ARMY MIL-C-48136-1972 CHARGE PROPELLING ASSEMBLY (SINGLE BAG) 105MM HOWITZER M137 (MOD)《 M137型105MM榴弹炮的推进组件(单袋)装药》.pdf
《ARMY MIL-C-48136-1972 CHARGE PROPELLING ASSEMBLY (SINGLE BAG) 105MM HOWITZER M137 (MOD)《 M137型105MM榴弹炮的推进组件(单袋)装药》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-48136-1972 CHARGE PROPELLING ASSEMBLY (SINGLE BAG) 105MM HOWITZER M137 (MOD)《 M137型105MM榴弹炮的推进组件(单袋)装药》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-C-4L3b 13 777770b 0336548 O - 5-37-0.J+ MIL-C-48136 (MU) 21 November 1972 MILITARY SPECIFICATION CHARGE, PROPELLING ASSEMBLY (SINGLE BAG) lOSMM, HOWITZER Mi37 (MOD) 1. SCOPE 1.1 This specification covers the loading assembling and packing for one type of propellant charge for use in Cartridge 10
2、5MM, HE, M1 (MOD) or WP, 60 (MOD) for lO5MM Howitzer Mi37. 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids form a part of this specification to the extent specified herein: SPECIFICATIONS FEDERAL PPP-C-843 -Cushioning Material, Cellulosic MIL
3、ITARY MIL-A-2550 -Ammunition and Special Weapons, General Specification for MIL-C-45662 -Calibration System Requirements STANDARDS MILITARY MIL-STD-105 -Sampli_ng Procedures and Tables MIL-STD-109 -Quality Assurance Terms and Definitions MIL-STD-1168-Lot Numbering of Ammunition MIL-STD-1235-Single a
4、nd Multilevel Continuous Sampling Procedures and Tables for Inspection by Attributes. MS- 6 30 5 3 -Drum, Metal Shipping and Storage 15 and 19 Gallon for Inspection by Attributes (ABC-STD-105) DRAWINGS 9217087 -Marking Diagram and Sealing of Steel Drums 9276669 -Charge, Propelling Assembly for Shipm
5、ent of Propellants, Bagged Charges FSC: i315 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-48136 13 7777906 03165L17 i MIL-C-48136 (m) (Copies of specifications, standards, drawings and publications required by contractors in connection with
6、specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer). 3. REQUIREMENTS 3.1 Material.-Materials shall be in accordance with applicable drawings and specifications. 3.2 Propelling Charge Assembly.-The propelling charge assembly shall c
7、omply with all requirements specified on Drawing (dwg) 9276669 and with al1 requirements specified in applicable specifications. 3.3 Weight.-The net weight of the propellant shall not differ by more than 0.02 ounce from the amount specified in the loading authorization. 3.4 Workmanship.-All parts an
8、d assemblies shall be fabrica- ted and finished in a thorough, workmanlike manner. All parts shall be free of dirt, grease, and other foreign material. All required marking shall be neat and sharply defined. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection.-Unless otherwise specifie
9、d in the contract or purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract order, the supplier may use his own or any other facilities suitable for the performance of the inspection requiremen
10、ts specified herein, unless disapproved by the Government. The Government reserves the-right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. Reference shall be made to Sta
11、ndard MIL-STD-109 in order to define the terms used herein. The provisions of Specification MIL-A-2550 shall apply. 4.1.1 Submission of product.-At the time each completed lot of items deliverable under the contract is submitted to the Government for acceptance, the contractor shall supply the follo
12、wing information accompanied by a certificate which attests that the information provided is correct and applicable to the product being submitted: assurance provisions specified in this specification. with identification and date of changes thereto. meets requirements, when such material is control
13、led by Govern- ment or comercial specifications referenced in any of the contractual documents, and the certificates of conformance are on file and available for review. a. A statement that the lot complies with all of the quality d. Drawing and specification number and date, together c. A statement
14、 that all material purchased by the contractor 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-48136 (MU) d. Number of items in the lot. e. Date submitted. The certificate shall be signed by a responsible agent of the certifying organization.
15、 The initial certificate submitted shall be substantiated by evidence of the agents authority to bind his principal. Substantiation of the agents authority will not be required with subsequent certificates unless, during the course of the contract, this authority is vested in another agent of the ce
16、rtifying organization. 4.2 Inspection Provisions 4.2.1 Lot formation.-The term “inspection lot“ as used in this specification is defined as an essentially homogeneous col- lection of units of product from which a representative sample is drawn and inspected to determine conformance with applicable r
17、equirements. The sample selected shall represent only that quantity of units from which the sample was drawn and shall not be construed to represent any prior or subsequent quantities presented for inspection. Homogeneity shall be considered to exist provided the inspection lot has been produced by
18、one manufacturer, in one unchanged process, in accordance with the same drawing, same drawing revision, same specification and same specification revision and complies with the provisions for submission of product as specified in MIL-STD-105. Changes to the process, specification, or drawing not aff
19、ecting safety, performance, interchangeability, or storage, as determined by the Government, shall not be deemed to alter the homogeneity of an inspection lot. All materials submitted for inspection in accordance with this specification shall comply with the homogeneity criteria specified herein reg
20、ardless of the type of sampling procedure which is being applied to determine conformance with requirements. Lot numbering, as required, shall be in accordance with MIL-STD-1168. Each lot shall contain propellant from not more than one lot. 4.2.2 Examination.-The examinations listed in the following
21、 subparagraphs shall be performed on inspection lots (4.2.1) of the components or assemblies designated in the applicable paragraph headings. Inspection for critical defects (and major defects, when so specified) shall be 100 percent. Sampling plans for major nd minor defects shall be in accordance
22、with MIL-STD-IO5 except that continuous sampling plans in accordance with MIL-STD-1235 may be used if approved by the Government. Instead of applying the AQLs designated herein to the groups of major and minor defects listed, the contractor may elect to apply AQLs to individual defects using an AQL
23、of 0.40 percent for each major defect and an AQL of 0.65 percent for each minor defect. When this method is elected, it shall be applied to all of the major and minor defects listed in the applicable 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-
24、4.2.2.1 Bag, Propellant (see dwg. 9276668 covering a detail of dwg. 9276669). Categories Defects Method Of Inspection Critical: None defined Major: None defined Minor : AQL 1.5 percent 201. Any seam or opening incompletely 202. Marking missing misleading or 203. Foil missing or improperly assembled.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC481361972CHARGEPROPELLINGASSEMBLYSINGLEBAG105MMHOWITZERM137MODM137 105 MM 榴弹炮 推进 组件 袋装 PDF

链接地址:http://www.mydoc123.com/p-441584.html