AIR FORCE MIL-V-8057F-1973 VALVE OXYGEN PRESSURE BUILDUP AND VENT《氧气压力积聚和排泄阀》.pdf
《AIR FORCE MIL-V-8057F-1973 VALVE OXYGEN PRESSURE BUILDUP AND VENT《氧气压力积聚和排泄阀》.pdf》由会员分享,可在线阅读,更多相关《AIR FORCE MIL-V-8057F-1973 VALVE OXYGEN PRESSURE BUILDUP AND VENT《氧气压力积聚和排泄阀》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-V-8057F MIL-V-6057F 25 air conforming to BB-A-1034 Grade A or C; or nitrogen conforming to BB-N-411, Class 1, Grade A. h.6.3. position. Only the internal force shall be used to position the valve at either 4.7. Test methods. 4.7.1. Examination of product. Unless otherwise specified by the procur
2、ing activity. each valve shall be inspected to determine conformance to this speci- ficatiohwith respect to material, workmanship, and markings. “4.7.2. Vent-port leakage. The gas port of the valve shall be suitably plugged and the valve set in the buildup position. and 300 psig and 10 inches of wat
3、er shall be applied to the buildup port. Under these conditions, the combined leakage around the valve stem and through the vent port shall not exceed 0.05 liter per minute. Gaseous pressures of 70 4.7.3. The vent port of the valve shall be suitably plugged and the valve set in the vent position. A
4、gaseous pressure of approximately 30 psig shall be applied to the buildup port. Under these conditions, combined leakage through the gas port and around the valve stem shall not exceed 0.25 liter per minute. liter per minute when 10 inches of water pressure is applied to the buildup port. Gas-port l
5、eakage. Under similar conditions, leakage shall not exceed 0.05 4.7.4. High-temperature operation. temperature of at least 260F for not less than 1 hour. While maintained at The sample valves shall be heated to a this temperature, they shall be subjected to the Vent-port leakage and Gas- port leakag
6、e tests as specified in 4.7.2 and 4.7.3 respectively. er or other suitable means. The flow rate shall be at least 4.3 ambient cfm. The valves shall then be set in the buildup position and a pressure of 21 inches of water applied to the buildup port. bient cfm. the valves to the given amount. ured in
7、 inches of water shall be less than the amounts specified. Gas flow The flow rate through the valve shall be at least 1.4 am- The tests may also be checked by adjusting the flow rates through In this case, the differential pressure meas- 4.7.9. plished on the valve while it is in each of three mutua
8、lly perpendicular posi- tions. Orientation. The flow rates shall be within the limits spcifi.ed, in each of the The flow rates test as specified in 4.7.8 shall be accom- . positions. 94.7.10. Extreme low temperature operation. The valve shall be connected to a 300 psi working pressure IL)X converter
9、 in an assimulated aircraft manner. With, the valve in the vent position the converter shall be filled with liquid oxygen at 20 to 40 psi and allowed to run over for one minute. There shall be no evi- dence of leakage around the valve stem during this test. The source will be , disconnected from the
10、 converter and the valve immediately placed in,the build- up position. This operation shall completely cut off the flow of liquid oxygen and there shall be no evidence of leakage of liquid. Leakage through the valve shall be measured at the vent port as the converter pressure builds up through- out
11、the entire range from O to 300 psi. After one minute gaseous leakage shall not exceed 0.05 liters per minute. subjected to the vent-port and gas-port leakage tests as specified in 4.7.2 and h.7.3 respectively. Following this test, each valve shall be +& .8. Reliability qualification demonstration. F
12、our samples shall be tested for reliability. The reliability of the equipment shall be expressed in terms of 90 percent confidence that the MCBF shall be equal to or greater than 1000 cycles. The equipnent shall be operated under cryogenic conditions simulating actual usage. while in the vent positi
13、on at 20 to LO psi, placing the valve in buildup and applying 300 psi to the gas and buildup ports, then releasing the pressure by returning the valve to the vent position. shall be subjected to the extreme low temperature operation test per paragraph &.7.lO above including the vent-port and gas-por
14、t leakage tests. A cycle shall consist of flowing liquid oggen through the valve After each 250 cycles each valve Each of the 11 i ., -. . -. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-V-805 7F four samples will be cycled until failure. cien
15、cy or condition such that the valve cannot meet all of the performance requirements contained herein. meeting the accept/reject criteria of 4.8.1. A failure consists of any defi- Reliability qualification will consist of +&.8.1. Reliability accept reject criteria. The following accept/reject criteri
16、a will be used to determine reliability qualification. data (time to failure of each of the four samples) the sample MCBF (x will be determined by : From the test i=l where 3 = cycles to failure of the ith valve The sample standard deviation (S) is determined using: n = sample size (b) I if 1000 + 0
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AIRFORCEMILV8057F1973VALVEOXYGENPRESSUREBUILDUPANDVENT 氧气 压力 积聚 排泄 PDF

链接地址:http://www.mydoc123.com/p-428718.html