ARMY MIL-C-45469 E-1986 CAP BLASTING NON-ELECTRIC M7 LOADING ASSEMBLING AND PACKING《M7型电气爆破雷管负荷的组装和包装》.pdf
《ARMY MIL-C-45469 E-1986 CAP BLASTING NON-ELECTRIC M7 LOADING ASSEMBLING AND PACKING《M7型电气爆破雷管负荷的组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-45469 E-1986 CAP BLASTING NON-ELECTRIC M7 LOADING ASSEMBLING AND PACKING《M7型电气爆破雷管负荷的组装和包装》.pdf(24页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-C-4 54 69E (AR) uhicti may be of use in improving this hument should be addressed to: Commander, US Army Armament Research and Development Center, Attn: AMSMC-QA, Dover, New Jersey 07801-5801 ty using the elf-addressed Standardization Document Improvement Proposal DD Form 1426) appearing at the
2、end of this document or by letter. 13 January 1986 SUPERSEDING * MIL-C-4 54 69D (AR) 22 December 1982 MILITARY SPECIFICATION CAP BLASTING I NON-ELECTRIC: M7 LOADING, ASSEMBLING AND PACKING This specification is approved for use within the U. S. Army Armament Munitions and Chemical Command, and is av
3、ailable for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers quality assurance provisions and preparation for delivery for one type of Blasting Cap designated as Blasting Cap, Non-Electric: M7. (See 6.1) 2. APPLICABLE DOCUMENTS 2.1 Gover
4、nment documents. 2.1.1 Specifications and standards. The following specifications and standards form a part of this specification to the extent specified herein. Unless otherwise specified, the issues of these documents shall be those listed in the issue of the Department of Defense Index of Specifi
5、cations and Standards (DoDISS) and supplement thereto, likted in the solicitation. I SPECIFICATIONS FEDERAL QQ-L-201 - Lead Sheet. UU-C- 2 8 2 - Chipboard PPP-B -56 6 - Boxes, Folding, Paper Board. PPP-B -6 2 1 - BOX, Wood, Naded and Lock-corner PPP-B - 6 3 6 - Boxes, Fiber. PPP-c-1120 - Cushion Mat
6、erial, Uncompressed Board Fiber for Packing. THIS DOCUMENT CONTAINS sq PAGES. Approved For public release*distributin is unlimited. AMSC N/A ESL 15 /5 DISTRIBUTION STATENT A. - ea Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-45467E 33 M 7777
7、70b 03071.153 b m PPP-C-1797- PPP-F-320 - MILITARY MIL-P-116 MIL -B - 11 7 MIL-C-43438 MIL-B-4 80 24 MIL-A-48078 STAN DARDS MILITARY MIL-STD-105 MIL-STD-129 MIL-STD-650 MIL-C- 4 54 693 (AR) Cushioning Material, Resilient, Low Density, Unicellular, Polypropolene, Foam. Fiberboard, Corrugated and Soli
8、d, Sheet Stock (Container grade) and cut - Preservation, Method of. - Bags, Interior Packaging. - Crimper, Blasting Cap, M2, Plier Type - Fuse, Blasting, Time, M700, Loading, w/fuse Cutter. Assembling and Packing. Box, Ammunition Packing, Wood, (W/plywood Top and Bottom) Nailed - Ammunition, Standar
9、d Quality Assurance Provisions, General Specification For. - Sampling Procedures and Tables for - Marking For Shipment and Storage - Explosives Sampling, Inspection and Inspection by Attributes. Testing. 2.1.2 , Other Government documents, drawinqs, and publications. The following other Government d
10、ocuments, drawings, and publications form a part of this specification to the extent specified herein. Unless otherwise specified, the issues shall be those in effect on the date of the solicitation. DRAWINGS US ARMY ARMAMENT RESEARCH AND DEVELOPMENT CENTER (ARDC) 2128217 2128219 3139687 8796522 883
11、0948 - Inner Package. - Package, Shipping and Storage (For 192 Cap, Blasting, Non-Electric, M7). - Pack, Shipping and Storage (For 768 Cap, Blasting, Non-Electric, M7). - Marking Diagram and Sealing Wood Packing Boxes. - Cap Blasting, Non-Electric, M7 Assembly. 2 Provided by IHSNot for ResaleNo repr
12、oduction or networking permitted without license from IHS-,-,-MIL-C-45469E (AR) (Copies of specifications, standards, drawings and publications required by the suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the Contracting
13、 Officer.) 2.2 Order of precedence. In the event of a conflict between the text of this specification and the references cited herein, the test of this specification shall take precedence. Nothing in this specification, however, shall supersede applicable laws and regulations unless a specific exemp
14、tion has been obtained. 3. REQUIREMENTS 3.1 Materials. Materials and parts shall be in accordance with the applicable drawings, specifications and standards. 3.2 Assembly. The assembly shall comply with all requirements specified on Drawing (Dwg.) 8830948, and with all requirements specified in appl
15、icable specifications and standards. 3.3 Moisture content of the lead azide. The moisture content of the lead azide at the loading station, at the time of loadina the blasting caps shall not exceed 0.50 percent whentested as specified in 4.5.1. 3.4 Impact resistance. The cap shall not detonate, the
16、cup shall not crack or break, or the charge loosen or drop out during impact testing when tested as specified in 4.5.2. 3.5 Output functioninq after impact test. The caps shall detonate completely as evidenced by the perforation of the lead discs when tested as specified in 4.5.3. 3.6 First article
17、inspection. This specification contains technical provisions for first article inspection. Requirements for the submission of first article samples by the contractor shall be as specified in the contract. 3.7 WorkmanshiE. All parts and assemblies shall be fabricated and loaded in a thorough, workman
18、like manner; and all manufacturing, processing, and assembling operations shall be correctly performed. They shall be clean and free of burrs, sharp edges, unblended radii, cracks, gouges, surface defects, chips, dirt, grease, and oil (except where specifically required), corrosion, and other foreig
19、n matter. The cleaning method shall not be injurious to any of the parts or assembly nor shall they be contaminated by the cleaning i 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-flIL-C-q59b7E 13 H 979970b 0307953 T-H- MIL-C-45469E (AR) agents.
20、Exterior surface coating shall be continuous except for a few light scratches not exposing base material. markings and stamping shall be neat and sharply defined. Required packing shall be dry. All required 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsiblity for inspection and standard quality assuran
21、ce provisions. Unless otherwise specified herein or in the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail specification. 4.2 Classification of inspections. The following types of inspections shall be conducted on this item: F a. First article inspection
22、. b. Quality conformance inspection. 4.3 First article inspection. 4.3.1 Submission. The contractor shall submit a first article sample as designated by the Contracting Officer for evaluation in accordance with provisions of 4.3.2. consist of twenty-five (25) cups and 125 loaded assemblies. The firs
23、t article sample shall 4.3.2 Inspections to be performed. See MIL-A-48078 and Table I specified herein. applicable requirements, the first article sample shall be rejected. 4.3.3 Rejection. See MIL-A-48078. If any items fail to comply with any of the applicable requirements, the first article sample
24、 shall be rejected. If any items fail to comply with any of the 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-nLL-C-45469E 13 m 777770b 0307454 Z - m e c O -4 U u a, II) c -4 a, d u .FI U Li m U II) Li 4 F4 . H w 4 a 2 F- 7 -* rl 8 rl E oi 5 Prov
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC45469E1986CAPBLASTINGNONELECTRICM7LOADINGASSEMBLINGANDPACKINGM7 电气 爆破 雷管 负荷 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-441456.html