ISO 12239-2010 Smoke alarms using scattered light transmitted light or ionization《利用散射光 透射光或离子化的烟雾报警器》.pdf
《ISO 12239-2010 Smoke alarms using scattered light transmitted light or ionization《利用散射光 透射光或离子化的烟雾报警器》.pdf》由会员分享,可在线阅读,更多相关《ISO 12239-2010 Smoke alarms using scattered light transmitted light or ionization《利用散射光 透射光或离子化的烟雾报警器》.pdf(66页珍藏版)》请在麦多课文档分享上搜索。
1、 Reference number ISO 12239:2010(E) ISO 2010INTERNATIONAL STANDARD ISO 12239 Second edition 2010-12-15 Smoke alarms using scattered light, transmitted light or ionization Dtecteurs de fume lumire disperse, lumire transmise ou ionisation ISO 12239:2010(E) PDF disclaimer This PDF file may contain embe
2、dded typefaces. In accordance with Adobes licensing policy, this file may be printed or viewed but shall not be edited unless the typefaces which are embedded are licensed to and installed on the computer performing the editing. In downloading this file, parties accept therein the responsibility of
3、not infringing Adobes licensing policy. The ISO Central Secretariat accepts no liability in this area. Adobe is a trademark of Adobe Systems Incorporated. Details of the software products used to create this PDF file can be found in the General Info relative to the file; the PDF-creation parameters
4、were optimized for printing. Every care has been taken to ensure that the file is suitable for use by ISO member bodies. In the unlikely event that a problem relating to it is found, please inform the Central Secretariat at the address given below. COPYRIGHT PROTECTED DOCUMENT ISO 2010 All rights re
5、served. Unless otherwise specified, no part of this publication may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm, without permission in writing from either ISO at the address below or ISOs member body in the country of the requ
6、ester. ISO copyright office Case postale 56 CH-1211 Geneva 20 Tel. + 41 22 749 01 11 Fax + 41 22 749 09 47 E-mail copyrightiso.org Web www.iso.org Published in Switzerland ii ISO 2010 All rights reservedISO 12239:2010(E) ISO 2010 All rights reserved iiiContents Page Foreword .v Introductionvi 1 Scop
7、e1 2 Normative references1 3 Terms and definitions .2 4 General requirements .4 4.1 Compliance 4 4.2 Alarm condition .4 4.3 Mains-on visual indicator .5 4.4 Fault condition visual indicator Optional function5 4.5 Smoke alarm signals.5 4.6 Test facility.5 4.7 Means of calibration5 4.8 User-replaceabl
8、e components .5 4.9 Primary power source.5 4.10 Secondary power source6 4.11 Battery connections6 4.12 User-replaceable battery.7 4.13 Electrical safety .7 4.14 Connection of external ancillary devices7 4.15 Terminals for external conductors 7 4.16 Protection against the ingress of foreign bodies 7
9、4.17 Interconnectable smoke alarms Optional function .8 4.18 Alarm-silence facility Optional function.8 4.19 Radioactive material in type B smoke alarms 8 4.20 Smoke alarms with voice Optional function 8 4.21 Marking.9 4.22 Data.10 4.23 Additional requirements for software controlled smoke alarms11
10、5 Tests .12 5.1 General .12 5.2 Directional dependence16 5.3 Initial sensitivity.16 5.4 Repeatability 16 5.5 Air movement.17 5.6 Dazzling 17 5.7 Dry heat (operational) .18 5.8 Cold (operational)19 5.9 Damp heat (operational) .20 5.10 Sulfur dioxide (SO 2 ) corrosion 21 5.11 Impact (operational) 22 5
11、.12 Vibration, sinusoidal (operational) 23 5.13 Vibration, sinusoidal (endurance) .24 5.14 Extended temperature (operational) Optional function25 5.15 Electromagnetic compatibility (EMC) immunity tests (operational) 25 5.16 Fire sensitivity .26 5.17 Battery-low condition27 5.18 85 dBA Sound output O
12、ptional function 28 5.19 70 dBA Sound output Optional function 29 ISO 12239:2010(E) iv ISO 2010 All rights reserved5.20 Sounder durability 30 5.21 Interconnectable smoke alarms 31 5.22 Alarm-silence facility 32 5.23 Variation in supply voltage 32 5.24 Polarity reversal 33 5.25 Secondary power source
13、 . 34 5.26 Electrical safety. 34 5.27 Sequence timing for smoke alarms with voice 35 6 Test report . 36 Annex A (normative) Smoke tunnel for response-threshold value measurement 37 Annex B (normative) Test aerosol for response threshold value measurements 38 Annex C (normative) Smoke-measuring instr
14、uments 39 Annex D (normative) Apparatus for dazzling test. 43 Annex E (normative) Apparatus for impact test . 44 Annex F (normative) Fire test room . 46 Annex G (normative) Smouldering pyrolysis wood fire (TF2). 48 Annex H (normative) Glowing smouldering cotton fire (TF3) . 51 Annex I (normative) Fl
15、aming plastics (polyurethane) fire (TF4) 53 Annex J (normative) Flaming liquid (n-heptane) fire (TF5) 55 Annex K (informative) Information concerning the construction of the smoke tunnel 56 Annex L (informative) Information concerning the construction of the measuring ionization chamber. 58 ISO 1223
16、9:2010(E) ISO 2010 All rights reserved vForeword ISO (the International Organization for Standardization) is a worldwide federation of national standards bodies (ISO member bodies). The work of preparing International Standards is normally carried out through ISO technical committees. Each member bo
17、dy interested in a subject for which a technical committee has been established has the right to be represented on that committee. International organizations, governmental and non-governmental, in liaison with ISO, also take part in the work. ISO collaborates closely with the International Electrot
18、echnical Commission (IEC) on all matters of electrotechnical standardization. International Standards are drafted in accordance with the rules given in the ISO/IEC Directives, Part 2. The main task of technical committees is to prepare International Standards. Draft International Standards adopted b
19、y the technical committees are circulated to the member bodies for voting. Publication as an International Standard requires approval by at least 75 % of the member bodies casting a vote. Attention is drawn to the possibility that some of the elements of this document may be the subject of patent ri
20、ghts. ISO shall not be held responsible for identifying any or all such patent rights. ISO 12239 was prepared by Technical Committee ISO/TC 21, Equipment for fire protection and fire fighting, Subcommittee SC 3, Fire detection and alarm systems. This second edition cancels and replaces the first edi
21、tion (ISO 12239:2003), which has been technically revised. ISO 12239:2010(E) vi ISO 2010 All rights reservedIntroduction This International Standard for smoke alarms is drafted on the basis of functions that are to be provided on all smoke alarms covered by this standard, and optional functions with
22、 requirements which may be provided. It is intended that the options shall be used for specific applications, as recommended in application guidelines. Each optional function is included as a separate entity, with its own set of associated requirements, in order to permit smoke alarms covered by thi
23、s standard with different combinations of functions to conform to this International Standard. Two optional sound output levels are specified in this International Standard. The options allow national regulators to specify minimum sound output levels (70 dBA or 85 dBA) as required under national reg
24、ulations. Two optional sound output patterns are specified in this International Standard. The options allow national regulators to choose a sound pattern complying with ISO 8201 or ISO 7731 depending on the desired response by building occupants to an alarm condition. An optional extended temperatu
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ISO122392010SMOKEALARMSUSINGSCATTEREDLIGHTTRANSMITTEDLIGHTORIONIZATION 利用 散射 透射 离子化 烟雾 报警器 PDF

链接地址:http://www.mydoc123.com/p-1250459.html