ISO 1920-1-2004 Testing of concrete - Part 1 Sampling of fresh concrete《混凝土试验 第1部分 新浇混凝土的取样》.pdf
《ISO 1920-1-2004 Testing of concrete - Part 1 Sampling of fresh concrete《混凝土试验 第1部分 新浇混凝土的取样》.pdf》由会员分享,可在线阅读,更多相关《ISO 1920-1-2004 Testing of concrete - Part 1 Sampling of fresh concrete《混凝土试验 第1部分 新浇混凝土的取样》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、 Reference number ISO 1920-1:2004(E) ISO 2004INTERNATIONAL STANDARD ISO 1920-1 First edition 2004-06-15 Testing of concrete Part 1: Sampling of fresh concrete Essais du bton Partie 1: chantillonnage du bton frais ISO 1920-1:2004(E) PDF disclaimer This PDF file may contain embedded typefaces. In acco
2、rdance with Adobes licensing policy, this file may be printed or viewed but shall not be edited unless the typefaces which are embedded are licensed to and installed on the computer performing the editing. In downloading this file, parties accept therein the responsibility of not infringing Adobes l
3、icensing policy. The ISO Central Secretariat accepts no liability in this area. Adobe is a trademark of Adobe Systems Incorporated. Details of the software products used to create this PDF file can be found in the General Info relative to the file; the PDF-creation parameters were optimized for prin
4、ting. Every care has been taken to ensure that the file is suitable for use by ISO member bodies. In the unlikely event that a problem relating to it is found, please inform the Central Secretariat at the address given below. ISO 2004 All rights reserved. Unless otherwise specified, no part of this
5、publication may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm, without permission in writing from either ISO at the address below or ISOs member body in the country of the requester. ISO copyright office Case postale 56 CH-1211
6、Geneva 20 Tel. + 41 22 749 01 11 Fax + 41 22 749 09 47 E-mail copyrightiso.org Web www.iso.org Published in Switzerland ii ISO 2004 All rights reservedISO 1920-1:2004(E) ISO 2004 All rights reserved iiiForeword ISO (the International Organization for Standardization) is a worldwide federation of nat
7、ional standards bodies (ISO member bodies). The work of preparing International Standards is normally carried out through ISO technical committees. Each member body interested in a subject for which a technical committee has been established has the right to be represented on that committee. Interna
8、tional organizations, governmental and non-governmental, in liaison with ISO, also take part in the work. ISO collaborates closely with the International Electrotechnical Commission (IEC) on all matters of electrotechnical standardization. International Standards are drafted in accordance with the r
9、ules given in the ISO/IEC Directives, Part 2. The main task of technical committees is to prepare International Standards. Draft International Standards adopted by the technical committees are circulated to the member bodies for voting. Publication as an International Standard requires approval by a
10、t least 75 % of the member bodies casting a vote. Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. ISO shall not be held responsible for identifying any or all such patent rights. ISO 1920-1 was prepared by Technical Committee ISO/
11、TC 71, Concrete, reinforced concrete and pre- stressed concrete, Subcommittee SC 1, Test methods for concrete. This first edition of ISO 1920-1 cancels and replaces ISO 2736-1:1986, Concrete tests Test specimens Part 1: Sampling of fresh concrete. ISO 1920 consists of the following parts under the g
12、eneral title Testing of concrete: Part 1: Sampling of fresh concrete Part 2: Properties of fresh concrete Part 3: Making and curing test specimens Part 4: Strength of hardened concrete Part 5: Properties of hardened concrete other than strength Part 6: Sampling, preparing and testing concrete cores
13、Part 7: Non-destructive tests on hardened concrete INTERNATIONAL STANDARD ISO 1920-1:2004(E) ISO 2004 All rights reserved 1Testing of concrete Part 1: Sampling of fresh concrete WARNING When cement is mixed with water, alkali is released. When sampling, prevent skin contact with wet cement or concre
14、te by wearing suitable protective clothing (gloves, footwear, safety glasses). If wet cement or concrete enters the eye, immediately wash it out thoroughly with clean water and seek medical treatment without delay. Wash wet concrete off the skin immediately. 1 Scope This part of ISO 1920 specifies p
15、rocedures for the sampling of fresh concrete. The samples are used for the testing of properties of fresh concrete, or for making test specimens to determine the properties of hardened concrete. NOTE ISO 1920-1 specifies the properties of fresh concrete and ISO 1920-3 gives the procedures for making
16、 and curing test specimens. 2 Normative references The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies
17、. ISO 1920-2, Testing of concrete Part 2: Properties of fresh concrete ISO 1920-3, Testing of concrete Part 3: Making and curing test specimens ISO 1920-4, Testing of concrete Part 4: Strength of hardened concrete 3 Terms and definitions For the purpose of this document, the following terms and defi
18、nitions apply. 3.1 batch quantity of concrete, mixed in one cycle of operation of a batch mixer, or the quantity of concrete conveyed ready-mixed in a vehicle, or the quantity discharged over 1 min from a continuous mixer 3.2 composite sample quantity of concrete consisting of a number of increments
19、, distributed through a batch or mass of concrete, which are thoroughly mixed together 3.3 spot sample quantity of concrete taken from part of a batch or mass of concrete, consisting of one or more increments that are thoroughly mixed together ISO 1920-1:2004(E) 2 ISO 2004 All rights reserved3.4 inc
20、rement quantity of concrete taken by the single operation of a scoop 4 Principle 4.1 Taking a composite sample Concrete is sampled from a stream of moving concrete or from a pile in a series of increments according to 6.2. These increments are then thoroughly mixed together. 4.2 Taking a spot sample
21、 Concrete is sampled from a stream of moving concrete or from a pile at a single point. Spot samples are not representative of the batch and should not be used to manufacture strength specimens. 5 Apparatus 5.1 Scoop, made from non-absorbent material not readily attacked by cement paste, with a size
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ISO192012004TESTINGOFCONCRETEPART1SAMPLINGOFFRESHCONCRETE 混凝土 试验 部分 取样 PDF

链接地址:http://www.mydoc123.com/p-1252123.html