ARMY MIL-B-45390 A-1987 BULLDOZER KIT EARTH-MOVING TANK MOUNTING M9《M9型坦克安装推土机包》.pdf
《ARMY MIL-B-45390 A-1987 BULLDOZER KIT EARTH-MOVING TANK MOUNTING M9《M9型坦克安装推土机包》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-B-45390 A-1987 BULLDOZER KIT EARTH-MOVING TANK MOUNTING M9《M9型坦克安装推土机包》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、i MIL-B-45370A 25 W 7797706 0377303 5 E MIL-B-45390A(AT) 16 March 1987 SUPERSEDING MIL-B-45 390 ( Ord ) 29 November 1961 MILITARY SPECIFICATION BULLDOZER KIT, EARTH-MOVING : TANK MOUNTING, M9 This specification is approved for use within the US Army Tank-Automotive Command, Department of the Army, a
2、nd is available for use by all Departments and Agencies of the Department of Defense. ii 1. SCOPE 1.1 Scope. This specification covers hydraulically operated, double-acting, straight-blade M9 bulldozer kits, designed for mounting on the front of fulltracked, combat tanks in the 105 MM, M60 series. 2
3、. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards. The following specifications and standards form a part of this specification to the extent specified herein. Unless otherwise specified, the issues of these documents shall be those listed in the issue of the Depart
4、ment of Defense Index of Specifications and Standards (DODISS) and supplement thereto, cited in the solicitation. Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: US Army Tank-Automotive Command,
5、 ATTN: AMSTA-GDS, Warren, MI 48397-5000, by using the self-addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document, or by letter. AMSC NIA FSC 2590 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. THIS DOCUMENT CON
6、TAINS 12 PAGES. -% Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-B-45370A 25 W 777970b 0177302 7 D MIL-B-45 390A( AT) SPECIFICATIONS MILITARY MIL-L-2104 MIL-L-46167 - Lubricating Oil, Internal Combustion - Lubricating Oil, Internal Combustion E
7、ngine, Tactical Service. Engine, Arctic. STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for MIL-STD-130 MIL-STD-193 Inspection by Attributes. Property . Vehicles, Construction Equipment and Material Handling Equipment, MIL-STD-642 - Identification Marking of Combat and Tactical Tran
8、sport Vehicles. MIL-STD-4566 2 - Identification marking of US Military - Painting Procedures and Marking for - Calibration System Requirements. 2.1.2 Other Government drawing. The following other Government drawing forms a part of this specification to the extent specified herein. otherwise Specifie
9、d, the issues shall be those in effect on the date of the solicitation. Unless DRAWINGS ARMY 8750001 - Bulldozer, Earth-Moving, M9. (Copies of specifications, standards, handbooks, drawings, publications, and other Government documents required by the contractors in connection with specific acquisit
10、ion functions should be obtained from the contracting activity or as directed by the contracting activity,) 2.2 Order of precedence. In the event of a conflict between the text of this specification and the references cited herein (except for associated detail specifications, specification sheets or
11、 MS standards), the text of this specification shall take precedence. Nothing in this specification, however, shall supersede applicable laws and regulations unless a specific exemptionhas been obtained. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-
12、,-,-MIL-B-5370A 25 7977706 0177303 7 MIL-B-45 390A( AT) 3 REQUIREMENTS 3.1 First article. Unless otherwise specified (see 6.2), the contractor shall furnish a complete bulldozer kit, which shall be subjected to first article inspection (see 4.4). First article inspection samples, properly marked wit
13、h identifying information shall be representative of the unit to be furnished to the Government. All subsequent bulldozer kits delivered to the Government shall conform to these samples in ali of their pertinent physical and performance attributes. 3.2 Materials. Materials shall be as specified here
14、in and in referenced specifications, standards, and drawings. Materials shall be free from defects which adversely affect performance or serviceability of the finished product (see 4.6.1). 3.2.1 Qualified products. The contractor shall be responsible for using parts and assemblies that are listed as
15、 qualified products on the Qualified Products List (QPL) and those approved for inclusion on the QPL. contractors manufacturing inspection records shall specifically list all QPL items by part or drawing number(s), name of supplier(s), and number and date of the QPL. When assemblies and parts are ap
16、proved as qualified products, but not yet listed on the QPL, the contractor shall list the products by number and date of the approved document with the name of supplier(s) (see 4.6.1). The 3.3 Design and construction. The bulldozer kits shall be constructed and assembled into a complete assembly in
17、 accordance with drawings, specifications, and standards listed or referred to on Drawing 8750001. parts requiring identification shall be marked in accordance with standard MIL-STD-130 (see 4.6.1 and 4,6.2). Al1 3.3.1 Service products. Bulldozer performance shail be demonstrated using standard serv
18、ice products in the hydraulic system, of the following type and grade for the applicable ambient air temperature; at ambient air temperature from -10 degrees Fahrenheit (OF) to +125OF, oil shall conform to grade 10 of MIL-L-2104; at ambient air temperature from -10 to -40“F, oil shall conform to MIL
19、-L-46167 (see 4.6.1). 3.3.2 Hydraulic system. Provisions shall. be made prior to initial filling to assure that oil confining areas of the hydraulic system are free of rust, scale, welding slag and spatter, or other contamination that may cause equipment failure (see 4.6,l). 3.3.3 installation instr
20、uctions. One copy of an approved set of installation instructions shall be provided with each bulldozer kit (see 4.6.2). 3.3.4 Interchangeability. Al1 parts having the same manufacturers part number shall be directly and completely interchangeable with each other in terms of installation and perform
21、ance (see 4.6.1). 3.4 Performance. After the bulldozer kit is completely assembled and installed on the tank, the bulldozer, serviced as specified in 3.3.1, shall meet the performance requirements specified herein (see 4.6.3). 3 Provided by IHSNot for ResaleNo reproduction or networking permitted wi
22、thout license from IHS-,-,-MIL-B-45390A UP 999990b 0197304 O Down MIL-B-45390A( AT) 2.5 4 5 5.5 6 3.4.1 Hydraulic operating system. The hydraulic system shall be powered by a hydraulic pump driven through a right angle drive speed reducer attachable to the transmission power take-off shaft. A four-p
23、osition control valve shall direct: the oil flow to the double-acting hydraulic cylinders for control of the blade. The pump when operating at 2800 revolutions per minute (rpm) shall deliver a minimum flow of 60 gallons per minute at a pressure of 1000 pounds per square inch (psi) (see 4.6.3.1). 6.5
24、 6.5 6.5 6.5 6.5 3.4.2 Controls and linkage. Prior to initial bulldozing operation, all controls and linkage shall be operated through all ranges of operation (see 3,4,3 Safety relief valve, Hydraulic system shall be protected from high shock pressures by a relief valve set to operate at 5000 psi (s
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILB45390A1987BULLDOZERKITEARTHMOVINGTANKMOUNTINGM9M9 坦克 安装 推土机 PDF

链接地址:http://www.mydoc123.com/p-440887.html