ANS 3 5-2009 Nuclear Power Plant Simulators for Use in Operator Training and Examination《操作员培训和考试时使用的核电站模拟器》.pdf
《ANS 3 5-2009 Nuclear Power Plant Simulators for Use in Operator Training and Examination《操作员培训和考试时使用的核电站模拟器》.pdf》由会员分享,可在线阅读,更多相关《ANS 3 5-2009 Nuclear Power Plant Simulators for Use in Operator Training and Examination《操作员培训和考试时使用的核电站模拟器》.pdf(33页珍藏版)》请在麦多课文档分享上搜索。
1、ANSI/ANS-3.5-2009nuclear power plant simulators for usein operator training and examinationANSI/ANS-3.5-2009ANSI/ANS-3.5-2009American National StandardNuclear Power Plant Simulators for Usein Operator Training and ExaminationSecretariatAmerican Nuclear SocietyPrepared by theAmerican Nuclear SocietyS
2、tandards CommitteeWorking Group ANS-3.5Published by theAmerican Nuclear Society555 North Kensington AvenueLa Grange Park, Illinois 60526 USAApproved September 4, 2009by theAmerican National Standards Institute, Inc.AmericanNationalStandardDesignation of this document as an American National Standard
3、 attests thatthe principles of openness and due process have been followed in the approvalprocedure and that a consensus of those directly and materially affected bythe standard has been achieved.This standard was developed under procedures of the Standards Committee ofthe American Nuclear Society;
4、these procedures are accredited by the Amer-ican National Standards Institute, Inc., as meeting the criteria for AmericanNational Standards. The consensus committee that approved the standardwas balanced to ensure that competent, concerned, and varied interests havehad an opportunity to participate.
5、An American National Standard is intended to aid industry, consumers, gov-ernmental agencies, and general interest groups. Its use is entirely voluntary.The existence of an American National Standard, in and of itself, does notpreclude anyone from manufacturing, marketing, purchasing, or using prod-
6、ucts, processes, or procedures not conforming to the standard.By publication of this standard, the American Nuclear Society does not insureanyone utilizing the standard against liability allegedly arising from or afterits use. The content of this standard reflects acceptable practice at the time ofi
7、ts approval and publication. Changes, if any, occurring through developmentsin the state of the art, may be considered at the time that the standard issubjected to periodic review. It may be reaffirmed, revised, or withdrawn atany time in accordance with established procedures. Users of this standar
8、dare cautioned to determine the validity of copies in their possession and toestablish that they are of the latest issue.The American Nuclear Society accepts no responsibility for interpretations ofthis standard made by any individual or by any ad hoc group of individuals.Requests for interpretation
9、 should be sent to the Standards Department atSociety Headquarters. Action will be taken to provide appropriate response inaccordance with established procedures that ensure consensus on theinterpretation.Comments on this standard are encouraged and should be sent to SocietyHeadquarters.Published by
10、American Nuclear Society555 North Kensington AvenueLa Grange Park, Illinois 60526 USACopyright 2009 by American Nuclear Society. All rights reserved.Any part of this standard may be quoted. Credit lines should read “Extracted fromAmerican National Standard ANSI0ANS-3.5-2009 with permission of the pu
11、blisher,the American Nuclear Society.” Reproduction prohibited under copyright conventionunless written permission is granted by the American Nuclear Society.Printed in the United States of AmericaForewordThis Foreword is not a part of the American National Standard “Nuclear Power PlantSimulators fo
12、r Use in Operator Training and Examination,” ANSI0ANS-3.5-2009.!The nuclear power industry is currently in a mature phase of operation withencouraging successes in operating license extensions. In addition to life exten-sion activity, there is renewed interest in new construction of nuclear powerpla
13、nts. This fifth revision of the 1979 original standard continues in the philos-ophy of further addressing issues related to maintaining simulators throughoutthe life of commercial nuclear power plants. This revision of the standard doesnot preclude applying the functional requirements and criteria o
14、f this standardto next-generation reactors.ThefirstANS-3.5standard,publishedinJanuary1979,providedessentialrequire-ments for the acquisition of full-scope simulators to support operator training pro-grams. The secondANS-3.5 standard, published inApril 1981, further delineatedspecification requiremen
15、ts. Improvements in testing methods and overall consis-tency were subsequently included in the thirdANS-3.5 standard, published in Oc-tober 1985. The fourth ANS-3.5 standard, published in March 1993, introduced anew testing methodology and processes that effectively integrated training pro-cesses wi
16、th simulator testing and configuration management processes. The fifthANS-3.5 standard, published inApril 1998, further refined the integration of thetraining scenario validation process with the simulator testing process.As the industry matures and performance improves, plants routinely remainonlin
17、e throughout a fuel cycle. This provides fewer operational experience oppor-tunities previously afforded to licensed operators. Excellent plant performancehas also resulted in a more vital role for the simulator in providing operatorswith experience previously obtained in the actual plant. As a resu
18、lt, the impor-tance of a thoroughly tested simulator in providing a high quality training toolcannot be overemphasized.As industry performance continues to improve, accredited operator training pro-grams become a valuable component of a comprehensive simulator test program.This standard recognizes t
19、he current synergy between the traditional simulatortesting processes and training processes that may be used to complement anoverall simulator test program. This revision also recognizes recent changes inU.S. Nuclear Regulatory Commission regulations that eliminated formal simu-lator certification
20、submittal requirements and allows applicants for an operatorlicense to meet experience eligibility requirements on the reference unit simula-tor. The advent of increased regulator and industry oversight group scrutiny ofsimulators also influences this revision. The working group provided formalinput
21、 to the regulatory process to facilitate consistent perspectives.In addition to enhanced readability accomplished by professional technical edi-tors, users of this revision will find improvements and clarifications in theperformance testing methodology, new sections addressing simulator core perfor-
22、mance testing and post-event simulator testing, and other important guidancerequired to ensure accurate simulation for operator training.When a simulator is used for operator training and examination, it is expected tomeet the requirements set forth in this standard.Acknowledgements:This review and
23、revision cycle was fortunate to receive substantial support from adiverse and dedicated group of nuclear simulator experienced professionals rep-resenting many utilities and interested parties. A wide range of utility, indepen-dent,andindustryoversightorganizationparticipation,includingindividualswi
24、thisignificant military and commercial reactor experience, was represented in thisworking group. Input to the development of the standard was received throughvarious means, such as numerous surveys with .95% industry participation aswell as feedback from training and simulator associations. Working
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ANS352009NUCLEARPOWERPLANTSIMULATORSFORUSEINOPERATORTRAININGANDEXAMINATION 操作员 培训 考试 使用 核电站 模拟器 PDF

链接地址:http://www.mydoc123.com/p-1243000.html