ABS 2 PART 2-2017 RULES FOR MATERIALS AND WELDING 2017 PART 2.pdf
《ABS 2 PART 2-2017 RULES FOR MATERIALS AND WELDING 2017 PART 2.pdf》由会员分享,可在线阅读,更多相关《ABS 2 PART 2-2017 RULES FOR MATERIALS AND WELDING 2017 PART 2.pdf(446页珍藏版)》请在麦多课文档分享上搜索。
1、 Part 2: Rules for Materials and Welding RULES FOR MATERIALS AND WELDING 2017 PART 2 American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 2016 American Bureau of Shipping. All rights reserved. ABS Plaza 16855 Northchase Drive Houston, TX 77060 USA Rule Change
2、Notice (201 7 ) Rule Change Notice (2017) The effective date of each technical change since 1993 is shown in parenthesis at the end of the subsection/paragraph titles within the text of each Part. This date is based on the date of purchase order of the materials. Unless a particular date and month a
3、re shown, the years in parentheses refer to the following effective dates: (2000) and after 1 January 2000 (and subsequent years) (1996) 9 May 1996 (1999) 12 May 1999 (1995) 15 May 1995 (1998) 13 May 1998 (1994) 9 May 1994 (1997) 19 May 1997 (1993) 11 May 1993 Listing by Effective Dates of Changes f
4、rom the 2016 Rules EFFECTIVE DATE 1 January 2017 shown as (2017) (based on the date of purchase order of the materials) Part/Para. No. Title/Subject Status/Remarks 2-1-1/7.2 Electronic Certification System To mitigate the risk of misrepresentation on ABS approval by the client. 2-1-5/5 Heat Treatmen
5、t To clearly indicate that HT facilities can be approved independently, if they carry out the mechanical tests and NDE. 2-1-6/1.1 General To clearly indicate that the raw material such as ingots or billets or others is to be procured from an ABS approved facility. 2-1-6/5.1 General To clearly indica
6、te that the raw material such as ingots or billets or others is to be procured from an ABS approved facility. 2-3-7/1.1.1 General To clearly indicate that the raw material such as ingots or billets or others is to be procured from an ABS approved facility. 2-3-7/1.5.1 General To clearly indicate tha
7、t HT facilities can be approved independently, if they carry out the mechanical tests and NDE. 2-3-7/1.11.1(c) Small Forgings To specify that in the case of carbon and low alloy steel small forgings, test sampling is based on the furnace mass rather than the no. of forgings, in line IACS W7. 2-3-7/F
8、igure 1 (New) Gear Ring Forgings Test Specimen Locations and Orientations To clearly indicate the test coupon locations for carbon and low alloy steels. 2-3-7/Figure 2 (New) Pinion or Gear Forging Test Specimen Locations and Orientations To clearly indicate the test coupon locations for carbon and l
9、ow alloy steels. 2-3-7/Figure 3 (New) Gear Shaft Forging Test Specimen Locations and Orientations To clearly indicate the test coupon locations for carbon and low alloy steels. 2-3-7/1.11.1(g) Surface Hardened Forgings To indicate that the carburized forging requirement is also applicable to other t
10、ypes of surface hardening processes (except for induction hardening). 2-3-7/1.11.1(h) (New) Continuous Heat Treatment To indicate the continuous heat treatment requirements are to be specially agreed with ABS. 2-3-7/1.5.7 Surface Hardening To clearly indicate that HT facilities can be approved indep
11、endently, if they carry out the mechanical tests and NDE. 2-3-7/3.1.1 General To clearly indicate that the raw material such as ingots or billets or others is to be procured from an ABS approved facility. 2-3-7/3.5.1 General To clearly indicate that HT facilities can be approved independently, if th
12、ey carry out the mechanical tests and NDE. 2-3-7/3.5.8 (New) Surface Hardening To clearly indicate that HT facilities can be approved independently, if they carry out the mechanical tests and NDE. 2-3-7/3.9.3(c) Small Forgings To specify that in the case of carbon and low alloy steel small forgings,
13、 test sampling is based on the furnace mass rather than the no. of forgings, in line IACS W7. ii ABSRULES FOR MATERIALS AND WELDING .2017 Part/Para. No. Title/Subject Status/Remarks 2-3-7/Figure 4 (New) Pinion or Gear Forging Test Specimen Locations and Orientations To clearly indicate the test coup
14、on locations for carbon and low alloy steels. 2-3-7/Figure 5 (New) Gear Shaft Forging Test Specimen Locations and Orientations To clearly indicate the test coupon locations for carbon and low alloy steels. 2-3-7/3.9.3(g) Surface Hardened Forgings To indicate that the carburized forging requirement i
15、s also applicable to other types of surface hardening processes (except for induction hardening). 2-3-7/3.9.3(h) (New) Continuous Heat Treatment To indicate the continuous heat treatment requirements are to be specially agreed with ABS. 2-3-7/5.1.1 General To clearly indicate that the raw material s
16、uch as ingots or billets or others is to be procured from an ABS approved facility. 2-3-7/5.5.1 General To clearly indicate that HT facilities can be approved independently, if they carry out the mechanical tests and NDE. 2-3-7/5.9.3(c) Small Forgings To specify that in the case of carbon and low al
17、loy steel small forgings, test sampling is based on the furnace mass rather than the no. of forgings, in line IACS W7. 2-3-7/5.9.3(e) (New) Continuous Heat Treatment To indicate the continuous heat treatment requirements are to be specially agreed with ABS. 2-3-7/7.1.1 General To clearly indicate th
18、at the raw material such as ingots or billets or others is to be procured from an ABS approved facility. 2-3-7/7.5.1 General To clearly indicate that HT facilities can be approved independently, if they carry out the mechanical tests and NDE. 2-3-7/7.11.1(c) Small Forgings To specify that in the cas
19、e of carbon and low alloy steel small forgings, test sampling is based on the furnace mass rather than the no. of forgings, in line IACS W7. 2-3-7/7.11.1(e) (New) Continuous Heat Treatment To indicate the continuous heat treatment requirements are to be specially agreed with ABS. 2-3-9/5 Heat Treatm
20、ent To clearly indicate that HT facilities can be approved independently, if they carry out the mechanical tests and NDE. 2-4-1/5.19.1 (New) Repair to Casting Defects Identified after Machining or During Assembly To specify requirements for repairs of castings by welding and temporary welds made to
21、castings. 2-A1 List of Destructive and Nondestructive Tests Required for Materials and Responsibility for Verifying To include witness requirements for steels with enhanced corrosion resistance properties. ABSRULES FOR MATERIALS AND WELDING .2017 iii PART Foreword 2 Foreword For the 1996 edition, th
22、e “Rules for Building and Classing Steel Vessels Part 2: Materials and Welding” was re-titled “Rule Requirements for Materials and Welding (Part 2).” The purpose of this generic title was to emphasize the common applicability of the material and welding requirements in “Part 2” to ABS-classed vessel
23、s, other marine structures and their associated machinery, and thereby make “Part 2” more readily a common “Part” of the various ABS Rules and Guides, as appropriate. Accordingly, the subject booklet, Rules for Materials and Welding (Part 2), is to be considered, for example, as being applicable and
24、 comprising a “Part” of the following ABS Rules and Guides: - Rules for Building and Classing Steel Vessels - Rules for Building and Classing Steel Vessels Under 90 Meters (295 Feet) in Length - Rules for Building and Classing Steel Vessels for Service on Rivers and Intracoastal Waterways - Rules fo
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS2PART22017RULESFORMATERIALSANDWELDING2017PART2PDF

链接地址:http://www.mydoc123.com/p-400752.html