AASHTO HB-17 DIVISION II SEC 25-2002 Division II Construction - Steel and Concrete Tunnel Liners《钢和混凝土涵洞衬里》.pdf
《AASHTO HB-17 DIVISION II SEC 25-2002 Division II Construction - Steel and Concrete Tunnel Liners《钢和混凝土涵洞衬里》.pdf》由会员分享,可在线阅读,更多相关《AASHTO HB-17 DIVISION II SEC 25-2002 Division II Construction - Steel and Concrete Tunnel Liners《钢和混凝土涵洞衬里》.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、Section 25 STEEL AND CONCRETE TUNNEL LINERS 25.1 SCOPE These specifications are intended to cover the installa- tion of tunnel liner plates in tunnels constructed by con- ventional tunnel methods. For the purposes of these Spec- ifications, tunnels excavated by full face, heading and bench, or multi
2、ple drift procedures are considered con- ventional methods. Liner plates used with any construc- tion procedure utilizing a full or partial shield, a tunneling machine, or other piece of equipment which will exert a force on the liner plates for the purpose of propelling, steering, or stabilizing th
3、e equipment are considered spe- cial cases and are not covered by these Specifications. 25.2 DESCRIPTION 25.2.1 This work shall consist of furnishing cold-formed steel tunnel liner plates or precast concrete plates con- forming to these specifications and of the sizes and di- mensions required on th
4、e plans, and installing such plates at the locations designated on the plans by the Engineer, and in conformity with the lines and grades established by the Engineer. The completed liner shall consist of a series of liner plates assembled with staggered longitudinal joints. Steel tunnel liner plates
5、 shall preferably be of a type which is commercially available. Precast concrete tunnel liner plates shall be such that their size and shape suits the method and equipment being used to install them. 25.3 MATERIALS AND FABRICATION Liner plates shall be fabricated to fit the cross section of the tunn
6、el. 25.3.1 General Steel liner plates herein described must meet the Sec- tional Properties of thickness, area, and moment of iner- tia shown on the plans. If not shown on the plans, the properties shall be as listed in Division I, Article 16.3. All steel plates shall be connected by bolts on both l
7、on- gitudinal and circumferential seams or joints and shall be so fabricated as to permit complete erection from the inside of the tunnel. Bolt sizes and properties shall be in accordance with the manufacturers standard but not less than those specified in Division 1, Article 16.7. Grout holes 2 inc
8、hes or larger in diameter shall be provided as shown on the plans to permit grouting as the erection of tunnel liner plates progresses. Precast concrete tunnel liner plates shall conform to the details shown on the plans and the requirements of Section 8, “Concrete Structures.” If such details are n
9、ot provided and the plans or the specifications allow the Contractor to propose the use of concrete liner plates, the Contractor shall submit working drawings and specifica- tions to the Engineer for approval. Such drawings and specifications shall describe materials to be used, plate dimensions, re
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AASHTOHB17DIVISIONIISEC252002DIVISIONIICONSTRUCTIONSTEELANDCONCRETETUNNELLINERS 混凝土 涵洞 衬里 PDF

链接地址:http://www.mydoc123.com/p-417592.html