AIR FORCE MIL-I-87923 (3)-1983 INDICATOR TORQUEMETER AEU-13 A《AEU-13 A型扭矩计指示器》.pdf
《AIR FORCE MIL-I-87923 (3)-1983 INDICATOR TORQUEMETER AEU-13 A《AEU-13 A型扭矩计指示器》.pdf》由会员分享,可在线阅读,更多相关《AIR FORCE MIL-I-87923 (3)-1983 INDICATOR TORQUEMETER AEU-13 A《AEU-13 A型扭矩计指示器》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、k. 7 NIL-1-87923 (3) 66 m 7777706 OL45bbb 5 m MIL-1-87 92 3 AMENDMENT 3 18 MARCH 1983 Suuersedina AMNDMENT -2 15 September 1981 MIL I TARY SPEC IF ICATION INDICATOR, TORQUEMETER, AEU-13 /A This amendment forms a part of Military Specification MIL-1-87923, dated 1 June 1979, and is approved for use b
2、y all Departments and Agencies of the Department of Defense. PAGE 2 2 1: Under “STANDARDS, Military“, delete “MIL-STD-785“. *Boxed paragraph: 49016“ and substitute “Oklahoma City Air Logistics Center/MMEDO, Tinker AFB OK 73145“. Delete “Hq AFLC CASO/LODS, Federal Center, Battle Creek MI PAGE 3 *3.1:
3、 Delete entirely and substitute the following: “3.1 First article. When specified (see 6.6), the contractor shall furnish sample unit(s) for first article inspection and approval (see 4.4).“ PAGE 8 3.4.9, line 7: Delete “36500“ and substitute “3650“. PAGE 15 3.5.1: Delete paragraph in its entirety.
4、3.8, line 4: Delete “goven“ and substitute “govern“. Add new paragraph as follows: “3.15 Reclaimed materials. The use of reclaimed materials shall be encouraged to the maximum extent possible without jeopardizing the intended end use of the item.“ PAGE ia *4.2.a: Delete “Qualification Tests“ and sub
5、stitute “First article inspection“ *4.4: Delete “Qualification testing“ and substitute “First article inspect ion“. *4.4.2: Delete “Qualification tests“ in title and line 1. Substitutue “First article inspection“. 1 of 3 FSC 6620 THIS DQCUMEN GQNTAlNS PAGES- Licensed by Information Handling Services
6、MIL-1-87923 (3) 66 m 7777906 0345bb7 7 m MIL-1-87923 AMENDMENT 3 PAGE 24 4.6.14: Delete first sentence and substitute: “The indicators main pointer shall not change more than 1 of arc when the lead length between the indicator and transmitter is changed from 5 to 150 feet of No. 22 AWG wire.“ PAGE 2
7、5 4.6.23, line 3: Delete “test plan I“ and substitute “test plan IC“. 4.6.23.1: Delete entire paragraph and substitute the following: “4.6.23.1 Test. Qualification Phase and Production Acceptance (Sampling) phase Tests of MIL-STD-781 shall be conducted. The test level conditions of temperature, inpu
8、t voltage, vibration and cycling of these conditions are as follows : 4.6.23.1.1 Temperature. Temperature shall be -54C to +55“C (-65 OF to +131 OF). 4.6.23.1.2 Temperature cycling. Temperature cycling shall be time to stabilize at low temperature followed by time to stabilize at high temperature, p
9、lus 2 hours. test level temperature. Turn the equipment on and allow it to experience the combined effect of chamber heating and equipment operation until the point of maximum thermal inertia stabilises at the higher temperature as determined in accordance with the thermal survey (see 5.1.5). Mainta
10、in the equipment at the upper test level temperature for two (2) hours. Turn the equipment off and allow it to experience chamber cooling until the point of maximum thermal inertia stabilizes at the lower test level temperature. This cycle shall continue for the duration of the test. Stabilize the e
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AIRFORCEMILI8792331983INDICATORTORQUEMETERAEU13AAEU13A 扭矩 指示器 PDF

链接地址:http://www.mydoc123.com/p-428012.html