API BULL D16 TEMPLATE-2011 Suggested Procedure for Development of Spill Prevention Control and Countermeasure Plans - Plan Template (Fifth Edition)《泄漏预防控制和对策计划制定的建议实施规程.计划模板.第5版》.pdf
《API BULL D16 TEMPLATE-2011 Suggested Procedure for Development of Spill Prevention Control and Countermeasure Plans - Plan Template (Fifth Edition)《泄漏预防控制和对策计划制定的建议实施规程.计划模板.第5版》.pdf》由会员分享,可在线阅读,更多相关《API BULL D16 TEMPLATE-2011 Suggested Procedure for Development of Spill Prevention Control and Countermeasure Plans - Plan Template (Fifth Edition)《泄漏预防控制和对策计划制定的建议实施规程.计划模板.第5版》.pdf(88页珍藏版)》请在麦多课文档分享上搜索。
1、 Suggested Procedure for Development of a Spill Prevention Control and Countermeasure Plan Plan Template API BULLETIN D16 FIFTH EDITION, APRIL 2011 Suggested Procedure for Development of a Spill Prevention, Control, and Countermeasure (SPCC) PlanTEMPLATE API BULLETIN D-16 FIFTH EDITION, APRIL 2011 A
2、merican Petroleum Institute Developed by: OBriens Response Management Inc. 6620 Cypresswood Drive, Suite 200 Spring (Houston), Texas 77379 (281) 320-9796 SPECIAL NOTES API publications necessarily address problems of a general nature. With respect to particular circumstances, local, state, and fede
3、ral laws and regulations should be reviewed. Neither API nor any of APIs employees, subcontractors, consultants, committees, or other assignees make any warranty or representation, either express or implied, with respect to the accuracy, completeness, or usefulness of the information contained herei
4、n, or assume any liability or responsibility for any use, or the results of such use, of any information or process disclosed in this publication. Neither API nor any of APIs employees, subcontractors, consultants, or other assignees represent that use of this publication would not infringe upon pri
5、vately owned rights. API publications may be used by anyone desiring to do so. Every effort has been made by the Institute to assure the accuracy and reliability of the data contained in them; however, the Institute makes no representation, warranty, or guarantee in connection with this publication
6、and hereby expressly disclaims any liability or responsibility for loss or damage resulting from its use or for the violation of any authorities having jurisdiction with which this publication may conflict. API publications are published to facilitate the broad availability of proven, sound engineer
7、ing and operating practices. These publications are not intended to obviate the need for applying sound engineering judgment regarding when and where these publications should be utilized. The formulation and publication of API publications is not intended in any way to inhibit anyone from using any
8、 other practices. Any manufacturer marking equipment or materials in conformance with the marking requirements of an API standard is solely responsible for complying with all the applicable requirements of that standard. API does not represent, warrant, or guarantee that such products do in fact con
9、form to the applicable API standard. All rights reserved. No part of this work may be reproduced, translated, stored in a retrieval system, or transmitted by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission from the publisher. Contact the Pub
10、lisher, API Publishing Services, 1220 L Street, NW, Washington, DC 20005. Copyright 2011 American Petroleum Institute FOREWORD Nothing contained in any API publication is to be construed as granting any right, by implication or otherwise, for the manufacture, sale, or use of any method, apparatus, o
11、r product covered by letters patent. Neither should anything contained in the publication be construed as insuring anyone against liability for infringement of letters patent. Suggested revisions are invited and should be submitted to the Director of Regulatory and Scientific Affairs, API, 1220 L St
12、reet, NW, Washington, DC 20005. Facility: TEMPLATESPCC-i Date: SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN (Facility Name) (Facility Location) (Type of Facility) (Operator Name) (Address) (Address) (Owner Name; If Different Than Operator) (Address) (Address) Spill Prevention, Control, and Cou
13、ntermeasure Plan Template Facility: SPCC-ii Date: TABLE OF CONTENTS Page Table of Contents . ii Log of Plan Review and Amendments v Regulatory Cross-Reference vi Section 1 General Information 1.0 General Information. 1-1 1.1 Management Approval 1-1 1.2A Professional Engineer Certification . 1-2 1.2B
14、 Professional Engineer Certification (with Produced Water Attestation) 1-3 1.2C Tier II Qualified Facility Certification 1-4 1.2D Professional Engineer Certification of Portions of a Qualified Facilitys Self-Certified Plan . 1-5 1.2E Tier II Qualified Facility Technical Amendment . 1-6 1.3 Substanti
15、al Harm Certification (excerpt from 40 CFR Part 112 - Attachment CII) 1-7 1.4 Contact List and Phone Numbers . 1-8 1.5 Notification Data Sheet 1-8 1.6 Personnel, Training, and Discharge Prevention Procedures 1-8 1.7 Facility Layout and Diagram 1-10 1.7.1 Facility Layout 1-10 1.7.2 Facility Diagram .
