API SPEC 16C-2015 Choke and Kill Equipment (SECOND EDITION ERTA 1 JULY 2015 ERTA 2 NOVEMBER 2015 ERTA 3 February 2016 ERRATA 4 July 2016 ADDENDUM 1 July 2016).pdf
《API SPEC 16C-2015 Choke and Kill Equipment (SECOND EDITION ERTA 1 JULY 2015 ERTA 2 NOVEMBER 2015 ERTA 3 February 2016 ERRATA 4 July 2016 ADDENDUM 1 July 2016).pdf》由会员分享,可在线阅读,更多相关《API SPEC 16C-2015 Choke and Kill Equipment (SECOND EDITION ERTA 1 JULY 2015 ERTA 2 NOVEMBER 2015 ERTA 3 February 2016 ERRATA 4 July 2016 ADDENDUM 1 July 2016).pdf(134页珍藏版)》请在麦多课文档分享上搜索。
1、Date of Issue: July 2016 Affected Publication: API Specification 16C, Choke and Kill Equipment, Second Edition, March 2015 ERRATA 4 (including changes from Errata 1, July 2015; Errata 2, November 2015; and Errata 3, February 2016) Page vi, Contents, replace: 10.9 Hydraulic Control SystemDrilling Cho
2、kes 10.11Buffer Chamber with 10.9 Hydraulic Control SystemDrilling Chokes 10.10 Articulated Choke and Kill Lines 10.11 Buffer Chamber Page vii, Contents, Tables, entry for Table 3, replace: Swivel Joint with Swivel Union Page 2, 2 Normative References, add: ASME Boiler and Pressure Vessel Code (BPVC
3、) 2004, Section VIII, Division 2, Appendix 6 and ASQ Z1.4, Sampling Procedures and Tables for Inspection by Attributes (removed from Bibliography) Page 4, Definition 3.1.4, replace: swivel joint with swivel union Page 6, Definition 3.1.30, insert the NOTE: NOTE This would include the tolerance crite
4、ria used during the design of a part and its mating parts. Page 7, insert definition (moved from B.12.1): 3.1.43 leak Loss of pressure integrity in the flexible pipe assembly, but which allows a significant quantity of flow between the opposing end connectors enough to allow a continued temporary li
5、mited use in its intended service. Pages 7 through 9, subsequent definition numbers are revised due to above change. Page 10, 3.2 Abbreviations, revise the following abbreviations: ASME American Society of Mechanical Engineers (currently identified as ASME International) ASTM American Society for Te
6、sting and Materials (currently identified as ASTM International) NACE National Association of Corrosion Engineers (currently identified as NACE International) Page 11, 4.2, replace opening paragraph with: The following products shall meet the requirements of API 6A, PSL 3 (or higher), and shall have
7、 a material Class DD, EE, FF, or HH, with an H2S partial pressure rating of 1.5 psia (10.34 KPa) or higher, and a temperature rating from Table 1 as appropriate for choke and kill system applications: Page 13, Table 3, in the title, replace: Swivel Joint with Swivel Union Page 27, 6.3.5.4.2, second
8、paragraph, replace: For all thicknesses, HAZ hardness tests shall be performed in the base material with 1/16 in. (1.6 mm) with For all thicknesses, HAZ hardness tests shall be performed in the base material within 1/16 in. (1.6 mm) Page 27, Figure 4, replace the figure: Page 28, Figure 5, replace t
9、he figure: Page 37, 7.4.6.5.1, replace: 7.4.6.4.2 through 7.4.6.4.5 with 7.4.6.5.2 through 7.4.6.5.5 Page 39, 7.4.6.9.3, replace: 7.4.6.2.2, 7.4.6.2.3, and 7.4.6.2.4 with 7.4.6.9.2.2, 7.4.6.9.2.3, and 7.4.6.9.2.4 Page 41, 7.4.6.11.3.3, replace: 7.4.6.8 with 7.4.6.9.3 Page 42, 7.4.6.11.4.2, replace:
10、7.4.6.9.3 with 7.4.6.10.3 Page 44, 7.4.7.2.2, replace: 7.4.6.9 with 7.4.6.10.2 Page 44, 7.4.7.2.4, replace: 7.4.6.9 with 7.4.6.10.2.4 Page 46, Table 19, replace with: Table 19Quality Control Requirements for Non-metallic Sealing Material Quality Requirement Section Dimensional verification 7.4.11.2
11、Visual examination 7.4.11.3 Hardness testing 7.4.11.4 Documentation Batch traceability Cure date certification Shelf life expiration date certification 7.4.11.5 Page 48, 7.4.13.3.1, replace: 7.4.13.4, and 7.4.13.5 with 7.4.13.3.4, and 7.4.13.3.5 Page 50, 7.4.15.5.1, replace entire clause with the fo
12、llowing: 7.4.15.5.1 General Surface NDE shall be performed on the outside diameter of the rigid pipe after heat treatment in accordance with any of the methods described in 7.4.15.5.2 through 7.4.15.5.5. Page 52, 7.4.15.6.1.3, replace: 7.4.15.6 a) with 7.4.15.6.1.4 a) Page 54, Table 23, on Surface N
