ABS 272-2017 GUIDANCE NOTES ON QUALIFYING NEW TECHNOLOGIES.pdf
《ABS 272-2017 GUIDANCE NOTES ON QUALIFYING NEW TECHNOLOGIES.pdf》由会员分享,可在线阅读,更多相关《ABS 272-2017 GUIDANCE NOTES ON QUALIFYING NEW TECHNOLOGIES.pdf(45页珍藏版)》请在麦多课文档分享上搜索。
1、 Guidance Notes on Qualifying New Technologies GUIDANCE NOTES ON QUALIFYING NEW TECHNOLOGIES APRIL 2017 American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 2017 American Bureau of Shipping. All rights reserved. ABS Plaza 16855 Northchase Drive Houston, TX 770
2、60 USAForeword Foreword The marine and offshore industries regularly develop new technologies that have no service history in the proposed application or environment. Often, governing industry codes and regulations do not develop at the same pace as technology. These new technologies have little or
3、no precedent and may be so different from existing designs that the requirements contained in class Rules may not be directly applicable. These Guidance Notes describe the ABS approach for qualification of new technologies to confirm their ability to perform intended functions in accordance with def
4、ined performance requirements. This document also provides details regarding the required submittals and the key interaction points with ABS during the new technology development to benefit from ABS involvement as a trusted advisor. A systems engineering approach to qualification is introduced in th
5、is document that allows for systematic and consistent evaluation of new technologies as they mature from a concept through confirmation of operational integrity in their intended applications. The approach is divided into a five stage process that is aligned with the typical product development phas
6、es of a new technology: Feasibility Stage Concept Verification Stage Prototype Validation Stage System Integration Stage Operational Stage Completion of qualification activities within each stage of the new technology qualification process results in a Statement of Maturity issued to the client atte
7、sting to the maturity level of the new technology. Upon completion of the Prototype Validation Stage, the new technology may be “Type Approved” under the ABS Type Approval Program to limit repeated evaluation of identical designs for eligible products. During the Prototype Validation Stage, if all t
8、he engineering evaluations have been completed, a Product Design Assessment (PDA) can be issued prior to further consideration for ABS Type Approval. The integration of the new technology qualification process with the Novel Concept Class Approval process (as presented within the ABS Guidance Notes
9、on Review and Approval of Novel Concepts) provides end users of the qualified technologies with the added benefit that the transition from new technology qualification to Class Approval will be seamless. It provides regulatory agencies with the confidence that all hazards associated with the introdu
10、ction of the new technology to the market has been systematically identified and mitigated. It is to be noted that when applying these Guidance Notes for certification or classification purposes in conjunction with Novel Concept Class Approval process, the primary driver for classification acceptanc
11、e will be safety even though there may be additional functional requirements (e.g., reliability) defined by the client. These Guidance Notes become effective on the first day of the month of publication. Users are advised to check periodically on the ABS website www.eagle.org to verify that this ver
12、sion of these Guidance Notes is the most current. We welcome your feedback. Comments or suggestions can be sent electronically by email to rsdeagle.org. Terms of Use The information presented herein is intended solely to assist the reader in the methodologies and/or techniques discussed. These Guida
13、nce Notes do not and cannot replace the analysis and/or advice of a qualified professional. It is the responsibility of the reader to perform their own assessment and obtain professional advice. Information contained herein is considered to be pertinent at the time of publication, but may be invalid
14、ated as a result of subsequent legislations, regulations, standards, methods, and/or more updated information and the reader assumes full responsibility for compliance. This publication may not be copied or redistributed in part or in whole without prior written consent from ABS. ii ABSGUIDANCE NOTE
15、S ON QUALIFYING NEW TECHNOLOGIES .2017 Table of Contents GUIDANCE NOTES ON QUALIFYING NEW TECHNOLOGIES CONTENTS SECTION 1 Introduction 1 1 Overview . 1 3 Background . 1 5 Application 2 7 New Technology Qualification Process 2 9 ABS Type Approval Program 4 11 Definitions . 4 13 Abbreviations 6 FIGURE
16、 1 New Technology Qualification Process 3 SECTION 2 Getting Started . 7 1 New Technology Qualification Project and Team Setup 7 3 New Technology Decomposition and Requirements Gathering . 7 3.1 Introduction 7 3.3 New Technology System Requirements and Description Document 9 5 New Technology Screenin
17、g 12 7 New Technology Stage Determination . 13 9 New Technology Qualification Plan and Activities 14 9.1 Risk Assessment Requirements 14 9.3 Engineering Evaluation 16 9.5 Design Improvements . 17 TABLE 1 Systematic Screening Table . 13 TABLE 2 Recommended Risk Assessment Techniques . 16 FIGURE 1 New
18、 Technology System Hierarchy 8 FIGURE 2 New Technology Qualification Stage Iterative Process 14 ABSGUIDANCE NOTES ON QUALIFYING NEW TECHNOLOGIES .2017 iii SECTION 3 Feasibility Stage . 19 1 Introduction . 19 3 Qualification Activities . 19 3.1 Engineering Evaluation 19 3.3 Risk Assessment . 19 5 Sum
19、mary of Submittals . 20 5.1 Engineering Evaluation 20 5.3 Risk Assessment . 20 7 Feasibility Stage Completion: Technology Feasible . 20 SECTION 4 Concept Verification Stage 21 1 Introduction . 21 3 Qualification Plan Activities . 21 3.1 Engineering Evaluation 21 3.3 Risk Assessment . 22 5 Summary of
20、 Submittals . 23 5.1 Engineering Evaluation 23 5.3 Risk Assessment . 23 7 Concept Verification Stage Completion: Concept Verified . 23 SECTION 5 Prototype Validation Stage 24 1 Introduction . 24 3 Qualification Plan Activities . 24 3.1 Engineering Evaluation 24 3.3 Risk Assessment . 25 5 Summary of
21、Submittals . 26 5.1 Engineering Evaluation 26 5.3 Risk Assessment . 26 7 Prototype Stage Completion: Technology Qualified . 27 9 ABS Type Approval Program 27 SECTION 6 Systems Integration Stage 28 1 Introduction . 28 3 Qualification Plan Activities . 28 3.1 Engineering Evaluation 28 3.3 Risk Assessm
22、ent . 29 5 Summary of Submittals . 29 5.1 Engineering Evaluation 29 5.3 Risk Assessment . 29 7 System Integration Stage Completion: Technology Integrated 29 SECTION 7 Operational Stage . 30 1 Introduction . 30 3 Qualification Plan Activities . 30 5 Summary of Submittals . 31 7 Operational Stage Comp
23、letion: Operationally Qualified . 31 iv ABSGUIDANCE NOTES ON QUALIFYING NEW TECHNOLOGIES .2017 APPENDIX 1 References 32 APPENDIX 2 Comparison of ABS Qualification Stages with Industry TRLs . 34 1 Introduction . 34 TABLE 1 ABS Qualification Stages Comparison with Various Industry TRLs 34 APPENDIX 3 N
24、ew Technology Stage Determination . 35 1 Introduction . 35 APPENDIX 4 New Technology Qualification Plan (NTQP) Template 38 1 Introduction . 38 3 New Technology Qualification Plan (NTQP) Template 38 ABSGUIDANCE NOTES ON QUALIFYING NEW TECHNOLOGIES .2017 v This Page Intentionally Left Blank Section 1:
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS2722017GUIDANCENOTESONQUALIFYINGNEWTECHNOLOGIESPDF

链接地址:http://www.mydoc123.com/p-400852.html