ABS 184 NOTICE 2-2017 GUIDE FOR BUILDING AND CLASSING DRILLSHIPS.pdf
《ABS 184 NOTICE 2-2017 GUIDE FOR BUILDING AND CLASSING DRILLSHIPS.pdf》由会员分享,可在线阅读,更多相关《ABS 184 NOTICE 2-2017 GUIDE FOR BUILDING AND CLASSING DRILLSHIPS.pdf(1页珍藏版)》请在麦多课文档分享上搜索。
1、 GUIDE FOR BUILDING AND CLASSING DRILLSHIPS AUGUST 2011 NOTICE NO. 2 July 2017 The following Rule Change was approved by the ABS Rules Committee on 30 May 2017 and becomes EFFECTIVE AS OF 1 JULY 2017. (See http:/www.eagle.org for the consolidated version of the Guide for Building and Classing Drills
2、hips, 2011 with all Notices and Corrigenda incorporated.) Notes - The date in the parentheses means the date that the Rule becomes effective for new construction based on the contract date for construction, unless otherwise noted. (See 1-1-4/3.3 of the ABS Rules for Conditions of Classification Offs
3、hore Units and Structures (Part 1).) SECTION 4 INITIAL SCANTLING EVALUATION 3 Hull Girder Strength 3.1 Hull Girder Section Modulus (Revise Subparagraph 4/3.1.1, as follows:) 3.1.1 Hull Girder Section Modulus Amidships (1 July 2017) The required hull girder section modulus 0.4L amidships is to be calculated in accordance with 4/3.3, 4/3.5 and 4/3.7. For determination of initial net structural scantlings, the net hull girder section modulus amidships, SMn, is to be calculated in accordance with 4/3.1.2 below. ABSGUIDE FOR BUILDING AND CLASSING DRILLSHIPS .2011 1
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS184NOTICE22017GUIDEFORBUILDINGANDCLASSINGDRILLSHIPSPDF

链接地址:http://www.mydoc123.com/p-400711.html