13、DE row, replace: 7.4.6.8 with 7.4.6.9 (Overwritten by changes in Addendum 1) Page 54, Table 24, Actuator column and Hydrostatic test row, replace: 7.5.6 with 7.5.6.1 (Overwritten by changes in Addendum 1) Page 54, Table 24, Drilling Choke column and Function Test row, replace: 7.5.5.3 with N/A (Over
14、written by changes in Addendum 1) Page 55, 7.5.3, section title, replace: 7.5.3 Records with 7.5.3 Traceability and Records (Overwritten by changes in Addendum 1) Page 56, Table 25, under the Hydrostatic Test Pressure column, top two entries, replace: 3000 (27.60) 4500 (41.40) with 3000 (20.70) 4500
15、 (31.03) (Overwritten by changes in Addendum 1) Page 63, Table 26, header row, replace: Articulated Lines Swivel Joints Unions with Articulated Lines Swivel Unions Page 64, 10.2.1 f), replace reference to: API 17F with API 17D Page 64, 10.2.2, replace: API 16C connectors shall be used with pressure
16、ratings as shown in Table 1, Table 2, and Table 3. with API 16C connectors shall be used with pressure ratings as shown in Table 2, Table 3, and Table 4. Page 65, 10.2.4, replace reference to: API 17F with API 17D Page 65, 10.2.5, section title, replace: 10.2.5 Unions and Swivel Joints with 10.2.5 U
17、nions and Swivel Unions Page 65, 10.2.5.3, 10.2.5.4, 10.2.5.6, replace: swivel joints with swivel unions Page 65, 10.2.5.6, replace: Unions and swivel unions shall be supplied in rated working pressures and sizes in accordance with Table 2. with Unions and swivel unions shall be supplied in rated wo
18、rking pressures and sizes in accordance with Table 3. Page 67, 10.6.1, third sentence, replace: valve or choke with choke Page 68, 10.6.3.2, first sentence, replace: 10.11.12 with API 6A Page 69, 10.6.7 b), replace: (51.67 C) with (52 C) Page 69, 10.7.4, first sentence, replace: 10.2 or 10.3 with 10
19、.2 Page 69, 10.7.5, section title, replace: 10.7.5 Rigid Choke and Kill Lines with 10.7.5 Marking Page 71, 10.8.4, second sentence, replace: 10.2 or 10.3. with 10.2. Page 74, 10.9.5.2, replace: Accumulators shall meet the requirements of ASME BPVC, Section XIII, Division 1. with Accumulators shall m
20、eet the requirements of ASME BPVC, Section VIII, Division 1. Page 74, 10.9.8, replace: 10.9 with 10.7 Page 75, 10.10.1.2, replace: swivel joints with swivel unions Page 77, 10.12.3.3, replace: 10.13 with 10.11 Page 77, 10.12.3.4, replace: 10.9 with 10.7 Page 78, 10.13.1, delete redundant clause numb
21、er 10.13.1. Page 85, B.7.4.2.1, replace: If gas is substituted for liquid, the criteria in B.7.4.2.2 and B.7.4.2.3 shall be followed. with If gas is substituted for liquid, the applicable requirements in B.7.4.2.3 shall be satisfied. Page 85, B.7.4.2.1, delete clause number B.7.4.2.2 and title, revi
22、se to a NOTE. New clause reads: B.7.4.2.1 GeneralThe manufacturer may, at his option, substitute gas for liquid where hydrostatic testing is specified, provided the testing method and acceptance criteria for gas testing are used. If gas is substituted for liquid, the criteria in B.7.4.2.3 shall be f
23、ollowed. NOTE Air, nitrogen, methane, or other gases or mixture of gases may be used. Pages 85 and 86, B.7.4.2.3 and B.7.4.2.4, revise clause numbers to B.7.4.2.2 and B.7.4.2.3 (per the change above). Page 86, B.8, replace with: Pressure/temperature cycles shall conform to the equipment-specific per
24、formance requirements specified in Section 10. The maximum test pressure shall be rated working pressure as specified in 4.6. The minimum and maximum test temperatures shall be as specified in conformance with 4.1. Page 89, B.9.4.4.3, first sentence, replace with: A seal that passes the cycle test d
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- APISPEC16C2015CHOKEANDKILLEQUIPMENTSECONDEDITIONERTA1JULY2015ERTA2NOVEMBER2015ERTA3FEBRUARY2016ERRATA4JULY2016ADDENDUM1JULY2016PDF

链接地址:http://www.mydoc123.com/p-429855.html