1、 2 2020 2020 18 5 8 A H 336 250022 cea_ 0531-82765943 3 1.1 2.2 3.3 4.5 5.7 5.1 关 键节 点.7 5.2 条 件验 收标 准.8 A.10 B.11 B.0.1.11 B.0.2.12 B.0.3.13 B.0.4.14 C.15 C.0.1.15 C.0.2.16 C.0.3.17 C.0.4.18 C.0.5.19 C.0.6.20 C.0.7.21 C.0.8.22 C.0.9.23 D.24 D.0.1.24 D.0.2.25 D.0.3 100.26 D.0.4.27 D.0.5.28 D.0.6.29
2、D.0.7.30 D.0.8.31 D.0.9.32 D.0.10.33 D.0.11.34 E.35 E.0.1.35 E.0.2.36 4 E.0.3.37 F.38 F.0.1.38 F.0.2.39 F.0.3.40 F.0.4.40 F.0.5.42 F.0.6.43 G.44 G.44 H.45 H.45.46.47 条 文 说 明.48 5 Contents 1 General Provisions.1 2 Terms.2 3 Procedures of condition acceptance.3 4 Implementation requirements of conditi
3、on acceptance.5 5 Key nodes and criteria of condition acceptance.7 5.1 Key nodes.7 5.2 Criteria of condition acceptance.8 Appendix A Identification list of key nodes in individual sub-project.10 Appendix B Tables for key nodes pre-construction condition acceptance.11 Table B.0.1 Self-check record ta
4、ble of pre-construction conditions for key nodes.11 Table B.0.2 Pre-acceptance table of pre-construction conditions for key nodes.12 Table B.0.3 Acceptance record table of pre-construction conditions for key nodes.13 Table B.0.4 Acceptance conclusions table of pre-construction conditions for key nod
5、es.14 Appendix C Pre-constrution acceptance conditions of key point in mine tunneling project.15 Table C.0.1 Pre-construction conditional acceptance of tunneling through major risk sources and complex geologic environments.15 Table C.0.2 Conditional acceptance before excavation of shaft.16 Table C.0
6、.3 Conditional acceptance before open tunneling of connecting passage at under mining section.17 Table C.0.4 Conditional acceptance before tunneling of jiont section between inclined shaft or connecting passage and main track.18 Table C.0.5 Conditional acceptance before tunneling of sloped and expan
7、ded section(at first cycle).19 Table C.0.6 Conditional acceptance before drill-blast tunneling(at first cycle).20 Table C.0.7 Conditional acceptance before multi-pilot-tunnel buckle arch tunneling(at first time).21 Table C.0.8 Conditional acceptance before removing temporary struts at large section(
8、in first layer).22 Table C.0.9 Conditional acceptance before entire-section grouting(at first time).23 Appendix D Pre-constrution acceptance conditions of key point in shield tunneling project.24 Table D.0.1 Conditional acceptance before hoisting of shield tunneling machine(STM).24 Table D.0.2 Condi
9、tional acceptance before STMs launch and receival.25 Table D.0.3 Conditional acceptance before shield tunneling up to the first 100th ring.26 6 Table D.0.4 Conditional acceptance before the construction of free sections of STM.27 Table D.0.5 Conditional acceptance before opening STMs chamber.28 Tabl
10、e D.0.6 Conditional acceptance before open tunneling of connecting passage at shield tunneling section.29 Table D.0.7 Conditional acceptance before shield tunneling through major risk sources and complex geologic environments.30 Table D.0.8 Conditional acceptance before shield tunneling of adjacent
11、section.31 Table D.0.9 Conditional acceptance before shield tunneling of crossing-over section.32 Table D.0.10 Conditional acceptance before excavation in freezing method.33 Table D.0.11 Conditional acceptance before pipe-jacking machine s launch and receival.34 Appendix E Pre-constrution acceptance
12、 conditions of key nodes in excavation in cut-and-cover and cover-excavation methods.35 Table E.0.1 Conditional acceptance before cut-and-cover deep excavation.35 Table E.0.2 Conditions,entities and key points of acceptance before deep excavation in cover-excavation method.36 Table E.0.3 Conditional
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DB37 5198-2021 地下工程关键节点施工前条件验收标准 5198 2021 地下工程 关键 节点 施工 条件 验收 标准