1、ACCA考试 P5高级业绩管理真题 2014年 12月及答案解析(总分:110.03,做题时间:180 分钟)一、Section A This ONE(总题数:1,分数:50.00)Boltzman Machines (Boltzman) is a listed, multinational engineering business. It has two divisions, one manufacturing aerospace parts and the other automotive parts. The company is known for innovation and it
2、allows its managers much autonomy to run their own divisions and projects. There has been recent criticism at a shareholders meeting of the executive management for not listening to shareholders concerns and allowing this autonomy to run out of control. Therefore, the board at Boltzman have decided
3、to create a framework which brings together all of the initiatives described below. The chief executive officer (CEO) feels that the performance prism may be a suitable model and has asked you to draft a report to the board to explain the model and how Boltzmans existing initiatives fit within it. T
4、he initiatives which are running at present are: 1. An analysis of stakeholder influence at Boltzman leading to suitable strategic performance measures. 2. A benchmarking exercise of the performance measures from initiative 1 with Boltzmans main competitor,General Machines. 3. The introduction of qu
5、ality initiatives bringing lean production methods to Boltzman. The CEO also requires your input on each of these initiatives as they are all at various stages of progress: First, a stakeholder analysis has been completed by one of Boltzmans managers (in Appendix 1) but she has gone on holiday and h
6、as not written up a commentary of her results. Therefore, the CEO wants you to take the information in Appendix 1 and explain the results and evaluate the suggested performance measures. The CEO has asked that you do not, at this stage, suggest long lists of additional indicators. Second, the CEO wa
7、nts you to use these suggested measures to benchmark the performance of Boltzman against General Machines. The CEO stated, Make sure that you calculate the measures given in Appendix 1. You should also add two justified measures of your own using the data provided. However, restrict yourself to thes
8、e seven measures and dont drown us with detail about individual business units. A junior analyst has gathered data to use in the benchmarking exercise in Appendix 2. Third, the company has stated that one of its strategic aims is to be the highest quality supplier in the market place. In order to ac
9、hieve this, the head of the aerospace division has already started a project to implement just-in-time (JIT) manufacturing. An extract of his email proposing this change is given in Appendix 3. The CEO feels that there are some important elements hinted at but not developed in this email. In particu
10、lar, the CEO wants you to explain the problems of moving to JIT manufacturing. Required: Prepare a report to the board of Boltzman to:(分数:50.00)(1).(i) Explain the facets of the performance prism and discuss how the three initiatives relate to the facets.(9 marks)(分数:12.50)_(2).(ii) Briefly justify
11、appropriate management approaches to each of the stakeholders and, based on this analysis,evaluate the appropriateness of the performance measures suggested in Appendix 1.(14 marks)(分数:12.50)_(3).(iii) Benchmark Boltzman against General Machines as suggested by the CEO, evaluating the approach to be
12、nchmarking used.(16 marks)(分数:12.50)_(4).(iv) Explain the problems which will accompany a move towards just-in-time manufacturing at Boltzman.(7 marks) Professional marks will be awarded for the format, style and structure of the discussion of your answer.(4 marks)(分数:12.50)_二、*(总题数:1,分数:0.00)三、Sect
13、ion B TWO ques(总题数:3,分数:60.00)Beeshire Local Authority (BLA) is a local government body which provides a range of services for the area of Beeshire within the country of Seeland. Beeshire is a wealthy area within the country with many tourist attractions. One of BLAs tasks is to ensure that waste is
14、 collected from the homes and businesses in Beeshire. The goal for BLAs waste management department is to maintain Beeshire as a safe, clean and environmentally friendly place where people and businesses want to both stay in and return to. The need for waste collection is linked to public health con
15、cerns, the desire to keep the streets clean and attractive and the desire to increase the amount of rubbish which is recycled. BLA is funded through a single local tax and does not charge its residents or businesses separately for most of its services, including waste collection. There is no public
16、or political appetite for outsourcing services such as waste management. Waste collection is performed by the workforce using a fleet of vehicles. The waste is either taken to recycling plants or else to landfill sites for burying. BLA obtains revenues from all the recycled waste but this only just
17、covers the cost of running the recycling facilities. Against a background estimate that waste will increase by 1% p.a. in the future, the national government has ordered local authorities, such as BLA, to promote the recycling of waste and has set a target of 40% of all waste to be recycled by 2015.
18、 In order to discourage the creation of non-recyclable waste, the government has imposed a levy per tonne of waste buried in landfill sites and has stated that this levy will rise over the next five years in order to encourage continuing improvement in the amount of recycled waste. Currently, Seelan
19、d is in a long recession and so local authority revenues have fallen as tax revenues reflect the poor state of the economy. Along with other local authorities, BLA has tried to cut costs and so has focused on financial measures of performance. In a recent, private meeting, the chief executive of BLA
20、 was heard to say keep costs under control and we will worry about quality of service only when complaint levels build to an unacceptable level. As one of the areas largest employers, cutting staff numbers has been very difficult for BLA due to the impact on the local economy and the reaction of the
21、 residents. The current performance indicators used at BLA are drawn from the existing information systems with national figures given for comparison. Those relating to waste collection for the year ending 31 March 2014 are: (分数:20.01)(1).(a) Explain why non-financial indicators are particularly use
22、ful for public sector organisations, illustrating your answer with brief examples relevant to BLA.(6 marks)(分数:6.67)_(2).(b) Explain how the value for money provision of waste services by BLA should be assessed by suggesting and calculating justified performance indicators using the information in t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ACCA 考试 P5 高级 业绩 管理 2014 12 答案 解析 DOC