ARMY MIL-C-45526 B-1972 CANNON 105MM HOWITZER M103《M103型105MM火炮 榴弹炮》.pdf
《ARMY MIL-C-45526 B-1972 CANNON 105MM HOWITZER M103《M103型105MM火炮 榴弹炮》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-45526 B-1972 CANNON 105MM HOWITZER M103《M103型105MM火炮 榴弹炮》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、m-c-45526B( WC ) supERSm1m 19 JULY 1972 MIL-C-45526A(WC) i5 October 1968 AMENDMEML 1 20 November i968 . MILITARY SPECIFICATION * CANNON, 105MM HWITZER: KLO3 1, SCOPE 1.1 This specification covers one type of howitzer cannon. 2, APPLICABLE D0CuME“S 2.1 The following documents, of the issue in effect
2、on date of invitation for bids or request for c pecified her ein. SFECEICATIONS I I Military MIL-C -13 931 NIL-1-45607 STANDARDS Military MIL-STD-109 proposal, form a part of this specification to the extent Cannons, General Specification for Inspection Equipent Acquisition, Maintenance, and Disposi
3、tion of . Quaiity Assurance Terms and Definitions MIL-STD-1235 - Single and Miltilevel Continuous Sampling Procedures and Tables for Inspection by Attributes PUBLIC ATIONS u. s, Arms Weapons Command EPL 8768965 - Engineering Parts List for Cannon, 105MM Howitzer: Master EQAP 8768965 - Master List of
4、 Supplementary Quality Assurance DL 8768963 - List of Inspection Equipment for Cannon, 105MM Howitzer: PDS P768965 - Packaging Data Sheet, Cannon, 105MM Howitzer: (Copies of specifications, Standards, drawings and publications required by suppliers in connection with specific procurement functions s
5、hould be obtained from the procuring activity or as directed-by the contracting officer.) NO3 Provisions for Cannon, 105MM Howitzer : KLO3 Klo3 Ml03 -ni. / FSC .O.5 n THIS DOCUMENT CONTAINS 7 PAGES. Y .r Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-
6、,- M.XL-C-4552bB LO 7777706 030782-4 a D 3.1 First article. When specified in the contract, the contractor shall submit a first article. be included in the pilot pack (see 5.1). Unless otherwise apeciiied (see 6.1*1), the first article shali 3.2 General requirements. Cannons and parts thereof shall
7、conform to the draw- ings listed in Engineering Parts List 8768965 and the requirements of this spec- ification and MIL-(2-13931. 3.3 Functioning. Ali parts shall function smoothly without interference or erratic movement . 3.3.1 Breech mechanism. Cainming of the operating-crank during counterrecoil
8、 or remar rotation of the opersting-handle shall rotate the breechblock crank rearward and downward kc, nears the opened position, V:.: lips of the extractors shall rotate sharply rear- ward to extract the cartrid- ;ase. The extractors shall then lock the breech- block in the opened positit -uitil t
9、ripped, normally by insertion of a cartridge, The breech mechanism, with the closing-spring-adjustor set for minimum preload, shall. then raise the brevzhblock to the closed position. Counterclockwise rotation of the adjustor shall increase the preload of the closing spring. 3.3.2 Firinn mechanisin
10、gr ou. cocking lever, forced by a cdng surface on the breech ring, shall engage the retractor. This engagement shall force the percussion mechanism rearward. The firing spring shai then compress and cause the sear to latch the percussion mechanism in the cocked position. pivots the trigger. The sear
11、 shall then rotate and release the percussion mechanism. This releases the compressed firing spring which shall drive the firing pin forward. The firing pin shall strike the cartridge primer and sim- ultaneously compress the firing pin retracting spring. spring shall then withdraw the firing pinbehi
12、nd the front face of the breech- block. swer the breechblock. When the breechblock During the dropping of the breechblock, the Rearward movement of the trigger plunger The expanding retracting 3.3.3 Firine pin protrusion. The firing pin protrusion, measured from the front face of the breechblock, sh
13、all be not less than 0.10 inch nor more than 0.16 inch when the breechblock is in the firing position. 3.3.4 Firinn mechanism overtravel. Overtravel of the firing mechanism in cocking shall be not less than 0.05 inch. 3.3.5 Headspace. and locked breechblock and the rear face of the tube, shall be no
14、t less than 0.188 inch nor more than 0.206 inch. Headspace, the distance between the front face of the closed 3.4 Performance. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1-45526B( WC ) 3.4.1 High pressure resistance. of withstanding U3 k 4 per
15、cent of the 39,000 pounds per square inch upper pressure limit at 70% when tested as specified in 4.5.4. 3.4.2 Material soundness. and fractures and shall comply with aay soundness requirements specified on the applicable drawings. 3.4.3 Rore enlargement. If proof firing is used to evaluate high pre
16、ssure resistance, bore diameters, measured across the lands after proof firing no more than 8 rounds, shall not exceed the basic (minimum) diameter specified on the applicable drawing by more than the amount specified in Table I. The cannons and repair tubes shall be capable After testing, all parts
17、 shaU be free fm cracks I Table I Bore enargement 2 cals. Distance forward of commencement of rifliq 0.1 inch 1 inch 1 cal. to muzzle Amount (inches) 0.008 0.008 0.006 0.003 - NOTE: Tnterpolate to determine the amount between given distances. 3.5 Worhanshig. Worbanship shall be as required in MIL-C-
18、13931. 4. QUALITY ACSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of all inspectinn requirements as specified herein. the contract or order, the supplier may use his own or any other
19、 facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such in- spections are deemed necessary to assme that supplies and
20、services conform to prescribed requirements. Except as otherwise specified in 4.2 Quality assurance terns and definitions. Quality assurance tems and definitions shaU. be as specified in MIL-STD-109. 4.3 Classification of inspection. The inspection requirements specified herein are classified as foL
21、ows: a. First article inspection (see 4.4) b, Quality confonnance inspection (see 4.5) 4.4 First article inspection. (in accordance with the contract requirements). representative of the production processes to be used during qumtty produc- tion. tion specified berein and such other inspection as is
22、 necessary to determine compliance with the requirements of the contract. A first article shall be submitted for inspection The first article sha3L be The first asticle 6haU be subjected to the quality conformance inspec- 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without
23、 license from IHS-,-,-t RIL-C-V552bB LO 799990b 0307826 IJ Mer testing and prior to preservation and packaging to determine compliance with this specification, MLL-C-13931, and as specified in the contract. Final examination of each cannon shall be ccsnpleted 4.5.1.2 inspection approval stq. The app
24、lication of the inspection approval stamp shall be as specified in MIL-C-13931. 4.5.2 Inspecton equipnent. tion of parts, sub-assemblies, and assemblies are listed in DL 8768965. Data lists containing equipnent used in the inspec- 4.5.2.1 Acquisition, maintenance, and disposition. Unless otherwise s
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC45526B1972CANNON105MMHOWITZERM103M103 105 MM 火炮 榴弹炮 PDF

链接地址:http://www.mydoc123.com/p-441461.html