《ACI 313-1997 Standard Practice for Design and Construction of Concrete Silos and Stacking Tubes for Storing Granular Materials (Incorporates Errata September 12 2007 and October 29.pdf》由会员分享,可在线阅读,更多相关《ACI 313-1997 Standard Practice for Design and Construction of Concrete Silos and Stacking Tubes for Storing Granular Materials (Incorporates Errata September 12 2007 and October 29.pdf(37页珍藏版)》请在麦多课文档分享上搜索。
1、ACI 313-97 was adopted as a standard of the American Concrete Institute on January7, 1997, to supersede ACI 313-91, in accordance with the Institutes standardizationprocedures.Copyright 1998, American Concrete Institute.All rights reserved including rights of reproduction and use in any form or by a
2、nymeans, including the making of copies by any photo process, or by electronic ormechanical device, printed, written, or oral, or recording for sound or visual reproductionor for use in any knowledge or retrieval system or device, unless permission in writing isobtained from the copyright proprietor
3、s.This standard was submitted to letter ballot of the committeeand was approved in accordance with Institute standardizationprocedures.313-1This ACI standard practice gives material, design, and constructionrequirements for concrete silos, stave silos, and stacking tubes for storinggranular material
4、s. It includes design and construction recommendations forcast-in-place or precast and conventionally reinforced or post-tensioned silos.Silos and stacking tubes are special structures, posing special problemsnot encountered in normal building design. While this standard refers to“Building Code Requ
5、irements for Structural Concrete (ACI 318)” for manyrequirements, it puts forth special requirements for the unique cases of staticand dynamic loading from funnel flow, mass flow, concentric flow, and asym-metric flow in silos, and the special loadings on stacking tubes. The standardincludes require
6、ments for seismic design and hopper bottom design.Keywords: asymmetric flow; bins; circumferential bending; concrete;concrete construction; dead loads; dynamic loads: earthquake resistantstructures; formwork (construction); funnel flow; granular materials; hop-pers; jumpforms; lateral loads: loads (
7、forces); lowering tubes; mass flow;overpressure; quality control; reinforced concrete; reinforcing steels; silos;slipform construction; stacking tubes; stave silos; stresses; structural analysis;structural design; thermal stresses; walls.CONTENTSChapter 1General, p. 313-21.1Introduction1.2Definition
8、s1.3Scope1.4Drawings, specifications, and calculationsChapter 2Materials, p. 313-32.1General2.2Cements2.3Aggregates2.4Water2.5Admixtures2.6Metal2.7Precast concrete staves2.8Tests of materialsChapter 3Construction requirements, p. 313-33.1General3.2Concrete quality3.3Sampling and testing concrete3.4D
9、etails and placement of reinforcement3.5Forms3.6Concrete placing and finishing3.7Concrete protection and curing3.8Lining and coating3.9Tolerances for slipformed and jumpformed structuresChapter 4Design, p. 313-44.1NotationStandard Practice for Design and Construction of Concrete Silos and Stacking T
10、ubes for Storing Granular Materials (ACI 313-97)An ACI StandardACI 313-97Mostafa H. MahmoudChairmanVahe A. Aprahamian Donald MidgleyWilliam D. Arockiasamy German R. Gurfinkel Jack MollLeon Bialkowski Ernest C. Harris Lee A. NashAlfred G. Bishara Donald S. Jack Rodney M. NohrWilliam H. Bokhoven Richa
11、rd T. Jenkyn J. Michael RotterWilliam L. Clark Michael E. Johnson John E. SadlerJames M. Ebmeier Robert D. Johnson Sargis S. SafarianStephen G. Frankosky F. Thomas Johnston Joseph R. TuckerReported by ACI Committee 313313-2 ACI STANDARD4.2General4.3Details and placement of reinforcement4.4Loads4.5Wa
12、ll design4.6Hopper design4.7Column design4.8Foundation designChapter 5Concrete stave industrial silos, p. 313-95.1Notation5.2Scope5.3Coatings5.4Erection tolerances5.5Wall design5.6Hoops for stave silos5.7Concrete stave testingChapter 6Post-tensioned concrete silos, p. 313-126.1Notation6.2Scope6.3Pos
