ARMY DOD-W-70666-1986 WARHEAD GUIDED MISSILE HE M207E6 TRUMPET LINER FOR《M207E6型小号班轮导弹弹头》.pdf
《ARMY DOD-W-70666-1986 WARHEAD GUIDED MISSILE HE M207E6 TRUMPET LINER FOR《M207E6型小号班轮导弹弹头》.pdf》由会员分享,可在线阅读,更多相关《ARMY DOD-W-70666-1986 WARHEAD GUIDED MISSILE HE M207E6 TRUMPET LINER FOR《M207E6型小号班轮导弹弹头》.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、DOD-W-70666 33 7779706 0356633 7 DOD-W-70666 (AR) 15 December 1986 MILITARY SPECIFICATION WARHEAD, GUIDED MISSILE, HE, M207E6 TRUMPET LINER FOR This specification is approved for use within the U.S. Army Armament, Munitions and Chemical Command, and is available for use y .=. by all Departments and
2、Agencies of the Department of Defense. 9- * I 1. SCOPE 1.1 Scope. This specification covers the quality assurance provisions and special requirements not covered by the drawings for the fabrication and packaging of the liner or M207E6 Warhead. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1
3、Specifications and standards. The following specifications and standards form a part of this specification to the extent specified herein. Unless otherwise specified, the issues of these documents shall be those listed in the issue of the Department of Defense Index of Specifications and Standards (
4、DODISS) and supplement thereto, cited in the solicitation. SPECIFICATIONS MIL ITARY MIL-A-48078 - Ammunition Standard Quality Assurance Provisions, General Specification for Beneficial comments (recommendations, additions, deletions) and any pertinent data which may beof use in improv- ing this docu
5、ment should be addressed to: Commander, US. Army Armament, Munitions and Chemical Command, Attn: AMSMC-QA, Dover, New Jersey 07801-5001 by using the self-addressed Standardization Document Improve- ment Proposal (DD Form 1426) appearing at the end of this document or by letter. AMSC N/A FSC 1336 DIS
6、TRIBUTION STATEME“ A. Approved for public release; distribution is unlimited. THIS DOCUMENT CONTAINS /I, PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- DOD-W-70666 13 7797706 0356bLq O = STANDARDS MILITARY MIL-STD- 1 O 5 MIL-STD-116 DOD-W- 7
7、 O 6 6 6( all associated drawings and with the requirements of applicable standards and specifications. 3.3 Startinq stock. Raw material to be introduced into the cold forged process shall be analyzed for mechanical, electrical, physical, and chemical properties as shown below. 3.3.1 Physical proper
8、ties of startinq stock. The sample of startinq stock shall comply with the mechanical and electrical requirements of Copper nmber 101 (ClOlOO), Temper 060 as specified by Table 2 of ASTM-B-133 (ASTM-B-133M) or Table I of ASTM-B-187, with class 1 or 2 material acceptable. 3 Provided by IHSNot for Res
9、aleNo reproduction or networking permitted without license from IHS-,-,- DOD-W-70hhb 13 7777906 035661h 4 DOD-W-70666 (AR) 3.3.2 Chemical composition of startinq stock. The sample of starting stock shall comply with the chemical requirements of Copper number 101 (ClOlO) -Temper 060 as specified by A
10、STM-B-133 (ASTM-B-133M) or ASTM-B-187, supplemented by Table I of ASTM-F-68, with class 1 or 2 material acceptable. 3.4 Finished liner. The finished liner shall meet the grain size and hardness requirements as specified on the drawing. 3.5 Profile. The finished liner shall meet the profile requireme
11、nt as specified on the drawing. 3.6 Data requirements. The contractor shall generate data in accordance with the requirements of the data item description cited in 6.4. 3.7 First article inspection. This specification contains technical provisions for first article inspection. Requirements for the s
12、ubmission of first article samples by the contractor shall be as specified in the contract. 3.8 Process control 3.8.1 Process documentation. Concurrent with submission of the first article sample (see 4.3), the contractor shall submit a written description of the process used to produce the samples
13、together with the means by which the process can be verified in production. The method of verification shall be reviewed by and must be acceptable to the government. See Data Item Description DI-P-1604 (Tailored). Proposed changes to the process which. produced the accepted first article sample shal
14、l be submitted to the government prior to actual implementation of the change. A new first article sample will be required for each process change if determined necessary by the technical agency (see 6.5, if non U.S. manufacturer). 3.8.2 Liner traceability. The Contractor shall also submit a method
15、to establish liner traceability with specified lots. This information shall be furnished as a part of D-P-1.604 (Tailored) above and shall be reviewed by and must be acceptable to the go ve r nmen t. 3.9 Workmanship. All liners shall be fabricated in a thorough, workmanlike manner. The parts shall b
16、e free of burrs, chips, sharp edges, cracks, unblended radii, dents, tool marks, chipped edges, warpage, gouges, surface defects, dirt, grease, corrosion products, burn marks, and other foreign matter. The cleaning method used shall not be injurious to any of the parts, nor shall the parts be contam
17、inated by the cleaning agents. 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-DOD-W-70666 13 7977906 O356617 b 4. 4 DOD-W-70666 (u) QUALITY ASSURANCE PROVISIONS Responsibility for inspections. Unless ot,.erwise specified in the contract or purchas
18、e order, the contractor is responsible for the performance of.al1 inspection requirements as specified herein. Except as otherwise specified in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified
19、 herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescr.ibed requirements. Unless otherwise specified herein or in t
20、he contract, the provisions of MIL-A-48078 shall apply and are hereby made part of this specification. 4.1.1 Responsibility for compliance. All items must meet all the requirements of sections 3 and 5. The inspection set forth in this specifi.cation shall become a part of the contractors overall ins
21、pection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract. Sampling in qua
22、lity conformance does not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to acceptance of defective material. 4.1.2 Certification provisions. Certification shall include test data and results for each characteristic specified below. Ce
23、rtification shall be required for all material used in manufacturing the liners and prior to performing final acceptance inspection. Certification of Conformance shall include name of raw material producer, date of purchase, purchase order number, quantity, and all chemical, mechanical, -and physica
24、l analyses performed on the material. The following statement shall be included: “The undersigned, individually, and as the authorized representative of the contractor, warrants and represents that: All the information supplied above is true and accurate; the material covered by this certificate con
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYDODW706661986WARHEADGUIDEDMISSILEHEM207E6TRUMPETLINERFORM207E6 小号 班轮 导弹 弹头 PDF

链接地址:http://www.mydoc123.com/p-440493.html