ARMY MIL-C-3120 F-1978 CANISTER SMOKE HC 155MM PROJECTILE M1 AND M2《M1和M2型155MMHC发烟霰弹》.pdf
《ARMY MIL-C-3120 F-1978 CANISTER SMOKE HC 155MM PROJECTILE M1 AND M2《M1和M2型155MMHC发烟霰弹》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-3120 F-1978 CANISTER SMOKE HC 155MM PROJECTILE M1 AND M2《M1和M2型155MMHC发烟霰弹》.pdf(21页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-C-3320F 33 9999906 0293927 2 m MIL-C-3120F (EA) 14 February 1978 SUPERSEDING MIL-C-312QE( MU) 12 July i968 MILITARY SPECIFICATION CANISTERS, SMOKE, HC, 155MM PROJECTILE, M1 and M2 This specification is approved for use by US Army Armament Research and Development Command, Department of the Army
2、and is available for use by all Departments and Agencies of the Depart- ment of Defense. 1. SCOPE 1.1 This specification covers the filling and assembly of HC Smoke . Canisters for a base ejection shell. 1.2 Classification. The canister components shall be furnished in the following types as specifi
3、ed (see 6-2): Type M1 - Canister, Smoke, HC, 155MM Projectile (Dwg Di5-11-33). Type M2 - Canister, Smoke, HC, 155MM Projectile (Dwg Di5-11-41). 2. APPLICABLE DOCUMENTS . . 2.1 Government documents. The following documents of the issue in effect on date of invitation for bids or request for proposal,
4、 form a part of this specification to the extent specified herein: FSC 1320 : Beneficial comments (recommendations, additions, deletions) and any : : pertinent data which may be of use in improving this document should be: : addressed to: Commander, US Army Armament Research and Development : : Conu
5、nand, Attn: DRDAR-TSC-S, Aberdeen Proving Ground, MD 21010 by us= : : ing the self-addressed Standardization Document Improvement Proposal : : (DD Form 1426) appearing at the end of this document or by letter. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from
6、IHS-,-,-MIL-C-3LZOF 13 W 7777706 0273728 4 W SPEC I F.IC AT IONS FEDERAL QQ-S-781 - Strapping, Steel, Flat and Seals. PPP-B-621 - Boxes, Wood, Nailed and Lock-Corner. PPP-B-636 - Box, Fiberboard. PPP-F-320 - Fiberboard; Corrugated and Solid, Sheet Stock (Con- PPP-T-76 - Tape, Pressure-Sensitive Adhe
7、sive Paper, Water Re- tainer Grade) ,. and Cut Shapes. sistance (For Carton Sealing). MILITARY MIL-B-117 - Bags, Sleeves, and Tubing, Interior Packin,g. MIL-P-223 - Powder, Black. MIL-A-2550 - Amunition, General Specification For. STANDARDS MILITARY . MIL-STD-105 MIL-STD-129 MIL-STD-147 MIL-STD-650
8、MIL-STD-116 7 MIL-STD-1168 MIL-STD-12 34 MIL-STD-1235 - Sampling Procedures and Tables for Inspection by - Marking for Shipment and Storage. . - Palletized and Containerized Unit Loads. - Explosive; Sampling, Inspection and Testing. - Ammunition Data Card. - Lot Numbering of Ammunition. - Pyrotechni
9、c, Sampling, Inspection and Testing. - Attributes. Single and Multilevel Continuous Sampling Proce- dures and Tables for Inspection by Attributes. DRAWINGS US ARMY ARMAMENT RESMCH AND DEVELOPMENT COMMAND *CHEMICAL SYSTEMS LABORAWRY TDPL-15-11-33 - Canister, Smoke, HC, 155MM Projectile, M1. TDPL-15-1
10、1-41 - Canister, Smoke, HC, 155MM Projectile, Mi. (Copies of specifications, standards, drawings and publications required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer. ) “Formerly Edgewood Ars
11、enal. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3. REQUIREMENTS 3.1 Materials and components. 3.1.1 Materials. All materials cited on TDPL-15-11-33 and TDPL-15-11-41 shall conform to the specifications listed thereon, unless modified speci-*
12、fic characteristics are set forth on the drawings, in which case, detail drawings take precedent (see 6.4). 3.1.2 Components, All components of the Mi and M2 canisters shall con- form to the specifications and drawings listed on TDPL-15-11-33 and TDPL- 15-11-41. 3.2 Filling and assembly. The M1 and
