ISO 17666-2016 Space systems - Risk management《航空航天系统 风险管理》.pdf
《ISO 17666-2016 Space systems - Risk management《航空航天系统 风险管理》.pdf》由会员分享,可在线阅读,更多相关《ISO 17666-2016 Space systems - Risk management《航空航天系统 风险管理》.pdf(28页珍藏版)》请在麦多课文档分享上搜索。
1、 ISO 2016 Space systems Risk management Systmes spatiaux Management des risques INTERNATIONAL STANDARD ISO 17666 Second edition 2016-11-15 Reference number ISO 17666:2016(E) ISO 17666:2016(E)ii ISO 2016 All rights reserved COPYRIGHT PROTECTED DOCUMENT ISO 2016, Published in Switzerland All rights re
2、served. Unless otherwise specified, no part of this publication may be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying, or posting on the internet or an intranet, without prior written permission. Permission can be requested from either
3、ISO at the address below or ISOs member body in the country of the requester. ISO copyright office Ch. de Blandonnet 8 CP 401 CH-1214 Vernier, Geneva, Switzerland Tel. +41 22 749 01 11 Fax +41 22 749 09 47 copyrightiso.org www.iso.org ISO 17666:2016(E)Foreword iv Introduction v 1 Scope . 1 2 Normati
4、ve references 1 3 T erms, definitions and abbr e viat ed t erms 1 3.1 Terms and definitions . 1 4 A bbr e viat ed t erms 3 5 Principles of risk management . 3 5.1 Risk management concept 3 5.2 Risk management process 3 5.3 Risk management implementation into a project 3 5.4 Risk management documenta
5、tion . 4 6 The risk management process . 4 6.1 Overview of the risk management process 4 6.2 Risk management steps and tasks . 6 6.2.1 Step 1: Define risk management implementation requirements. 6 6.2.2 Step 2: Identify and assess the risks . 9 6.2.3 Step 3: Decide and act . 9 6.2.4 Step 4: Monitor,
6、 communicate, and accept risks .10 7 Risk management implementation .11 7.1 General considerations .11 7.2 Responsibilities .11 7.3 Project life cycle considerations 12 7.4 Risk visibility and decision making 12 7.5 Documentation of risk management.12 8 Risk management requirements 13 8.1 General 13
7、 8.2 Risk management process requirements .13 8.3 Risk management implementation requirements 15 Annex A (informative) Risk register example and ranked risk log example .16 Annex B (informative) Risk management plan (DRD) 18 Bibliogr aph y .20 ISO 2016 All rights reserved iii Contents Page ISO 17666
8、:2016(E) Foreword ISO (the International Organization for Standardization) is a worldwide federation of national standards bodies (ISO member bodies). The work of preparing International Standards is normally carried out through ISO technical committees. Each member body interested in a subject for
9、which a technical committee has been established has the right to be represented on that committee. International organizations, governmental and non-governmental, in liaison with ISO, also take part in the work. ISO collaborates closely with the International Electrotechnical Commission (IEC) on al
10、l matters of electrotechnical standardization. The procedures used to develop this document and those intended for its further maintenance are described in the ISO/IEC Directives, Part 1. In particular the different approval criteria needed for the different types of ISO documents should be noted. T
11、his document was drafted in accordance with the editorial rules of the ISO/IEC Directives, Part 2 (see www.iso.org/directives). Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. ISO shall not be held responsible for identifying any
12、or all such patent rights. Details of any patent rights identified during the development of the document will be in the Introduction and/or on the ISO list of patent declarations received (see www.iso.org/patents). Any trade name used in this document is information given for the convenience of use
13、rs and does not constitute an endorsement. For an explanation on the meaning of ISO specific terms and expressions related to conformit y assessment, as well as information about ISOs adherence to the World Trade Organization (WTO) principles in the Technical Barriers to Trade (TBT) see the followin
14、g URL: www.iso.org/iso/foreword.html. The committee responsible for this document is ISO/TC 20, Aircraft and space vehicles, Subcommittee SC 14, Space systems and operations. This second edition cancels and replaces the first edition (ISO 17666:2003), of which it constitutes a minor revision. Annex
15、B has been added in this edition and contains a DRD for consideration when preparing the risk management plan.iv ISO 2016 All rights reserved ISO 17666:2016(E) Introduction Risks are a threat to the project success because they have negative effects on the project cost, schedule and technical perfor
16、mance, but appropriate practices of controlling risks can also present new opportunities with positive impact. The objective of project risk management is to identify, assess, reduce, accept, and control space project risks in a systematic, proactive, comprehensive, and cost-effective manner, taking
17、 into account the projects technical and programmatic constraints. Risk is considered tradable against the conventional known project resources within the management, programmatic (e.g. cost, schedule), and technical (e.g. mass, power, dependability, safety) domains. The overall risk management in a
18、 project is an iterative process throughout the project life cycle, with iterations being determined by the project progress through the different project phases, and by changes to a given project baseline influencing project resources. Risk management is implemented at each level of the customer-su
19、pplier network. Known project practices for dealing with project risks, such as system and engineering analyses, analyses of safety, critical items, dependability, critical path, and cost, are an integral part of project risk management. Ranking of risks according to their criticality for the projec
20、t success, allowing management attention to be directed to the essential issues, is a major objective of risk management. The project actors agree on the extent of the risk management to be implemented into a given project depending on the project definition and characterization. ISO 2016 All rights
21、 reserved v Space systems Risk management 1 Scope This document defines, extending the requirements of ISO 14300-1, the principles and requirements for integrated risk management on a space project. It explains what is needed to implement a project- integrated risk management policy by any project a
22、ctor, at any level (i.e. customer, first-level supplier, or lower-level suppliers). This document contains a summary of the general risk management process, which is subdivided into four (4) basic steps and nine (9) tasks. The implementation can be tailored to project-specific conditions. The risk m
23、anagement process requires information exchange among all project domains and provides visibility over risks, with a ranking according to their criticality for the project; these risks are monitored and controlled according to the rules defined for the domains to which they belong. The fields of app
24、lication of this document are all the space project phases. A definition of project phasing is given in ISO 14300-1. When viewed from the perspective of a specific programme or project context, the requirements defined in this document are tailored to match the genuine requirements of a particular p
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ISO176662016SPACESYSTEMSRISKMANAGEMENT 航空航天 系统 风险 管理 PDF

链接地址:http://www.mydoc123.com/p-1251877.html