API RP 1115-1994 Recommended Practice on the Operation of Solution-Mined Underground Storage Facilities (First Edition)《地下可溶性矿存储设备的推荐作法》.pdf
《API RP 1115-1994 Recommended Practice on the Operation of Solution-Mined Underground Storage Facilities (First Edition)《地下可溶性矿存储设备的推荐作法》.pdf》由会员分享,可在线阅读,更多相关《API RP 1115-1994 Recommended Practice on the Operation of Solution-Mined Underground Storage Facilities (First Edition)《地下可溶性矿存储设备的推荐作法》.pdf(28页珍藏版)》请在麦多课文档分享上搜索。
1、Recommended Practice on the Operation of Solution-Mined Underground Storage FacilitiesAPI RECOMMENDED PRACTICE 1115FIRST EDITION, SEPTEMBER 1994REAFFIRMED, OCTOBER 2012Recommended Practice on the Operation of Solution-Mined Underground Storage FacilitiesManufacturing, Distribution and Marketing Depa
2、rtmentAPI RECOMMENDED PRACTICE 1115FIRST EDITION, SEPTEMBER 1994REAFFIRMED, OCTOBER 2012SPECIAL NOTES1. API PUBLICATIONS NECESSARILY ADDRESS PROBLEMS OF A GENERALNATURE. WITH RESPECT TO PARTICULAR CIRCUMSTANCES, LOCAL, STATE,AND FEDERAL LAWS AND REGULATIONS SHOULD BE REVIEWED.2. API IS NOT UNDERTAKI
3、NG TO MEET THE DUTIES OF EMPLOYERS, MANU-FACTURERS, OR SUPPLIERS TO WARN OR PROPERLY TRAIN AND EQUIPTHEIR EMPLOYEES, AND OTHERS EXPOSED, CONCERNING HEALTH ANDSAFETY RISKS AND PRECAUTIONS, NOR UNDERTAKING THEIR OBLIGATIONSUNDER LOCAL, STATE, OR FEDERAL LAWS.3. INFORMATION CONCERNING SAFETY AND HEALTH
4、 RISKS AND PROPERPRECAUTIONS WITH RESPECT TO PARTICULAR MATERIALS AND CONDI-TIONS SHOULD BE OBTAINED FROM THE EMPLOYER, THE MANUFACTUREROR SUPPLIER OF THAT MATERIAL, OR THE MATERIAL SAFETY DATA SHEET.4. NOTHING CONTAINED IN ANY API PUBLICATION IS TO BE CONSTRUED ASGRANTING ANY RIGHT, BY IMPLICATION
5、OR OTHERWISE, FOR THE MANU-FACTURE, SALE, OR USE OF ANY METHOD, APPARATUS, OR PRODUCTCOVERED BY LETTERS PATENT, NEITHER SHOULD ANYTHING CONTAINEDIN THE PUBLICATION BE CONSTRUED AS INSURING ANYONE AGAINSTLIABILITY FOR INFRINGEMENT OF LETTERS PATENT.5. GENERALLY, API STANDARDS ARE REVIEWED AND REVISED
6、, REAF-FIRMED, OR WITHDRAWN AT LEAST EVERY FIVE YEARS. SOMETIMES A ONE-TIME EXTENSION OF UP TO TWO YEARS WILL BE ADDED TO THIS REVIEWCYCLE. THIS PUBLICATION WILL NO LONGER BE IN EFFECT FIVE YEARSAFTER ITS PUBLICATION DATE AS AN OPERATIVE API STANDARD, ORWHERE AN EXTENSION HAS BEEN GRANTED, UPON REPU
7、BLICATION.STATUS OF THE PUBLICATION CAN BE ASCERTAINED FROM THE APIAUTHORING DEPARTMENT TELEPHONE (202) 682-8000. A CATALOG OF APIPUBLICATIONS AND MATERIALS IS PUBLISHED ANNUALLY AND UPDATEDQUARTERLY BY API, 1220 L STREET, N.W., WASHINGTON, DC 20005.Copyright 1994 American Petroleum InstituteiiiFORE
8、WORDThis standard was prepared under the auspices of the API General Committee onPipelines and provides basic guidance on the operation of solution-mined undergroundhydrocarbon liquid or liquefied gas storage facilities.API publications may be used by anyone desiring to do so. Every effort has been
9、madeby the Institute to assure the accuracy and reliability of the data contained in them; however,the Institute makes no representation, warranty, or guarantee in connection with this publi-cation and hereby expressly disclaims any liability or responsibility for loss or damageresulting from its us
10、e or for the violation of any federal, state, or municipal regulation withwhich this publication may conflict.Suggested revisions are invited and should be submitted to the director of the Manufac-turing, Distribution and Marketing Department, American Petroleum Institute, 1220 LStreet, N.W., Washin
11、gton, D.C. 20005. vCONTENTSPageSECTION 1INTRODUCTION.11.1 Scope11.2 Overview11.3 Regulatory Requirements.11.4 Referenced Publications.11.5 Definitions1SECTION 2CAVERN HYDRAULICS 32.1 General.32.2 Pressure32.2.1 Casing Seat Pressure .32.2.2 Maximum Allowable Operating Pressure.32.2.3 Minimum Allowabl
12、e Operating Pressure .32.2.4 Rate of Pressure Change .42.3 Maximum Product Injection Rate42.4 Maximum Allowable Brine Injection Rate42.5 Pressure Surges (“Water Hammer”) 42.6 Specific Gravity .42.7 Brine Saturation .4SECTION 3STORED PRODUCT FACILITIES43.1 Pumps and Compressors43.2 Product Control43.
