IEEE C57 19 00 INT 1-2009 en General Requirements and Test Procedure for Power Apparatus Bushings《电力设备衬套的一般要求和试验规程用IEEE标准》.pdf
《IEEE C57 19 00 INT 1-2009 en General Requirements and Test Procedure for Power Apparatus Bushings《电力设备衬套的一般要求和试验规程用IEEE标准》.pdf》由会员分享,可在线阅读,更多相关《IEEE C57 19 00 INT 1-2009 en General Requirements and Test Procedure for Power Apparatus Bushings《电力设备衬套的一般要求和试验规程用IEEE标准》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、IEEE Std 1680-2006IEEE Standards Interpretations forIEEE Std C57.19.00 -2004IEEE Standard General Requirements and Test Procedure for Power Apparatus Bushings Copyright 2009 by the Institute of Electrical and Electronics Engineers, Inc. Three Park Avenue New York, New York 10016-5997 USA All Rights
2、Reserved.This is an interpretation of IEEE Std C57.19.00-2004. Interpretations are issued to explain and clarify the intent of a standard and are not intended to constitute an alteration to the original standard or to supply consulting information. Permission is hereby granted to download and print
3、one copy of this document. Individuals seeking permission to reproduce and/or distribute this document in its entirety or portions of this document must contact the IEEE Standards Department for the appropriate license. Use of the information contained in this document is at your own risk.IEEE Stand
4、ards Department Copyrights and Permissions 445 Hoes Lane, P. O. Box 1331 Piscataway, New Jersey 08855-1331, USAFebruary 2009 Interpretation Number 1:Topic: DC bushings IEEE Std C57.19.03-2005 limits the air side connection to 70 oC ie 30 oC above the maximum Ambient temperature of 40 oCInterpretatio
5、n Request #1 http:/standards.ieee.org/reading/ieee/interp/C57.19.00-2004.html (1 of 3) 2009/02/13 6:17:10 PMIEEE Std 1680-2006The question posed was: “Why does the DC bushings IEEE Std C57.19.03-2005 limit the air side connection to 70 oC ie 30 oC above the maximum Ambient temperature of 40 oC?“Disc
6、ussion : There was a very good discussion on the topic. It was realized that the neither the IEEE relevant standards nor the IEC ones adequately address the problem.It was thought that the limit was set low so as to not add heat to the bushing and thus not impact its thermal performance. There had b
7、een a study done in the past about the high number of DC Bushing failures and the dielectric test values were recommended to be 115%of the transformer test value.This is probably a typical struggle between the supplier who wants to get the maximum out of a bushing and the user who wants a more conse
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- IEEEC571900INT12009ENGENERALREQUIREMENTSANDTESTPROCEDUREFORPOWERAPPARATUSBUSHINGS 电力设备 衬套 一般 要求 试验 规程

链接地址:http://www.mydoc123.com/p-1249224.html