1、 GUIDE FOR THE CLASSIFICATION OF DRILLING SYSTEMS SEPTEMBER 2012 NOTICE NO. 2 December 2015 The following Changes become EFFECTIVE AS OF 1 DECEMBER 2015. (See http:/www.eagle.org for the consolidated version of the Guide for the Classification of Drilling Systems 2012, with all Notices and Corrigend
2、a incorporated.) Notes - The date in the parentheses means the date that the Rule becomes effective for new construction based on the contract date for construction, unless otherwise noted. (See 1/7.13.2.) SECTION 1 SCOPE AND CONDITIONS OF CLASSIFICATION 3 Suspension and Cancellation of Class (Revis
3、e Paragraph 1/3.7, as follows:) 3.7 Cancellation of Class (1 December 2015) If the circumstances leading to suspension of Class are not corrected within the time specified, Class will be cancelled. Class is cancelled immediately when drilling systems, subsystems, equipment, and/or components are ope
4、rated without having completed recommendations which were required to be dealt with before the drilling system was brought back into service. When Class has been suspended for a period of three (3) months due to overdue Annual, Special or other periodical surveys required for maintenance of Class; o
5、verdue Continuous Survey items; or overdue outstanding recommendations, the affected CDS Notation will be canceled. A longer suspension period may be granted for drilling systems, subsystems, equipment, and/or components which are either laid up, awaiting disposition of a casualty or under attendanc
6、e for reinstatement. 5 Class Notation (Revise Paragraph 1/5.1, as follows:) 5.1 ABS Class Notation (1 December 2015) Drilling systems, subsystems, equipment, and/or components that have been built, installed and commissioned to the satisfaction of the Surveyors to the full requirements of this Guide
7、, where approved by the Committee for service for the specified design environmental conditions, may be classed and distinguished in the ABS Record by the notation null CDS. ABSGUIDE FOR THE CLASSIFICATION OF DRILLING SYSTEMS .2012 1 Notice No. 2 December 2015 Upon request by the owner, null CDS can
8、 be reduced in scope. Following completion of the requirements to change the class scope, the existing null CDS may be exchanged for one or more of the following sub-class designations: null CDS(WCS) applies to the classification of well control system including well control equipment hardware and a
9、ssociated control systems. null CDS(DSD) applies to the classification of the derrick systems including drawworks, hoisting and drilling and motion compensating systems. null CDS(DSC) applies to the classification of the drilling fluid circulating system. null CDS(DSP) applies to the classification
10、of the specialized pipe and tubular handling systems. Note: null CDS(WCS+DSD) class designation would apply where the well control and derrick systems were classed and null CDS(DSC) and null CDS(DSP) were not selected. SECTION 2 DESIGN OF DRILLING SYSTEMS 7 Design Plans and Data (Revise Paragraph 2/
11、7.15, as follows:) 7.15 Burner/Flare Booms (Permanently Fitted) (1 December 2015) Submit the following documentation for the burner/flare boom fitted as part of the well control system: i) Design basis for the burner/flare boom, including: Descriptions of the burner flare boom and associated compone
12、nts Equipment list Equipment technical specifications and data sheets Load cases and limit states for all design and operating conditions Assumptions used in the design analysis of the burner flare boom structure and associated components Design conditions, including: - Environmental - Operating - S
13、urvival - Lifting, if applicable Combined load cases and limit states for all design and operating conditions Plans showing intended location of the boom on the installation Design references, codes, standards, or guidelines Design analysis methodology for the burner flare boom structure and associa
14、ted components, and component analyses including computer modeling and computer program used Design temperature (maximum, minimum) Material specifications and material properties for all load-bearing components and bolts (if bolted design), including CVN testing requirements, as applicable ii) Descr
15、iptions of all computer programs, analysis methodologies and limits, and other calculation procedures that will form the basis of the structural design and analysis 2 ABSGUIDE FOR THE CLASSIFICATION OF DRILLING SYSTEMS .2012 Notice No. 2 December 2015 iii) Structural analysis report: Design load dev
16、elopment and computer input for all design conditions Computer model geometry plots (group IDs, joint numbers, members and lengths, critical unity checks) Allowable stresses Computer stress analysis Computer output: support reactions, unity stress checks Justifications for any stress exceeding the s
17、tated allowable stress, as applicable iv) Structural drawings: General arrangement drawings Burner Flare Boom assembly drawings Geometry layout drawing; showing overall dimensions of burner flare boom and indicating the size of each member Detail drawings of the main structural elements of the burne
18、r flare boom, including: - Details and sizes for main structural elements - Material specifications and material properties for all load-bearing components and bolts (if bolted design), including CVN testing requirements, as applicable - Bolt connections and tightening procedures - Welding details a
19、nd other methods of connection Base plate and anchor bolt plan Bolts sheet SECTION 3 DRILLING SYSTEMS 11 Hoisting, Lifting, Rotating and Handling Systems 11.1 Derricks/Masts 11.1.2 Design Loads (Revise Item 3/11.1.2iii), as follows:) iii) (1 December 2015) Upon request, ABS may allow a 20% increase
20、in allowable stresses, as provided in API Spec 4F. If so requested, appropriate supporting calculations are to be submitted for review. (Revise Item 3/11.1.2iv), as follows:) iv) (1 December 2015) The Owner/Operator is required to specify the geographic region of operation, the static loads (dead we
21、ight, hook load, static rotary load, fluid load, setback loads, etc.) and dynamic loads (inertial, dynamic amplification, erection, transportation, wind, transit, motion, acceleration, seismic, etc.) on the derrick/mast, as required in API Spec 4F. Additionally, the following loads are also to be gi
22、ven consideration, where applicable: ABSGUIDE FOR THE CLASSIFICATION OF DRILLING SYSTEMS .2012 3 Notice No. 2 December 2015 a) The accumulation of ice and snow on a structure in increasing its dead load. b) The wind-induced load is to be included in the design analysis of the derrick/mast structure
23、and is to consider the following, as applicable: 1) The use of wind speeds higher than those provided in API Spec 4F, where required by the Owner/Operator, for regions not specified within API Spec 4F, ISO 19901-1, or API Bull 2INT-MET. 2) The minimum wind velocity for unrestricted offshore service
24、for all normal drilling and transit conditions is not to be less than 36 m/s (70 knots), as specified in 3-1-3/1.3 in the ABS MODU Rules. It should be noted that wind velocities in the ABS MODU Rules are 1 minute average velocities and therefore these are to be converted to 3 second gust velocities
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS57NOTICE22015GUIDEFORTHECLASSIFICATIONOFDRILLINGSYSTEMSPDF

链接地址:http://www.mydoc123.com/p-400906.html