16、 1-10 1.8 Prevention, Response and Cleanup 1-11 1.9 Impracticability. 1-13 1.10 Deviations to Rule . 1-14 1.11 Conformance with other Requirements . 1-15 Section 2A Onshore Facilities (Excluding Production) Information N/A 2A.1 Container and Potential Spills Table . 2A-1 2A.2 Bulk Storage Containers
17、 . 2A-2 2A.2.1 Completely and Partially Buried Tanks . 2A-2 2A.2.2 Mobile or Portable Oil Storage Containers . 2A-2 2A.2.3 Internal Heating Coils . 2A-2 2A.2.4 Fail Safe Precautions . 2A-3 2A.3 Facility Containment, Drainage and Effluent Treatment 2A-4 2A.3.1 Secondary Containment Systems 2A-4 2A.3.
18、2 Facility Diked Drainage to Surface Waters without Facility Treatment System 2A-5 2A.3.3 Facility Drainage to Effluent Treatment System . 2A-5 2A.3.4 Effluent Treatment System . 2A-5 2A.3.5 Facility Undiked Drainage to Surface Waters . 2A-5 2A.3.6 Oil Filled Equipment . 2A-6 2A.4 Facility Transfer
19、Operations, Pumping and Facility Process . 2A-6 2A.4.1 Facility Piping . 2A-6 2A.4.2 Out of Service Piping 2A-7 2A.4.3 Pipe Supports . 2A-7 2A.4.4 Vehicle Warnings 2A-7 2A.5 Facility Tank Car replacement, reconstruction, or movement of containers; reconstruction, replacements, or installation of pip
20、ing systems; construction or demolition that might alter secondary containment structures; changes of product or service; or addition/deletion of standard operation or maintenance procedures related to discharge prevention measures. It is the responsibility of the facility to determine, and confirm
21、with the regulatory authority as necessary, what constitutes a technical amendment. The rule requires a technical amendment only “when there is a change (112.5(a) that materially affects the facilitys potential to discharge oil”. An amendment made under this section will be prepared within six (6) m
22、onths of the change and implemented as soon as possible but not later than six (6) months following preparation of the amendment. Technical Amendments affecting various pages within the plan can be PE certified on those pages, certifying those amendments only, and will be documented on the log form
23、below. MANAGEMENT REVIEW Management will review this SPCC Plan at least each five (5) years and document the review on the form below (112.5(b). By signature below, signor confirms that management has completed a review and evaluation of this SPCC Plan. Review/Amend Date Signature* (Specify) Amend P
24、lan (will/will not) Description of Review/Amendment Affected Page(s) P.E. Certification (Y/N) * Typically signed by Manager, Professional Engineer or plan reviewer.Spill Prevention, Control, and Countermeasure Plan Template Facility: SPCC-vi- Onshore Date: a ONSHORE FACILITY - REGULATORY CROSS-REFER
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- APIBULLD16TEMPLATE2011SUGGESTEDPROCEDUREFORDEVELOPMENTOFSPILLPREVENTIONCONTROLANDCOUNTERMEASUREPLANSPLANTEMPLATEFIFTHEDITION

链接地址:http://www.mydoc123.com/p-399440.html