1、 Guide for Systems Verification GUIDE FOR SYSTEMS VERIFICATION JULY 2014 American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 Copyright 2014 American Bureau of Shipping ABS Plaza 16855 Northchase Drive Houston, TX 77060 USA ii ABSGUIDE FOR SYSTEMS VERIFICATION
2、 .2014 Foreword Foreword The marine and offshore industries are increasingly relying on computer-based control systems. Therefore, the verification of the software used in control systems and their integration into the system is an important element within the overall safety assessment. This ABS Gui
3、de for Systems Verification (SV Guide) provides requirements and recommendations for software verification of integrated and non-integrated control systems aboard ships or offshore assets. This Guide is applicable during the initial construction and anytime during the life of the asset. This guide m
4、ay also be used for new, modifications, retrofits, replacements, or upgrades of computer based control systems. The SV Guide was amended to harmonize with the ABS Guide for Integrated Software Quality Management (ISQM) (ISQM Guide) and the software development life cycle. The SV Guide focuses on Har
5、dware-In-the-Loop (HIL) testing of control system software. HIL testing is an acceptable verification method for both the ISQM Guide and the SV Guide. This Guide is meant to be used with other Rules and Guides issued by ABS and other recognized industry standards. This Guide becomes effective on the
6、 first day of the month of publication. Users are advised to check periodically on the ABS website www.eagle.org to verify that this version of this Guide is the most current. We welcome your feedback. Comments or suggestions can be sent electronically by email to rsdeagle.org. ABSGUIDE FOR SYSTEMS
7、VERIFICATION .2014 iii Table of Contents GUIDE FOR SYSTEMS VERIFICATION CONTENTS SECTION 1 General 1 1 Purpose and Scope 1 3 Basis of Notation . 1 5 References 1 5.1 ABS . 1 5.3 IEEE 2 5.5 IEC 2 5.7 ISO 2 5.9 Other . 3 7 Organizations 3 9 Quality Program and Training for V isochronous, droop, etc. v
8、i) The functions for breaker control vii) The functions for alarms and system monitoring See Subsection A2/3 for modeling parameters for the Power Management Control System. 5.5 Thruster Control System The V&V is to verify: i) The automatic control of all thruster functions as described in the FDD.
9、ii) The thruster recovery after a blackout iii) The functions for primary (and auxiliary if available) thruster power unit iv) The local and remote transfer control and alarm functions See Subsection A2/5 for modeling parameters for the Thruster Control System. 7 Retesting ABS is to be notified when
10、 testing or retesting is to be performed. i) Re-testing of the control system is to be performed: a) Upon major upgrade of the control system software including major functionality upgrades b) When desired by the Owner ii) It is recommended that re-testing be performed: a) With new or added function
11、ality that is not defined as a major upgrade b) When desired by the Owner iii) The documents listed in Subsection 3/3 are to be updated, as required, and reissued. Section 3 Verification and Documentation ABSGUIDE FOR SYSTEMS VERIFICATION .2014 13 9 Simulation Program Maintenance i) The V&V and the
12、Owner are to agree upon simulation program archiving. ii) It is recommended that the V&V maintain a backup of the simulation program and any modeling. iii) The V&V is to update the simulation, as required for new functions added to the control system at the time of retesting. iv) The SP is to update
13、 the functional description with minor and major updates, changes or with additional functionality prior to retesting. 14 ABSGUIDE FOR SYSTEMS VERIFICATION .2014 Section 4 : Survey s After Construction and Maintenance of Class SECTION 4 Surveys After Construction and Maintenance of Class 1 General T
14、he provisions of this Section are requirements for the maintenance of classification of the control system(s) associated with the System Verification (SV) Notation. These requirements are in addition to the provisions noted in other ABS Rules and/or Guides, as applicable to the vessel or facility. F
15、or purposes of this Section, the commissioning date will be the date on which a Surveyor issues an Interim Class Certificate to the vessel or facility with the SV notation. 3 Surveys for the System Verification (SV) Notation 3.1 Survey Intervals and Maintenance Manuals/Records All Annual and Special
16、 Periodical Surveys associated with the SV notation are to be carried out at the same time and interval as the periodical classification survey of the vessel or facility in order that they are recorded with the same crediting date. An Annual Survey of the control system(s) associated with the SV not
17、ation is to be carried out by a Surveyor within three months either way of each annual anniversary date of the initial certification survey. A Special Periodical Survey of the control system(s) associated with the SV notation is to be carried out within five years of the initial certification survey
18、 and at five-year intervals thereafter. SV surveys may be offered for survey prior to the due date when so desired, in which case, the survey will be credited as of that date. Maintenance records are to be kept and made available for review by the attending Surveyor. The maintenance records will be
19、reviewed to establish the scope and content of the required Annual and Special Periodical Surveys that are to be carried out by a Surveyor. During the service life of the software system components, maintenance records are to be updated on a regular basis. The Owner is to inform ABS whenever an IL3
20、Software Module is modified or installed in a control system with an SV notation. ABS may audit the vessel upon notification of an IL3 Software Module modification or installation. 3.3 Annual Surveys At each Annual Survey, the Surveyor is to perform an integrated software and hardware configuration
21、audit to include verification of the following: i) Change control procedures, including periodic audits to confirm that procedures are also being followed ii) Examination of Control Equipment Registry (see 8/3.3.1 of the ISQM Guide) iii) Examination of Software Registry (see 8/3.3.2 of the ISQM Guid
22、e) iv) Review of Integrated Control Systems Hardware Registry (see 8/3.3.3 of the ISQM Guide) Section 4 Survey and Maintenance ABSGUIDE FOR SYSTEMS VERIFICATION .2014 15 3.3.1 Examination of Control Equipment Registry i) Identify control equipment that has been changed since the last audit. ii) Exam
23、ine the current version of the control system registry. iii) Record each changed equipment item. iv) List all software hosted on the changed equipment. v) Identify all documentation impacted by the change. vi) Record each documentation change. vii) Note any changes identified that were not listed on
24、 the registry. 3.3.2 Examination of Software Registry i) Identify all control software that has been changed since the last audit. ii) Record each software item change. iii) Inspect all software hosted on the changed equipment identified in 8/3.3.1 of the ISQM Guide. iv) Record software changes on c
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS1892014GUIDEFORSYSTEMSVERIFICATIONPDF