ARMY A-A-52213-1997 BATH UNIT PORTABLE FOUR SHOWERHEADS《四喷头可携带浴器》.pdf
《ARMY A-A-52213-1997 BATH UNIT PORTABLE FOUR SHOWERHEADS《四喷头可携带浴器》.pdf》由会员分享,可在线阅读,更多相关《ARMY A-A-52213-1997 BATH UNIT PORTABLE FOUR SHOWERHEADS《四喷头可携带浴器》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、 A-A-52213 m 9999974 OL73LBO 19T W A-A-522 1 3 January 10,1997 COMMERCIAL ITEM DESCRIPTION BATH UNIT, PORTABLE, FOUR SHOWERHEADS The General Services Administration has authorized the use of this commercial item description (CID), for all federal agencies. 1. SCOPE 1.1 Scope. This commercial item de
2、scription (CID) covers portable, fuel-fired showers (4) contained in a shelter intended to provide hot showers to soldiers in the field for hygienic purposes. 2. SALIEJT CHARACTERISTICS 2.1 Design. The Portable Bath Unit (PBU) shall consist of a shelter which contains four shower stalls and a separa
3、te water heating unit. The PBU, when configured for transportation, shall consist of no more than three separate modules, each weighing 75 pounds or less. Handles or other suitable means for lifting and canying shall be provided on each module. Overall dimensions shail be such that each module is ab
4、le to be carried by two people. The PBU shall be transportable by High Mobility Multipurpose Wheeled Vehicle (HMMWV), Commercial Utility Cargo Vehicle (CUCV) and larger military vehicles. The PBU shall be capable of being Set-up and made ready for operation by two experienced people in a maximum tim
5、e of 15 minutes (see 4.3.2). The PBU shall also be capable of being dismantled by two experienced people in a maximum time of 15 minutes (see 4.3.2). The PBU shail be capable of starting and operating in ambient temperatures of 32F to 120F. No special tools shall be required for Set-up or operation.
6、 Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: U.S. Army Natick Research, Development and Engineering Center, ATTN: SSCNC-WEF, Natick, MA O1 760- 50 18 by using the Standardization Document Im
7、provement Proposal (DD Form 1426) appearing at the end of this document or by letter. AMSC NA FSC 4510 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- A-A-52213 m 9999974 DL73LBL 026 m A-A-522 13 All component parts shall be interchangeable with the
8、 same parts of others units furnished on the same contract. The PBU shall incorporate safety features which are adequate to avoid hazardous operation. 2.2 Heater. The heater shall draw, heat, and dispense water to the shower in accordance with 2.2.1 and 2.3, and shall be capable of pumping water wit
9、hout the heater in operation. It shall burn diesel and JP-8 fuels for water heating. Electrical components shall operate on nominal 24/28V DC with a maximum draw of 15 amps power. Burner exhaust shall be vented away fiom the heater module controls, and away from the shower area, such that exhaust ga
10、ses do not create a health hazard during operation. Fuel and water connections shall be a self-sealing, quick- disconnect type in accordance with the manufacturers standard practice. Means for water temperature adjustment and control, and an outlet water temperature gauge shall be provided. Means sh
11、all be provided to prevent excessive pressure build up inside the heater module. The heater module shall be a single self-contained unit with maximum dimensions 36 inches long, 18 inches wide, and 22 inches high. Sound level shall be measured one foot fi-om the center of the top surface of the heate
12、r and shall not exceed 85 and the 160 gallon collapsible pillow tank equipped with a 2 inch nominal cam-locking quick disconnect male coupling. An inlet water strainer to remove solid particles, which is removable for cleaning, shall also be provided. 2330-01-108-7367) equipped with a standard 1 inc
13、h nominal male garden hose connector, with I 2.2.2 Fuel system. The PBU shall operate on both diesel and JP-8 fuels. Fuel consumption rate shall not exceed /z gallon per hour. The heater shall be capable of drawing he1 fiom the standard military 5-gallon plastic fuel can (NSN 7240-01-337-5269, 7240-
14、01-337-5268). An adapter cap which interfaces with the can, and provides means for drawing fuel fiom the can when in an upright position shall be provided (see 6.4). Hoses with metal quick-disconnect fittings shall be provided to connect the heater module with the adapter. All components shall be re
15、sistant to deformation or deterioration fiom exposure to fuels. A replaceable fuel filter shall be provided. 2.2.3 Over temperature protection. Water temperature in any part of the system shall not exceed 200F. 2.2.4 Electrical supply (Government unique” requirement. see 6.3). The heater module shal
16、l be capable of drawing electrical power from military vehicles via connection to the NATO standard slave receptacle (see 6.4). A detachable, insulated, waterproof, power cable, minimum length of 10 feet, with a connector for mating with the vehicle receptacle shall be provided. 2 Provided by IHSNot
17、 for ResaleNo reproduction or networking permitted without license from IHS-,-,-. A-A-52213 9999974 0173182 Tb2 A-A-522 13 2.2.5 Internal wiring. Wiring practices shall be in accordance with NFPA Standard No. 70. 2.2.6 Power switch. A main power switch which interrupts power to all internal componen
18、ts when switched off shall be provided. A green indicator light shall be provided for this switch indicating that the system is energized. 2.2.7 Circuit urotection. The electrical system shall include replaceable fiises or circuit breakers which prevent damage to all electrical components and injury
19、 to personnel in the event of current surges. 2.2.8 Self-diagnostics. Self-diagnostics indicating, differentiating, and identifiing system and component faults shall be incorporated in the electrical system. At a minimum, the following faults shall be identified: failure to start, loss of burner fla
20、me, water over temperature, and low voltage. 2.3 Operation of shower. The heater shall provide water to the shower heads at a temperature of between 95F and 105F within 15 minutes. The heater shall continuously maintain this temperature range over the full range .of flow conditions and inlet water t
21、emperatures from 32F to 95F (see 4.3.1). The outlet water temperature shall be adjustable at the heater module. 2.4 Accessory storage. A bag or a transit case for storage of all associated hoses, cables, and accessories during transport shall be provided. The weight of the accessories and container
22、shall be included with the weight of the heater. 2.5 Shelter. The shelter module shall consist of a lightweight, tent-type structure with a floor. Maximum external dimensions when erected shall be 12 feet by 12 feet. Staking and tie down provisions shall be provided with each shelter. The entrance o
23、f the shelter, when erected, shall be a minimum of 75 inches high. There shall be a minimum of 75 inches in height from the floor to the roof over the shower stalls. Means for temporq dry storage of clothing (excluding helmet) during showering shall be provided. The exterior color of the shelter sha
24、ll be as specified in the contract or purchase order (see 6.1). The shelter, when configured for transport, shall form a single package with maximum dimensions of 48 inches long by 44 inches wide by 24 inches high. A bag or a transit case shall be provided for transport. The shelter and shower may b
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYAA522131997BATHUNITPORTABLEFOURSHOWERHEADS 喷头 携带 PDF

链接地址:http://www.mydoc123.com/p-439912.html