ARMY MIL-B-60135 (8)-1971 BODY ASSEMBLY TANK PERISCOPE 10513599《10513599 坦克潜望镜主体组件》.pdf
《ARMY MIL-B-60135 (8)-1971 BODY ASSEMBLY TANK PERISCOPE 10513599《10513599 坦克潜望镜主体组件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-B-60135 (8)-1971 BODY ASSEMBLY TANK PERISCOPE 10513599《10513599 坦克潜望镜主体组件》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、.k MIL-B-60135 ( bb 79777Ob 0342577 1 I MIL-B-60135 (MU) AMENDMENT 8 28 December 1971 SUPERSEDING AMENDMENT 7 30 March 1970 MILITARY SPECIFICATION BODY ASSEMBLYy TANK PERISCOPE: 10513599 This amendment forms a part of Military Specification rnL-B-60135(MU), dated 22 January 1965. * * * Paragraph 2.1
2、, under STANDARDS add: “MIL-STD -810 Environmental Test Methods“ Paragraph 3.6.1.1: Delete paragraph and substitute: “3.6.1.1 Operating temperatures.- There shall be no visible flicker of the image tubes while thermally stabilized at temperatures of -40F and +125“F, when energized from an 18 to 30 v
3、dc power source. shall be given a minimum of 5 minutes warm-up time before checking for flicker . “ The assembly Paragraph 3.6.2: Delete-and substitute: “3.6.2 Rigidity.- The catches shall be capable of securing the body assembly rigidly against the locating surfaces of the head and mount which it i
4、s intended to be used. This requirement shall be met during and sub- sequent to a vibratory exposure along 3 mutually perpendicular axes. The vibration shall be a simple harmonic motion; the frequency varying either linearly or logarithmically from 5 to 55 to 5 cps in 5 - minute cycles for a total o
5、f 15 minutes along each of the axes. The amplitude of vibration shall be maintained constant at 1/64-inch (1/32-inch double amplitude) .I1 Paragraph 3.9: Delete paragraph and substitute: “3.9 Image steadiness.- There shall be no image movement or visible flicker subsequent to a minimum of 5 minutes
6、stabilization or tube warm-up time, when the assembly is energized from an 18 to 30 vdc power source or a 1.5 vdc dry battery.“ Paragraphs 3.10, 3.10.1 and 3.10.2: Delete and substitute: “3.10 Collimation.- The requirements of 3.10.1 and 3.10.2 shall be met under the following conditions: (a) The to
7、p surface of the body housing in a horizontal plane. (b) A target, 18 to 20 yards above the top surface of the body which lieS.on a vertical line perpendicular to a line joining the centers of the two objective apertures and at its midpoint. - FSC 6650 L- Provided by IHSNot for ResaleNo reproduction
8、 or networking permitted without license from IHS-,-,-MIL-B-60135 (MIT) AMENDMENT 8 3.10.1 Dipvergence.- The angle formed by the two emergent lines of sight shall not exceed 15 minutes of arc. 3.10.2 Divergence.- The two emerging lines of sight shall diverge within the limits of 5 and 30 minutes of
9、arc.“ Paragraph 3.11: Delete paragraph and substitute: “3.11 Image tilt.- The image of a target line originally perpendicular to a plane, defined by the 2 inch long shoulder (generated by the machining of the pads) adjacent to Valve Assembly 8201751, shall emerge perpendicular to the same plane with
10、in 45 minutes of arc.“ Paragraph 3.13: Delete “7.0 minutes“ and substitute “4.0 minutes“. Add the following new paragraph: “3.13.1 Obiective focus.- The objective assemblies shall be focused for the best image of a target at the center of the field, 18 to 20 yards above the top surface of the body.
11、body fulfils the resolution requirement,“ Best image is defined when the periscope Add the following new paragraphs: “4.1.2 First article (initial production) approval.- The requirement for first article approval and the responsibility (Government or contractor for first article testing shall be as
12、specified in the contract. The sample for first article approval tests shall consist of three (3) body assemblies plus 3 each of all items covered by SQAP. manufactured in the same manner, using the same materials, equipment, processes, and procedures as used in regular production. materials, includ
13、ing packaging and packing, shall be obtained from the same source of supply as used in regular production. The sample shall be All parts and 4.1.2.1 Government testing.- When the Government is responsible for conducting first article approval tests, the contractor, prior to submitting the sample to
14、the Government, shall inspect the sample to insure that it conforms to all the requirements of the contract and submit a record of this inspection with the sample, including certificates of conformance for materials. 4.1.2.2 Contractor testing.- When the contractor is responsible f0.r conducting fir
15、st article approval tests, the sample shall be inspected by the contractor for all the requirements of the contract. a record of this inspection, including certificates of conformance for materials, shall be submitted to the Government for approval. ment reserves the right to witness the contractors
16、 inspection.“ The sample and The Govern- * Paragraph 4.2.2, Table I: Characteristic 108, change “4.5.3.7“ to “4.5 . 3 . 7 . 1. I Page 2 of 7 Pages Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-* * MIL-B-60135 (MU) AMENDMENT 8 Paragraph 4.2.2, Table
17、 I: Add new characteristic, requirement and test: “109 . Objective focus 3.13.1 4 . 5 . 3 . 711. Paragraph 4.3.2: Delete “Three body assemblies“ and substitute “Ten body assemblies“. Paragraph 4.3.2: Following Characteristic 306, add new requirement and test: “307. Operating temperatures 3.6.1.1 4.5
18、 . 2 . 1 . 1 Paragraph 4.4.2.3.2: Delete paragraph and substitute: “4.4.2.3.2 Sealing.- Special testing equipment to test the sealing of the body assembly shall conform to the requirements of Drawing F8565556, Pre s sure Tes ter -Two Stat ion. Paragraph 4.4.2.4: Delete and substitute: “4.4.2.4 Devic
19、e to test optical performance requirements.- The body assembly shall be tested for the performance requirements when mounted and secured to a testing device or fixture the accuracies of which shall con- form to the pertinent features and accuracies depicted on Drawing F10527436 and drawings pertaini
20、ng thereto shall apply. a. Pretest information.- The test fixture shall be solidly supported on a leveled surface. This fixture shall also provide a power supply of 24 Vdc to illuminate the body assembly under test. b. Set-up.- Place a one minute or better level across datum 11 11 A shown on Fixture
21、 Drawing F10527436, Sheet 1, and by means provided adjust until test fixture is level. Then secure the fixture. C. Suspend plumb lines in front of the double telescopes de- picted on Drawing F10527436, Sheet l, until the vertical center lines of the reticles are parallel to the plumb lines. telescop
22、es shall contain an erecting system. The viewing unity power d. Target.- A fabricated target shall be a square approximately 12 inches by 12 inches with a central vertical and horizontal line that shall cover the full length and width of the target square. The target shall contain white dull lines a
23、gainst a black absorbing background. width of all target lines, excluding the resolution pattern lines shall be 2 minutes tr 30 seconds wide to permit good visibility. The e. Illumination.- The target shall be illuminated with two light sources containing 100 watt bulbs on Corning Glass #2563 filter
24、s or equivalent. The light sources shall be placed out of view of the line of sight but capable of providing sufficient illumination of the target. The resolution chart shall be centered about the geometric axis of the target. Page 3 of 7 Pages . Provided by IHSNot for ResaleNo reproduction or netwo
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILB6013581971BODYASSEMBLYTANKPERISCOPE1051359910513599 坦克 潜望镜 主体 组件 PDF

链接地址:http://www.mydoc123.com/p-440999.html