ABS 180 CORR-2018 RULES FOR BUILDING AND CLASSING OFFSHORE SUPPORT VESSELS 2018.pdf
《ABS 180 CORR-2018 RULES FOR BUILDING AND CLASSING OFFSHORE SUPPORT VESSELS 2018.pdf》由会员分享,可在线阅读,更多相关《ABS 180 CORR-2018 RULES FOR BUILDING AND CLASSING OFFSHORE SUPPORT VESSELS 2018.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、 RULES FOR BUILDING AND CLASSING OFFSHORE SUPPORT VESSELS 2018 CORRIGENDA/EDITORIALS 1 March 2018 Page No. Paragraph Comments Part 4 Vessel Systems and Machinery Chapter 1 General Section 1 Classification of Machinery 11 4-1-1/Table 3 For Item 21, Rule Reference to read “4-8-5/5.17.11”. Part 4 Vesse
2、l Systems and Machinery Chapter 6 Piping Systems Section 2 Metallic Piping 374 4-6-2/Table 8 For NPS of 5 in., outside diameter in inches to read “5.563”. Part 5 Specialized Services Chapter 1 Vessels Intended for Offshore Support Services Section 1 General 5 5-1-1/Table 1 Notation “Well Test Servic
3、e” to read “Well Test”. Part 5 Specialized Services Chapter 1 Vessels Intended for Offshore Support Services Section A1 Review of Temporary Industrial Equipment and Modules 16 5-1-A1/1 In first paragraph, “portable industrial module are installed” to read “portable industrial module is installed”. 1
4、6 5-1-A1/1.5 In first paragraph, “scantlings shall comply” to read “scantlings are to comply”. 16 5-1-A1/1.5 In second paragraph, “forces, than these loads” to read “forces, then these loads”. 17 5-1-A1/3 In last line, “IEC 60092-502, than the list” to read “IEC 60092-502, then the list”. 17 5-1-A1/
5、5.1 In first paragraph, “General Arrangement drawing must be submitted” to read “General Arrangement drawing is to be submitted”. 17 5-1-A1/5.1 In first paragraph “shall be” to read “is to be”. (4 places) 17 5-1-A1/5.1 In first paragraph “If the location of equipment changes than” to read “If the lo
6、cation of equipment changes, then”. 17 5-1-A1/5.1 In first paragraph “equipment has been removed notice” to read “equipment has been removed, a notice”. 17 5-1-A1/5.1 In second paragraph “and to be surveyed” to read “and are to be surveyed”. 17 5-1-A1/5.3 In first paragraph “securing devices must be
7、 reviewed” to read “securing devices are to be reviewed”. 17 5-1-A1/5.3 In first paragraph “securing details shall be shown” to read “securing details are to be shown”. 17 5-1-A1/5.3 In first paragraph “Cargo Securing Manual than” to read “Cargo Securing Manual, then”. 17 5-1-A1/5.3.1 In second para
8、graph “effectiveness of the clips shall be reduced” to read “effectiveness of the clips is to be reduced”. ABSRULES FOR BUILDING AND CLASSING OFFSHORE SUPPORT VESSELS .2018 1 Corrigenda/Editorials 1 March 2018 Page No. Paragraph Comments Part 5 Specialized Services Chapter 1 Vessels Intended for Off
9、shore Support Services Section A1 Review of Temporary Industrial Equipment and Modules 17 5-1-A1/5.3.1 In third paragraph “means of securing than” to read “means of securing, then”. 17 5-1-A1/5.3.1 In third paragraph “shall be able to resist” to read “are to be able to resist”. 18 5-1-A1/5.3.2 In fi
10、rst paragraph “pieces of lashing equipment being used shall comply” to read “pieces of lashing equipment being used are to comply”. 18 5-1-A1/5.3.2 In second paragraph “shall be able to resist” to read “are to be able to resist”. 19 5-1-A1/5.3.3 In first paragraph “parts shall be provided” to read “
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS180CORR2018RULESFORBUILDINGANDCLASSINGOFFSHORESUPPORTVESSELS2018PDF

链接地址:http://www.mydoc123.com/p-418498.html