《API RP 19B-2006 Recommended Practice for Evaluation of Well Perforators (Second Edition Incorporates Addendum 1 April 2014 Addendum 2 December 2014)《油气井聚能射孔器通用技术条件.第2版》.pdf》由会员分享,可在线阅读,更多相关《API RP 19B-2006 Recommended Practice for Evaluation of Well Perforators (Second Edition Incorporates Addendum 1 April 2014 Addendum 2 December 2014)《油气井聚能射孔器通用技术条件.第2版》.pdf(66页珍藏版)》请在麦多课文档分享上搜索。
1、Recommended Practices for Evaluation of Well PerforatorsAPI RECOMMENDED PRACTICE 19B SECOND EDITION, SEPTEMBER 2006REAFFIRMED, APRIL 2011ADDENDUM 1, APRIL 2014ADDENDUM 2, DECEMBER 2014Recommended Practices for Evaluation of Well PerforatorsUpstream SegmentAPI RECOMMENDED PRACTICE 19B SECOND EDITION,
2、 SEPTEMBER 2006REAFFIRMED, APRIL 2011ADDENDUM 1, APRIL 2014ADDENDUM 2, XXXX 2014SPECIAL NOTESAPI publications necessarily address problems of a general nature. With respect to particular circumstances, local, state, and federal laws and regulations should be reviewed.Neither API nor any of APIs empl
3、oyees, subcontractors, consultants, committees, or other assignees make any warranty or representation, either express or implied, with respect to the accuracy, completeness, or usefulness of the information contained herein, or assume any liability or responsibility for any use, or the results of s
4、uch use, of any information or process disclosed in this publication. Neither API nor any of APIs employees, subcontractors, con-sultants, or other assignees represent that use of this publication would not infringe upon pri-vately owned rights.API publications may be used by anyone desiring to do s
5、o. Every effort has been made by the Institute to assure the accuracy and reliability of the data contained in them; however, the Institute makes no representation, warranty, or guarantee in connection with this publication and hereby expressly disclaims any liability or responsibility for loss or d
6、amage resulting from its use or for the violation of any authorities having jurisdiction with which this publi-cation may conflict.API publications are published to facilitate the broad availability of proven, sound engineer-ing and operating practices. These publications are not intended to obviate
7、 the need for applying sound engineering judgment regarding when and where these publications should be utilized. The formulation and publication of API publications is not intended in any way to inhibit anyone from using any other practices.Any manufacturer marking equipment or materials in conform
8、ance with the marking requirements of an API standard is solely responsible for complying with all the applicable requirements of that standard. API does not represent, warrant, or guarantee that such prod-ucts do in fact conform to the applicable API standard.Classified areas may vary depending on
9、the location, conditions, equipment, and substances involved in any given situation. Users of this Recommended Practice should consult with the appropriate authorities having jurisdiction.Users of this Recommended Practice should not rely exclusively on the information con-tained in this document. S
10、ound business, scientific, engineering, and safety judgment should be used in employing the information contained herein. Information concerning safety and health risks and proper precautions with respect to partic-ular materials and conditions should be obtained from the employer, the manufacturer
11、or supplier of that material, or the material safety data sheet.Where applicable, authorities having jurisdiction should be consulted.Work sites and equipment operations may differ. Users are solely responsible for assessing their specific equipment and premises in determining the appropriateness of
12、 applying the Recommended Practice. At all times users should employ sound business, scientific, engi-neering, and judgment safety when using this Recommended Practice.API is not undertaking to meet the duties of employers, manufacturers, or suppliers to warn and properly train and equip their emplo
13、yees, and other exposed, concerning health and safety risks and precautions, nor undertaking their obligations to comply with authorities having jurisdiction.All rights reserved. No part of this work may be reproduced, stored in a retrieval system, or transmitted by any means, electronic, mechanical
14、, photocopying, recording, or otherwise, without prior written permission from the publisher. Contact the Publisher, API Publishing Services, 1220 L Street, N.W., Washington, D.C. 20005.Copyright 2006 American Petroleum InstituteFOREWORDThis document is under the jurisdiction of the API Subcommittee
15、 on Completion Equip-ment. Nothing contained in any API publication is to be construed as granting any right, by impli-cation or otherwise, for the manufacture, sale, or use of any method, apparatus, or product covered by letters patent. Neither should anything contained in the publication be constr
16、ued as insuring anyone against liability for infringement of letters patent.This document was produced under API standardization procedures that ensure appropriate notification and participation in the developmental process and is designated as an API stan-dard. Questions concerning the interpretati
17、on of the content of this publication or comments and questions concerning the procedures under which this publication was developed should be directed in writing to the Director of Standards, American Petroleum Institute, 1220 L Street, N.W., Washington, D.C. 20005. Requests for permission to repro
18、duce or translate all or any part of the material published herein should also be addressed to the director.Generally, API standards are reviewed and revised, reaffirmed, or withdrawn at least every five years. A one-time extension of up to two years may be added to this review cycle. Status of the
19、publication can be ascertained from the API Standards Department, telephone (202) 682-8000. A catalog of API publications and materials is published annually and updated quarterly by API, 1220 L Street, N.W., Washington, D.C. 20005.Suggested revisions are invited and should be submitted to the Stand
20、ards and Publications Department, API, 1220 L Street, NW, Washington, DC 20005, standardsapi.org.iiiCONTENTSPage0 SCOPE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.1 General . . . . . . . . . . . . . . . . . . . .
21、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.2 Implementation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.3 API Registered Perforator Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
22、. . . . . .10.4 Reports and Advertisements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11 EVALUATION OF PERFORATING SYSTEMS UNDER SURFACE . . . . . . . . . . . . .CONDITIONS, CONCRETE TARGETS11.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . .
23、. . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.2 Test Target . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.3 Perforating System Selection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
24、.41.4 Charge Selection and Aging . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .41.5 Multi-Directional Firing Perforator Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . .51.6 Uni-Directional Perforator Systems . . . . . . . . . . . . . . . . . . .
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- APIRP19B2006RECOMMENDEDPRACTICEFOREVALUATIONOFWELLPERFORATORSSECONDEDITIONINCORPORATESADDENDUM1APRIL2014ADDENDUM2DECEMBER2014

链接地址:http://www.mydoc123.com/p-400118.html