ARMY MIL-B-63454 (1)-1986 BAND ROTATING NYLON GLASS FILLED PROJECTILE 105MM M737 TPDS-T《M737 TPDS-T型105MM尼龙玻璃填补弹丸旋转箍带》.pdf
《ARMY MIL-B-63454 (1)-1986 BAND ROTATING NYLON GLASS FILLED PROJECTILE 105MM M737 TPDS-T《M737 TPDS-T型105MM尼龙玻璃填补弹丸旋转箍带》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-B-63454 (1)-1986 BAND ROTATING NYLON GLASS FILLED PROJECTILE 105MM M737 TPDS-T《M737 TPDS-T型105MM尼龙玻璃填补弹丸旋转箍带》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、 MIL-B-63454 (I) 13 W 7777906 0350823 I W -_ MIL-B-63454 (AR) AMENDMENT 1 1 Auqust 1986 MILITARY SPECIFICATION BAND, ROTATING, NYLON GLASS-FILLED FOR PROJECTILE, 105MM, M737, TPDS-T This Amendment forms a part of Military Specification MIL-B-63454 (AR) , dated 7 September 1982, and is approved for u
2、se within the US Army Armament, Munitions and Chemical Command and is available for use by all Departments and Agencies of the Department of Defense. PAGE 1 Preamble, delete: substitute “ . II .Research and Development. . . “ and lunitions and Chemical .I PAGE 2 2.1.2 Other government documents, dra
3、winqs, and publications. Under Drawings, delete: “. .Command (ARRADCOM) I and substitute: I .Development and Engineering Center (ARDEC)“ PAGE 9 4.5.2 Tensile strenqth and extension to failure test. First sentence, second line, delete: “. detail 3 .“ Para b, delete in its entirety and substitute: “b.
4、 The test fixture shall conform to Figure 3 or its approved equivalent. (Ref. MIL-A-48078) .I Para c, delete in its entirety and substitute: “c. Machine loading shall be 0.5 + 0.1 in./min.“ - Para d, add to beginning of first sentence: “For elongation, . Il Delete from end of first sentence: “.to th
5、e specimen.“ Last sentence, between “strength“ and “psi“ add: “ . at failure .I Page 1 of 7 FSC 1315 AMSC N/A DISTRIBUTION STATEMENT A, Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-B-6345
6、4 (AR) AMENDMENT 1 ;I PAGE 10 Figure 1, delete in its entirety and substitute Figure I, (included) . PAGE: 11 I Figure 3, delete in its entirety and substitute Figures 3, 3A and 3B (included). PAGE 12 4.5.3 Shear strenqth test. First sentence, second line, 4.5.4 Hardness test. Second line, delete: “
7、. . .detail 3 .I delete: I. . .of .“ and I. . .detail 2 .“ PAGE 14 4.5.8 Glass content test. Second line, delete: l. .detail 4 II PAGE 15 I 6.2 Orderinq data. Delete: “.Research and Development .“ and substitute: “.Munitions and Chemical.“ Delete: “DRDAR-QAT-A“ and substi tute: “AMSMC-QAT-A(D) 6.3 S
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILB6345411986BANDROTATINGNYLONGLASSFILLEDPROJECTILE105MMM737TPDSTM737TPDST 105 MM 尼龙 玻璃 填补 弹丸 旋转

链接地址:http://www.mydoc123.com/p-441034.html