1、Space systems Early operations Part 3: Commissioning report Systmes spatiaux Oprations initiales Partie 3: Rapport dengagement ISO 2011 Reference number ISO 10784-3:2011(E) First edition 2011-12-01 ISO 10784-3 INTERNATIONAL STANDARDISO 10784-3:2011(E)COPYRIGHT PROTECTED DOCUMENT ISO 2011 All rights
2、reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm, without permission in writing from either ISO at the address below or ISOs member body in the country of the re
3、quester. ISO copyright office Case postale 56 CH-1211 Geneva 20 Tel. + 41 22 749 01 11 Fax + 41 22 749 09 47 E-mail copyrightiso.org Web www.iso.org Published in Switzerland ii ISO 2011 All rights reservedISO 10784-3:2011(E) ISO 2011 All rights reserved iii Contents Page Foreword iv Introduction . v
4、 1 Scope 1 2 Normative references . 1 3 Terms, definitions and abbreviated terms 1 3.1 Terms and definitions . 1 3.2 Abbreviated terms . 2 4 Introduction clause of the commissioning report 2 4.1 General . 2 4.2 Overall sequence of events 2 5 Referenced documentation clause of the commissioning repor
5、t 2 5.1 General . 2 5.2 Normative references . 2 5.3 Applicable references 2 5.4 Informative references . 3 6 Nomenclature . 3 7 Objective 3 7.1 General . 3 7.2 Initialization strategy matrix . 3 8 Spacecraft configuration . 3 8.1 General . 3 8.2 Identification and general configuration matrix 3 8.3
6、 Deviations from planned initialization configuration 4 8.4 Functional configuration . 4 9 Operations facility configuration 4 9.1 General . 4 9.2 Pre-mission configuration 4 9.3 Facility constraints and limitations 4 10 Initialization description 5 10.1 General . 5 10.2 Approach and methodology . 5
7、 10.3 Sequence of events 5 10.4 Supporting analyses . 5 10.5 Input parameters, tolerances and limits . 5 10.6 Instrumentation 5 10.7 Success criteria . 5 11 Results . 5 11.1 Spacecraft initialization . 5 11.2 Mission payload initialization . 6 12 Evaluation 6 13 Deviations 6 14 Commissioning recomme
8、ndation . 6 Bibliography . 7Foreword ISO (the International Organization for Standardization) is a worldwide federation of national standards bodies (ISO member bodies). The work of preparing International Standards is normally carried out through ISO technical committees. Each member body intereste
9、d in a subject for which a technical committee has been established has the right to be represented on that committee. International organizations, governmental and non-governmental, in liaison with ISO, also take part in the work. ISO collaborates closely with the International Electrotechnical Com
10、mission (IEC) on all matters of electrotechnical standardization. International Standards are drafted in accordance with the rules given in the ISO/IEC Directives, Part 2. The main task of technical committees is to prepare International Standards. Draft International Standards adopted by the techni
11、cal committees are circulated to the member bodies for voting. Publication as an International Standard requires approval by at least 75 % of the member bodies casting a vote. Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. ISO sh
12、all not be held responsible for identifying any or all such patent rights. ISO 10784-3 was prepared by Technical Committee ISO/TC 20, Aircraft and space vehicles, Subcommittee SC 14, Space systems and operations. ISO 10784 consists of the following parts, under the general title Space systems Early
13、operations: Part 1: Spacecraft initialization and commissioning Part 2: Initialization plan Part 3: Commissioning report ISO 10784-3:2011(E)iv ISO 2011 All rights reservedIntroduction The three parts of ISO 10784 provide spacecraft (SC) manufacturers and operators with a specific form and format for
14、 writing SC commissioning reports required to configure and verify the SC to perform normal mission operations. Often, SC manufacturers and operators have defined these reports uniquely for each programme, or regional, national and corporate organizations have unique commissioning reports. The three
15、 parts of ISO 10784 aim at establishing a common language and form for SC stakeholders. The use of one form and format will simplify stakeholder understanding and comprehension of initialization and commissioning activities. ISO 10784-3:2011(E) ISO 2011 All rights reserved vINTERNATIONAL STANDARD IS
16、O 10784-3:2011(E) Space systems Early operations Part 3: Commissioning report 1 Scope A general definition of initialization is that it begins at separation of the spacecraft (SC) from the launcher. In some cases, a more exact definition will be that initialization begins in flight, upon planned cha
17、nge in mode or state of the SC from the launch configuration. Commissioning is completed when the SC, including its payload, is certified for initial mission operations. Prior to certification for mission operations, the SC is described as a test article in the three parts of ISO 10784. ISO 10784 do
18、es not include a requirement for contingency plans, but does include a statement of the need for contingency planning. This part of ISO 10784 outlines general descriptive information for SC initialization and commissioning as might be appropriate for programme management, project engineering or prog
19、ramme test documentation. Since the SC is considered a test article at this phase of its operational life, ISO 17566 is used as a normative reference in constructing the commissioning report. It provides SC manufacturers, SC operators and other stakeholders with a common language and form to verify
20、and document spacecraft initialization and commissioning prior to normal SC mission operations. 2 Normative references The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest e
21、dition of the referenced document (including any amendments) applies. ISO 10784-1, Space systems Early operations Part 1: Spacecraft initialization and commissioning ISO 17566, Space systems General test documentation 3 Terms, definitions and abbreviated terms 3.1 Terms and definitions For the purpo
22、ses of this document, the following terms and definitions apply. 3.1.1 commissioning certification of a spacecraft as ready for mission operations 3.1.2 early operations period from initialization to commissioning for mission operations 3.1.3 initialization Initial functional and operational checkou
23、t of a spacecraft following separation from the launch vehicle ISO 2011 All rights reserved 13.2 Abbreviated terms LV launch vehicle PL payload SC spacecraft 4 Introduction clause of the commissioning report 4.1 General This clause shall provide general information about the technical content of the
24、 commissioning report of interest. It shall include a brief description of the initialization sequence events. The overall initialization objective shall be described, and the criteria for SC certification shall be stated. 4.2 Overall sequence of events This subclause shall summarize the overall seq
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ISO1078432011SPACESYSTEMSEARLYOPERATIONSPART3COMMISSIONINGREPORT 航天 系统 早期 运行 部分 调试 报告 PDF

链接地址:http://www.mydoc123.com/p-1249877.html