13、3 Product Measurement 43.4 Product Conditioning.53.5 Surface Product Piping 53.6 Tubular Strings.53.7 Changing the Product Stored .53.7.1 General 53.7.2 Potential Problems Areas and Solutions .5SECTION 4BRINE FACILITIES.64.1 Salinity .64.2 Brine Sources.64.3 Brine Storage Pond 64.4 Disposal74.5 Pump
14、ing .74.6 Measurement74.7 Control .74.8 Product/Brine Separation Systems.7SECTION 5FRESH WATER FACILITIES 75.1 Source 75.2 Pumping .75.3 Measurement8SECTION 6WELLHEAD/HANGING STRING86.1 General.86.2 Planning .86.3 Safety Considerations 86.4 The Workover 86.5 Additional Tests and/or Safety Devices.86
15、.6 Cavern Protection While Out of Service .9SECTION 7CAVERN INTEGRITY TESTING ANDMISCELLANEOUS SURVEYS.97.1 Mechanical Integrity or Certification Testing97.1.1 General 97.1.2 Brine Full Hydrostatic Pressure Test.97.1.3 Nitrogen/Brine Interface Test97.2 Frequency of Testing97.3 Sonar Caliper Surveys1
16、07.4 Geophysical Logs.107.5 Elevation Surveys 107.6 Records and Reports 107.6.1 Retention .107.6.2 Reporting.10SECTION 8ENVIRONMENTAL AND REGULATORYCONSIDERATIONS .11SECTION 9SECURITY119.1 General.119.2 Area Patrol .119.3 Controlled Access 119.4 Boundary/Perimeter Control119.5 Security Plans.119.6 L
17、ocks11SECTION 10EMERGENCY PLANS.1210.1 General.1210.2 Suggested Contents1210.3 Mutual Aid Organizations12SECTION 11SAFETY AND TRAINING 1211.1 Safety Engineering Design Criteria .1211.1.1 General 1211.1.2 Cavern Safety Equipment .1211.1.3 Rotating Equipment 1411.1.4 Maintenance Access1411.2 Personnel
18、 Safety.1411.3 Contractor Safety .1411.4 Operator Training.14SECTION 12RECORDS.1512.1 General.1512.2 Design and Construction Records1512.3 Regulatory Compliance Records .1512.4 Maintenance Records.1512.4.1 Routine Maintenance 1512.4.2 Preventive Maintenance1512.5 Ongoing Operations Records.1512.6 Op
19、erations Log Book.16vi1.1 ScopeThis recommended practice provides basic guidance onthe operation of solution-mined underground hydrocarbonliquid or liquefied petroleum gas storage facilities. Thisdocument is intended for first-time cavern engineers orsupervisors, but would also be valuable to those
20、peopleexperienced in cavern operations. This recommended prac-tice is based on the accumulated knowledge and experienceof geologists, engineers, and other personnel in thepetroleum industry. All aspects of solution-mined under-ground storage operation, including cavern hydraulics, brinefacilities, w
21、ellhead and hanging strings, and cavern testingare covered. Users of this guide are reminded that no publi-cation of this type can be complete, nor can any writtendocument be substituted for effective site-specific operatingprocedures.This recommended practice does not apply to cavernsused for natur
22、al gas storage, waste disposal purposes,caverns which are mechanically mined, depleted petroleumreserve cavities, or other underground storage systems whichare not solution-mined.1.2 OverviewStorage of products in solution-mined salt caverns hasbeen utilized in the United States since the late 1940s
23、. Today,storage of hydrocarbon liquids and liquefied petroleum gasesin caverns developed in both domal and bedded salt forma-tions is utilized throughout the world.Salt caverns can act independently as long term, seasonalstorage vessels; or they may serve as short term, operationalstorage. Caverns c
24、an also be inserted into the productionplant/pipeline systems to prevent supply interruptions whenmaintenance or emergency shut downs occur or to “float” onpipelines to optimize operations.Storage of product in a salt cavern may require carefulreview to ensure that the product is compatible with the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- APIRP11151994RECOMMENDEDPRACTICEONTHEOPERATIONOFSOLUTIONMINEDUNDERGROUNDSTORAGEFACILITIESFIRSTEDITION

链接地址:http://www.mydoc123.com/p-399945.html