1、Recommended Practice for Electrical Submersible Pump InstallationsAPI RECOMMENDED PRACTICE 11S3SECOND EDITION, MARCH 1999REAFFIRMED, OCTOBER 2013Recommended Practice for Electrical Submersible Pump InstallationsUpstream SegmentAPI RECOMMENDED PRACTICE 11S3SECOND EDITION, MARCH 1999REAFFIRMED, OCTOBE
2、R 2013SPECIAL NOTES API publications necessarily address problems of a general nature. With respect to partic- ular circumstances, local, state, and federal laws and regulations should be reviewed. API is not undertaking to meet the duties of employers, manufacturers, or suppliers to warn and proper
3、ly train and equip their employees, and others exposed, concerning health and safety risks and precautions, nor undertaking their obligations under local, state, or fed- eral laws. Information concerning safety and health risks and proper precautions with respect to par- ticular materials and condit
4、ions should be obtained from the employer, the manufacturer or supplier of that material, or the material safety data sheet. Nothing contained in any API publication is to be construed as granting any right, by implication or otherwise, for the manufacture, sale, or use of any method, apparatus, or
5、prod- uct covered by letters patent. Neither should anything contained in the publication be con- strued as insuring anyone against liability for infringement of letters patent. Generally, API standards are reviewed and revised, reamed, or withdrawn at least every five years. Sometimes a one-time ex
6、tension of up to two years will be added to this review cycle. This publication will no longer be in effect five years after its publication date as an operative API standard or, where an extension has been granted, upon republication. Status of the publication can be ascertained from the API Upstre
7、am Segment telephone (202) 682- 80001. A catalog of API publications and materials is published annually and updated quar- terly by API, 1220 L Street, N.W., Washington, D.C. 20005. This document was produced under API standardization procedures that ensure appropri- ate notification and participati
8、on in the developmental process and is designated as an API standard. Questions concerning the interpretation of the content of this standard or com- ments and questions concerning the procedures under which this standard was developed should be directed in writing to the director of the Upstream Se
9、gment, American Petroleum Institute, 1220 L Street, N.W., Washington, D.C. 20005. Requests for permission to repro- duce or translate all or any part of the material published herein should also be addressed to the director. API standards are published to facilitate the broad availability of proven,
10、 sound engineer- ing and operating practices. These standards are not intended to obviate the need for apply- ing sound engineering judgment regarding when and where these standards should be utilized. The formulation and publication of API standards is not intended in any way to inhibit anyone from
11、 using any other practices. Any manufacturer marking equipment or materials in conformance with the marking requirements of an API standard is solely responsible for complying with all the applicable requirements of that standard. API does not represent, warrant, or guarantee that such prod- ucts do
12、 in fact conform to the applicable API standard. All rights reserved. No part of this work may be reproduced, stored in a retrieval system, or transmitted by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission from the publisher: Contact the Pub
13、lishel; API Publishing Services, 1220 L Street, N. IT, Washington, D. C. 20005. Copyright O 1999 American Petroleum Institute FOREWORD This recommended practice is under the jurisdiction of the American Petroleum Institute (API) Subcommittee on Field Operating Equipment. This document presents recom
14、mended practices for the storage, transportation, handling, installation, start-up and pulling of electrical submersible pumps and auxiliary equipment. This document includes usage of the verbs shall and should, whichever is the more appli- cable to the function. For the purpose of this document: Sh
15、all indicates the recommended practice is considered a minimum requirement that has universal applicability to the specific activity. Should indicates a recommended practice: (a) for which alternative practices may be equally safe andor effective; or, (b) which may be impractical under some circumst
16、ances or applications. API publications may be used by anyone desiring to do so. Every effort has been made by the Institute to assure the accuracy and reliability of the data contained in them. The Institute, however, makes no representation, warranty, or guarantee in connection with this publicati
17、on and hereby expressly disclaims any liability or responsibility for loss or damage resulting from its use or for the violation of any federal, state, or municipal regulation with which this publication may conict. Suggested revisions are invited and should be submitted to the director of the Upstr
18、eam Segment, American Petroleum Institute, 1220 L Street, N.W., Washington, D.C. 20005. This recommended practice shall become effective on the date printed on the cover but may be used voluntarily from the date of distribution. . 111 CONTENTS Page 1 SCOPE . 1 2 REFERENCES 1 3 TRANSPORTATION. HANDLI
19、NG AND STORAGE OF EQUIPMENT . 1 3.2 3.3 3.1 Cables . 1 Pumps. Motors. Sealing Sections. and Gas Separators . 3 Surface and Miscellaneous Equipment . 3 3.4 Storage 4 4 GENERAL SURFACE INSTALLATION . 4 4.1 General 4 4.2 Primary Service Transformers 4 4.3 Motor Control Panels, Vents, and Junction Boxes
20、 4 4.4 Surface Wiring 5 4.5 Wellheads 5 5 INSTALLATION AND PULLING EQUIPMENT 5 5.1 Well-Servicing Rigs 5 5.2 Tubing Spiders 5 5.3 Back-upTongs 6 Cable Spoolers or Reels . 6 Downhole Pump Cable Protection 6 5.6 Cable Sheave . 6 5.4 5.5 6 RUNNING EQUIPMENT INTO THE WELL . 6 6.1 EquipmentCheck 6 6.2 Ca
21、singcheck . 6 Preparation of Wellhead for Running Equipment . 7 Lifting Equipment into Running Position . 7 6.5 Cable Splicing 7 6.6 Cable Bandmg 7 Check Valves and Bleeder or Drain Valves 8 6.8 Running Practices . 8 Pump Setting Depth 8 6.1 O Wellhead Completion 8 6.3 6.4 6.7 6.9 7 START.UPPROCEDUR
22、E . 8 7.1 Pre-Start-up Procedure 8 7.2 Equipment Start-up 8 8 PULLING EQUIPMENT OUT OF WELLS . 9 8.1 HistoricalData 9 8.2 Pulling Equipment . 9 8.3 BandRemoval 9 8.4 SpoolingCable 9 8.5 Shipping Equipment . 9 V CONTENTS Page 9 FIELD EVALUATION OF USED EQUIPMENT 9 On-Site Observations and Inspections
23、 9 9.1 10 ASSESSMENT OF USED EQUIPMENT 10 10.1 Downhole Pump Cables . 10 10.2 Pumps 10 10.3 Motors . 10 10.4 SealChambers . 10 10.5 Motor Lead Extensions/Potheads 11 10.6 Electrical Feed Through Assemblies 11 10.7 Reusing Equipment . 11 Figures 14omponents of an Electrical Submersible Pumping System
24、 . 2 3-Vented Junction Box 5 2-Preparation of Cable for Transportation and Handling of Spools . 3 vi Electrical Submersible Pump Installations 1 Scope 1 .I This recommended practice covers the installation and replacement of all major components that comprise a typical, electrical submersible pumpin
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- APIRP11S31999RECOMMENDEDPRACTICEFORELECTRICALSUBMERSIBLEPUMPINSTALLATIONSSECONDEDITION 电动 潜水泵 安装 尺寸 选择

链接地址:http://www.mydoc123.com/p-399976.html