13、M2 canisters shall be filled and assembled as specified on Drawings D15-11418, Di5-11-33 (Ml) and D15-11- 123, Di5-11-41 (M2) respectively (see 6.4 and 6.5). The white smoke mix- ture (HC), (Drawing B143-1-1) shall be consolidated into the body assembly, after the impregnated ignition sleeve, starte
14、r slugs/zinc sleeve assembly, and packing disk are in place, in two increments for the M1 canister and one increment for the M2 canister. Each increment shall be consolidated at 80 - 82 tons dead load for a period of not less than 3 seconds for the M1 canister. The M2 canister increment shall be con
15、solidated at 70 - 72 tons dead load for a period of not less than 3 seconsc dwell time. The. excess white smoke mixture shall be removed to a height as shown on Drawings D15-11-118 (Ml) and D15-11-123 (M2) respectively. Additional packing disks , as required, and the closing disk shall be installed
16、and the body assembly completed as indicated on the Drawings Dl5-11-118, Di5-11-33 (Ml) and DU- 11-123, Di5-11-41 (M2) respectively. 3.3 Starter slug. 3.3.1 Volatile content, The volatile content of the finished starter slug shall not exceed 0.50 percent when tested in accordance with 4.4.4.2(a), 3.
17、3.2 Crush strength. The crush strength of the starter slug shall be such that the starter slug shall not crush or break when a uniformly distributed load of 500 lbs is applied parallel to the longitudinal axis of the starter slug and when tested in accordance with 4.4.4.2(b). 3.3.3 Starter mixture.
18、The starter mixture shall conform to the chem- ical composition specified on Drawing C15-11-119 when tested in accordance with 4.4.4.2(c). 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-3320F 33 W 979770b 0293730 2 i MIL-C-3120F( EA) 3.4 Imp
19、remated sleeve. 3.4.1 Burn time. The impregnated sleeve shall conform to Drawings Bl5- 11-125 and B15-11-127. complete burning over its entire area within 7 seconds maximum when tested in accordance with 4.4.4.3(a). The dried impregnated sleeve shall demonstrate 3.4.2 Impregnating mixture. , The imp
20、regnating mixture shall conform to the chemical composition specified on Drawing Bi43-15-1 when tested in accordance with 4.4.4,3(b). 3.5 HC mixture. The HC mixture shall conform to the chemical compo- sition specified on Drawing B143-1-1 when tested in accordance with 4.4.4m4. 3.6 Functioning. The
21、M1 canister shall produce a continuous dense cloud of white smoke (opaque) for 60 to i50 seconds for the M1 and 30 to 120 seconds for the M2, when tested as specified in 4.4.4.1. Time from the first ignition of starter mix to first emission of smoke under pressure shall not exceed 10 seconds. Smoke
22、emission time shall be that period, when smoke is emitted under pressure until the cessation of smoke under pressure. Smoldering of the canister after the charge has burned Is not considered part of the smoke emission time, shall be no interruption of smoke by flame (burning of the starter mix- ture
23、, first 10 seconds maximum, shall not be construed as flaming). There 3.7 First article ballistic information. This specification makes provisions for a first article ballistic informational test prior to commencement of regular production. Table I. For test requirements see 4.3.4 and 3.8 Preproduct
24、ion. Prior to the start of regular production, a pre- production lot of canisters shall be produced in accordance with this specification, for examination an tests (see 4.3). 3.9 Workmanship. The canister shall be free from contamination (pyro- technic mixture, oil, or grease) -and damage, including
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC3120F1978CANISTERSMOKEHC155MMPROJECTILEM1ANDM2M1 M2 155 MMHC 发烟 霰弹 PDF

链接地址:http://www.mydoc123.com/p-441306.html