1、Section 27 CONCRETE CULVERTS 27.1 GENERAL This work shall consist of fabricating, furnishing, and installing buried precast concrete culverts conforming to these Specifications, the special provisions and the details shown on the plans. Precast reinforced concrete pipe shall be circular, arch or ell
2、iptical, as specified. Precast rein- forced concrete box sections shall be of the dimensions specified or shown on the plans. 27.2 WORKING DRAWINGS When complete details are not provided in the plans, or when required or permitted by provisions in the contract, the Contractor shall prepare and submi
3、t to the Engineer working drawings of the structure or installation system proposed for use. Fabrication or installation of the struc- ture shall not begin until the Engineer has approved the drawings. The working drawings shall show complete de- tails and substantiating calculations of the structur
4、e, the materials, equipment and installation methods the Con- tractor proposes to use. Working drawings shall be submitted sufficiently in advance of the start of the affected work to allow time for review by the Engineer and correction of the submittal by the Contractor without delaying the work. A
5、pproval by the Engineer shall not relieve the Contractor of any re- sponsibility under the contract for the successful comple- tion of this work. 27.3 MATERIALS 27.3.1 Reinforced Concrete Culverts The materials for reinforced concrete culverts shall meet the requirements of the following specificati
6、ons for the classes and sizes specified above. Precast Reinforced Concrete Circular Pipe AASHTO M 170 or AASHTO M 242 (ASTM C 76 or C 655) Arch Pipe AASHTO M 206 (ASTM C 506) Elliptical Pipe AASHTO M 207 (ASTM C 507) Box Sections AASHTO M 259 and AASHTO M 273 (ASTM C 789 and C 850) 27.3.2 Joint Seal
7、ants 27.3.2.1 Cement Mortar Mortar shall be composed of one part Portland cement and two parts sand by volume. Sand shall be well graded and of such size that all will pass a No. 8 sieve. The ma- terials shall be mixed to a consistency suitable for the pur- pose intended and used within 30 minutes a
8、fter the mix- ing water has been added. Admixtures, if any, shall be approved by the Engineer prior to use. 27.3.2.2 Flexible Watertight Gaskets Flexible watertight gasketed joints shall conform to the requirements of AASHTO M 198 and shall be flexible and capable of withstanding expansion, contract
9、ion, and set- tlement of the pipeline. All rubber gaskets shall be stored in as cool a place as practicable, preferably at 70F or less. Rubber gaskets, of the type requiring lubrication, shall be lubricated with the lubricant recommended and sup- plied by the manufacturer of the pipe. 669 670 HIGHWA
10、Y BRIDGES 27.3.2.3 27.3.2.3 Other Joint Sealant Materials Other joint sealant materials shall be submitted for test- ing in advance of their use and shall not be used prior to receiving approval by the Engineer. 27.3.3 Bedding, Haunch, Lower Side and Backfill or Overfill Material 27.3.3.1 Precast Re
11、inforced Concrete Circular, Arch, and Elliptical Pipe Bedding, haunch, lower side and overfill material shall conform to Figures 27.5A, 27.5B, 2732, and 27.5D which define soil areas and critical dimensions, and Ta- bles 27.5A and 27.5B, which list generic soil types and minimum compaction requireme
12、nts, and minimum bed- ding thicknesses for the four Standard Installation Types. The AASHTO Soil Classifications and the USCS Soil Classifications equivalent to the generic soil types in the Standard Installations are presented in Table 27.32. 27.3.3.2 Precast Reinforced Concrete Box Sections For pr
13、ecast reinforced concrete box sections, bedding and backfill material shall conform to Figure 27.5E with the following exceptions. Bedding material may be sand or select sandy soil all of which passes a U.S. Standard Ys-inch sieve and not more than 10% of which passes a U.S. Standard No. 200 sieve.
14、Backfill may be select ma- terial and shall be free of organic material, stones larger than 3 inches in the greatest dimension, frozen lumps, or moisture in excess of that permitting the specified com- paction. 27.4 ASSEMRLY cracks 0.01 inch or less in width are considered acceptable without repair.
15、 Cracks determined to be detrimental shall be sealed by a method approved by the Engineer. 27.4.2 Joints Joints for reinforced concrete pipe and precast rein- forced concrete box sections shall comply with the details shown on the plans, the approved working drawings, and the requirements of the spe
16、cial provisions. Each joint shall be sealed to prevent infiltration of soil fines or water as re- quired by the contract documents. Joint sealant materials shall comply with the provisions of Article 27.3.2. The Contractor shall furnish to the Engineer a certifi- cate of compliance that the material
17、 being furnished con- forms to the joint property requirements. Field tests may be required by the Engineer whenever there is a question regarding compliance with contract requirements. 27.5 INSTALLATION 27.5.1 General Trenches shall be excavated to the dimensions and grade specified in the plans or
18、 ordered by the Engineer. The Contractor shall make such provisions as required to insure adequate drainage of the trench to protect the bed- ding during construction operations. Proper preparation of foundation, placement of foundation material where re- quired, and placement of bedding material sh
19、all precede the installation of the culvert. This shall include necessary leveling of the native trench bottom or the top of founda- tion materials as well as placement and grading of re- quired bedding material to a uniform grade so that the en- tire length of pipe will be supported on a uniform sl
20、ightly yield bedding. The backfill material shall be placed around the culvert in a manner to meet the requirements specified. 27.4.1 General 27.5.2 Bedding Precast concrete units or elements shall be assembled in accordance with the manufacturer?s instructions. All units or elements shall be handle
21、d with reasonable care and shall not be rolled or dragged over gravel or rock. Care shall be taken to prevent the units from striking rock or other hard objects during placement. Cracks in an installed precast concrete culvert that ex- ceed 0.01-inch width will be appraised by the Engineer con- side
22、ring the structural integrity, environmental conditions, and the design service life of the culvert. Generally in non- corrosive environments, cracks O. 10 inch or less in width are considered acceptable; in corrosive environments, those 27.5.2.1 General If rock strata or boulders are encountered un
23、der the culvert within the limits of the required bedding, the rock or boulders shall be removed and replaced with bedding material. Special care may be necessary with rock or other unyielding foundations to cushion pipe from shock when blasting can be anticipated in the area. Where, in the opin- io
24、n of the Engineer, the natural foundation soil is such as to require stabilization, such material shall be replaced by a layer of bedding material. Where an unsuitable material 27.5.2.1 DIVISION II-CONSTRUCTION 67 1 h c 5 v a v b Cu al O al al cn I - o c r U C 1 O I m 7 b Cu Q, O c al Q, Ln I o, C U
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AASHTOHB17DIVISIONIISEC272002DIVISIONIICONSTRUCTIONCONCRETECULVERTS 混凝土 涵洞 PDF

链接地址:http://www.mydoc123.com/p-417594.html