13、t-tensioning systems6.4Tendon systems6.5Bonded tendons6.6Unbonded tendons6.7Post-tensioning ducts6.8Wrapped systems6.9Details and placement of non-prestressedreinforcement6.10Wall openings6.11Stressing records6.12Design6.13Vertical bending moment and shear due topost-tensioning6.14TolerancesChapter
14、7Stacking tubes, p. 313-157.1Scope7.2General layout7.3Loads7.4Load combinations7.5Tube wall design7.6Foundation or reclaim tunnelChapter 8Specified and recommended references, p. 313-17Appendix ANotation, p. 313-17CHAPTER 1GENERAL1.1IntroductionThis document, which covers design and construction ofc
15、oncrete silos and stacking tubes for storing granular mate-rials, replaced the 1968 ACI Committee 313 Report 65-37and was adopted as an ACI Standard in March 1977 as ACI313-77. It was subsequently revised in 1983 and 1991. Thecurrent revision reflects the most recent state-of-the-art instructural de
16、sign, detail, and construction of concrete silosand stacking tubes.Static pressures are exerted by the stored material at restand shall be computed by methods presented. Flow pressuresthat differ from static pressures are exerted by the storedmaterial during flow and also shall be computed by themet
17、hods presented.Design of the structures shall consider both static and flowloading.Applicable sections of ACI 318 shall apply.1.2DefinitionsThe term “silo,” as used herein, applies to any uprightcontainer for storing bulk granular material.Alternate names such as “bins” and “bunkers” are used indiff
18、erent localities, but for purposes of this Standard, all suchstructures are considered to be silos.“Stacking tubes” or “lowering tubes” are relatively slender,free-standing, tubular concrete structures used to stack conicalpiles of granular materials. See Commentary Section 7.2.“Slipformed” silos ar
19、e constructed using a typically 4 ft.(1.2 m) high continuously moving form.“Jumpformed” silos are constructed using three typically4 ft. (1.2 m) high fixed forms. The bottom lift is jumped tothe top position after the concrete hardens sufficiently.A “hopper” is the sloping, walled portion at the bot
20、tom ofa silo.“Stave silos” are silos assembled from small precastconcrete units called “staves,” usually tongued and grooved,and held together by exterior adjustable steel hoops.Other special terms are defined in the Commentary.1.3ScopeThis Standard covers the design and construction ofconcrete silo
21、s and stacking tubes for storing granular materials.Silos for storing of ensilage have different requirements andare not included. However, industrial stave silos for storageof granular materials are included.Coverage of precast concrete is limited to that for industrialstave silos.The Standard is b
22、ased on the strength design method.Provisions for the effect of hot stored material are included.Explanations of requirements of the Standard, additionaldesign information, and typical details are found in theCommentary.1.4Drawings, specifications, and calculations1.4.1 Project drawings and project
23、specifications for silosshall be prepared under the direct supervision of and bear theseal of the engineer.1.4.2 Project drawings and project specifications shallshow all features of the work, naming the stored materialsassumed in the design and stating their properties, andincluding the size and po
24、sition of all structural components,connections and reinforcing steel, the required concretestrength, and the required strength or grade of reinforcingand structural steel.DESIGN AND CONSTRUCTION OF CONCRETE SILOS AND STACKING TUBES 313-3CHAPTER 2MATERIALS2.1GeneralAll materials and tests of materia
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ACI3131997STANDARDPRACTICEFORDESIGNANDCONSTRUCTIONOFCONCRETESILOSANDSTACKINGTUBESFORSTORINGGRANULARMATERIALSINCORPORATESERRATASEPTEMBER122007ANDOCTOBER29PDF

链接地址:http://www.mydoc123.com/p-401170.html