【计算机类职业资格】PMP资格认证考试-项目进度管理及答案解析.doc
《【计算机类职业资格】PMP资格认证考试-项目进度管理及答案解析.doc》由会员分享,可在线阅读,更多相关《【计算机类职业资格】PMP资格认证考试-项目进度管理及答案解析.doc(20页珍藏版)》请在麦多课文档分享上搜索。
1、PMP 资格认证考试-项目进度管理及答案解析(总分:50.00,做题时间:90 分钟)一、B单项选择题/B(总题数:50,分数:50.00)1.You got news that because of bad weather, your shipment has got delayed by 2 weeks。What should be the first step that you take?(分数:1.00)A.Fast track the project to ensure that the project schedule is not delayeB.Review the perfo
2、rmance reports to determine which planned dates have not been met, and the impact on critical patC.Try to get additional supplies from an alternate location as soon as possiblD.Take corrective action to minimize the impact because of the dela2.Critical chain is a schedule network analysis technique
3、that modifies the project schedule to account for limited resources. Critical chain combines deterministic and probabilistic approaches. Initially, the project schedule network diagram is build using non-conservative estimates for activity durations within the schedule model, with required dependenc
4、ies and defined constraints as inputs. The critical path is then calculated. After the critical path is identified, resource availability is entered and the resource-limited schedule result is determined. The resulting schedule often has an altered critical path. The critical chain method adds non-w
5、ork schedule activities to maintain focus on the planned activity durations, also referred to as _ .(分数:1.00)A.duration buffersB.resource levelingC.reverse resource levelingD.crashing3.A project schedule completion date will change if _ .(分数:1.00)A.the critical path is reducedB.the contingency is no
6、 longer availableC.no float time is availableD.project resources are reduced4.The critical path is established by calculating the following dates:(分数:1.00)A.Start-to-start, start-to-finish, finish-to-finish, finish-to-starB.Early start, early finish, late start, late finisC.Predecessor-to-successor,
7、 predecessor-to-predecessor, successor-to-successoD.Primary-to-secondary, primary-to-finish, secondary-to-secondary, finish-to-finis5.Activities that are related and shown as a single, aggregate activity reported at a summary level are called _ .(分数:1.00)A.master scheduleB.hammockC.WBSD.hanger6.Whic
8、h of the following techniques is used to control the project schedule?(分数:1.00)A.Pareto diagraB.Performance measuremenC.Parametric modelinD.Statistical samplin7.The Precedence Diagramming Method provides project managers with knowledge of _ .(分数:1.00)A.all levels of the work breakdown structureB.act
9、ivities likely to be involved in the project integration and resource allocation functionsC.a graphical representation of interdependencies of activitiesD.the project completion date8.If the number of critical paths in the project increases, but the duration of the project remains same, what is the
10、impact on the project?(分数:1.00)A.Crashing will be required to complete project on timB.Fast tracking will be required to complete project on timC.Risk of the project increaseD.None of the abov9.You work for an architectural-engineering firm and are responsible for designing the worlds most advanced
11、chicken coop. The project is highly complex and will require hundreds of drawings. You multiply the number of drawing by the hours needed to produce each drawing to estimate how long the coop will take to design. This results in which one of the following estimate types?(分数:1.00)A.Quantitatively bas
12、eB.ExperC.AnalogouD.Parametri10.Your project is behind schedule due to conflict between team members. Having resolved the conflict, to get the project back on schedule, you should consider _ .(分数:1.00)A.crashing the scheduleB.performing resource levelingC.conducting reverse resource allocation sched
13、ulingD.utilizing the critical chair resources11.The objective of fast tracking a project is to _ 。(分数:1.00)A.increase productivityB.reduce project durationC.increase schedule tracking controlsD.reduce project risks12.If you are calculating one early start and early finish for each task, you are usin
14、g _ (choose the best answer).(分数:1.00)A.PERTB.CPMC.GERTD.PDM13.All the following are advantages of GERT(graphical evaluation and review techniques)as compared with PERT(project evaluation and review technique)EXCEPT _ .(分数:1.00)A.allows loopingB.allows for dummy tasksC.allows branchingD.allows multi
15、ple project end results14.Your schedule analysis has shown that your project has a high likelihood of experiencing a schedule overrun. You know this because the cumulative EV is much _ .(分数:1.00)A.higher than the cumulative ACB.higher than the cumulative PVC.lower than the cumulative PVD.lower than
16、the cumulative CPI15.You have taken information on project scope and resources and then developed durations for input to schedules. Since there was very limited information about the project, you used actual duration of a previous, similar activity as the basis for estimating future activity. What w
17、ill be a next step after this activity?(分数:1.00)A.Using diagramming techniques like GERT and systems dynamicB.Calculating theoretical early and late start and finish dates for all project activitieC.Using standardized networks to expedite preparation of project network diagramD.Subdividing project w
18、ork packages into smaller more manageable components for better management contro16.All of the following are true about resource leveling EXCEPT:(分数:1.00)A.Can be used to keep selected resource usage at a constant level during specific time periodB.Often results in a projected duration for the proje
19、ct that is longer than the preliminary project schedulC.Is sometimes called the resource-based methoD.Is used to develop a meaningful WB17.Resource calendars affect a specific resource or category of resources. They reflect how some resources work only during normal business hours, while others work
20、 three full shifts, or a project team member might be unavailable, such as on vacation or in a training program, or a labor contract can limit certain workers to certain days of the week. Resource calendars are valuable inputs for _ .(分数:1.00)A.developing an approximation of the costs of the resourc
21、es needed to complete each schedule activityB.aggregating the estimated costs of individual schedule activities or work packages to establish a total cost baseline for project performanceC.searching the cause of positive and negative variances as part of integrated change control processD.assuring t
22、hat potential cost overruns do not exceed the authorized funding periodically and in total for the project18.All the following statements regarding creating of time estimates are correct EXCEPT:(分数:1.00)A.Mathematical analysis like CPM, GERT and PERT indicate the dates in which the activity can be s
23、cheduled given resource limits and other constraintB.Duration compression techniques including fast tracking and crashing can help in decreasing the project schedulC.WBS classification allows for useful activity ordering and sortinD.The duration of the project is the sum of durations for all the tas
24、ks in the projec19.In your project, you are using most likely. optimistic and pessimistic activity duration estimates(for activity duration estimating). The technique that you are using is _ .(分数:1.00)A.PERTB.CPMC.parametric estimatingD.none of the above20.A planning package is a _ .(分数:1.00)A.unit
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 计算机 职业资格 PMP 资格 认证 考试 项目 进度 管理 答案 解析 DOC