.4 First Article Inspection.-This specification provides for submission of First Article Sample inspection in paragraph 4.2. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for Inspection.-Unless otherwise speci- fied in the contract or purchase orde
10、r, the supplier is respons- ible for the performance of all inspection requirements as speci- fied herein. Except as otherwise specified in the contract or order, the supplier may use his own or any other facilities suit- able for the performance of the inspection requirements specified herein, unle
11、ss disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. Reference shall be made to Standard MIL-STD-109 in orde
12、r to define terms used herein. shall apply. 2 The provisions of Specification MIL-A-2550 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-_ NIL-C-4152 I3 7777906 0316727 4 MIL-(2-48152 (PA) 4.1.1 Submission of Product.-At the time the completed lot of
13、 items deliverable under the contract is submitted to the Government for acceptance, the contractor shall supply the following information accompanied by a certificate which attests that the information provided is correct and applicable to the product being submitted: quality assurance provisions s
14、pecified in this specification. gether with an identification and date of changes thereto. contractor meets requirements, when such material is controlled by Government or commercial specifications referenced in any of the contractual documents, and that certificates of conformance are on file and a
15、vailable for review. a. A statement that the lot complies with all of the b. Drawing and specification number and date, to- c. A statement that all material purchased by the . d. Number of items in the lot. e. Date submitted. The certificate shall be signed by a responsible agent of the certifying o
16、rganization. The initial certificate submitted shall be substantiated by evidence of the aqents authority to bind his principal. Substantiation of the agents authority will not be required with subsequent certificates unless, during the course of the contract, this authority is vested in another age
17、nt of the certifying organization. 4.2 First Article Inspection 4.2.1 Submission.-Prior to initiation of regular produc- tion, the contractor shall submit a first article sample to the Government facility designated by the contracting officer for evaluation in accordance with the provisions of parag
18、raph 4.2.2. The first article sample shall consist of 25 spike caps which have been produced by the contractor, or furnished by a supplier, and which have been manufactured usina the same production pro- cesses, procedures and equipment which will be used in fulfilling the contract. All parts and ma
19、terials, including packaging and packing, shall be obtained from the same source of supply as will be used in regular production. Prior to submission, the con- tractor shall inspect the sample to the degree necessary to assure that it conforms to the requirements of the contract, and submit a record
20、 of this inspection with the sample, in- cluding statements of findings for materials, processes and tests. A sample containing known defects will not be submitted 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-48152 (PA) unless specifically
21、 authorized by the contractin? officer. (A first article sample, or portion thereof, as directed by the contracting officer, shall also be submitted whenever there is a lapse in production for a period in excess of 90 days, or whenever a change occurs in manufacturin- process, material used, drawing
22、, specification or source of supply so as to significantly affect product unifornity as determined by the Government). 4.2.2 Inspection to be Performed.-Parts will be subjected by the Government to any or all of the examinations or tests specified in 4.3 and 4.4 of this specification, and any or all
23、 requirements of the applicable drawinqs. Rejection.-If any part fails to comply with any of the applicable requirements for the inspections to be performed in accordance with 4.3.2 and 4.3.3, the first article sai?.ple shall be rejected. The Government reserves the riqht to tern!- inate its inspect
24、ion upon any failure of assembly or component in the sample to comply with any of the stated requirements. 4.2.3 4.3 Inspection Provisions 4.3.1 Lot Formation.-The term “inspection lot“, as used in this specification, is defined as an essentially homogeneous collection of units of product from which
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC481521974CAPSPIKEFORCARTRIDGE105MMHEATTM456A1E1M456A1E1 105 MM 传热 炮弹 雷管 PDF

链接地址:http://www.mydoc123.com/p-441589.html