1、Reported by ACI Committee 503ACI 503.7-07Specification for Crack Repairby Epoxy InjectionAn ACI StandardSpecification for Crack Repair by Epoxy InjectionFirst PrintingSeptember 2007ISBN 978-0-87031-252-6American Concrete InstituteAdvancing concrete knowledgeCopyright by the American Concrete Institu
2、te, Farmington Hills, MI. All rights reserved. This materialmay not be reproduced or copied, in whole or part, in any printed, mechanical, electronic, film, or otherdistribution and storage media, without the written consent of ACI.The technical committees responsible for ACI committee reports and s
3、tandards strive to avoid ambiguities,omissions, and errors in these documents. In spite of these efforts, the users of ACI documents occasionallyfind information or requirements that may be subject to more than one interpretation or may beincomplete or incorrect. Users who have suggestions for the i
4、mprovement of ACI documents arerequested to contact ACI. Proper use of this document includes periodically checking for errata atwww.concrete.org/committees/errata.asp for the most up-to-date revisions.ACI committee documents are intended for the use of individuals who are competent to evaluate thes
5、ignificance and limitations of its content and recommendations and who will accept responsibility for theapplication of the material it contains. Individuals who use this publication in any way assume all risk andaccept total responsibility for the application and use of this information.All informa
6、tion in this publication is provided “as is” without warranty of any kind, either express or implied,including but not limited to, the implied warranties of merchantability, fitness for a particular purpose ornon-infringement.ACI and its members disclaim liability for damages of any kind, including
7、any special, indirect, incidental,or consequential damages, including without limitation, lost revenues or lost profits, which may resultfrom the use of this publication.It is the responsibility of the user of this document to establish health and safety practices appropriate tothe specific circumst
8、ances involved with its use. ACI does not make any representations with regard tohealth and safety issues and the use of this document. The user must determine the applicability of allregulatory limitations before applying the document and must comply with all applicable laws and regulations,includi
9、ng but not limited to, United States Occupational Safety and Health Administration (OSHA) healthand safety standards.Order information: ACI documents are available in print, by download, on CD-ROM, through electronicsubscription, or reprint and may be obtained by contacting ACI.Most ACI standards an
10、d committee reports are gathered together in the annually revised ACI Manual ofConcrete Practice (MCP).American Concrete Institute38800 Country Club DriveFarmington Hills, MI 48331U.S.A.Phone: 248-848-3700Fax: 248-848-3701www.concrete.orgACI 503.7-07 was adopted and published September 2007.Copyrigh
11、t 2007, American Concrete Institute.All rights reserved including rights of reproduction and use in any form or by anymeans, including the making of copies by any photo process, or by electronic ormechanical device, printed, written, or oral, or recording for sound or visual reproductionor for use i
12、n any knowledge or retrieval system or device, unless permission in writingis obtained from the copyright proprietors.503.7-1ACI Committee Reports, Guides, Standard Practices, andCommentaries are intended for guidance in planning,designing, executing, and inspecting construction. Thisdocument is int
13、ended for the use of individuals who arecompetent to evaluate the significance and limitations of itscontent and recommendations and who will acceptresponsibility for the application of the material it contains.The American Concrete Institute disclaims any and allresponsibility for the stated princi
14、ples. The Institute shall notbe liable for any loss or damage arising therefrom.Reference to this document shall not be made in contractdocuments. If items found in this document are desired by theArchitect/Engineer to be a part of the contract documents, theyshall be restated in mandatory language
15、for incorporation bythe Architect/Engineer.Specification for Crack Repair by Epoxy InjectionAn ACI StandardReported by ACI Committee 503ACI 503.7-07This Specification gives requirements for repairing cracks in concrete byinjection of two-component epoxy-resin adhesive.Keywords: adhesive; concrete; c
16、rack; epoxy; repair injection; sealer.NOTES TO SPECIFIERThis Specification is incorporated by reference in theProject Specification using the wording in Section P3 of thePreface and including information from the MandatoryRequirements, Optional Requirements, and SubmittalsChecklists following this S
17、pecification.PREFACEP1. ACI Specification 503.7 is intended to be used byreference or incorporation in its entirety in the ProjectSpecification. Do not copy individual Sections, Parts, Articles,or Paragraphs into the Project Specification, because takingthem out of context may change their meaning.P
18、2. If Sections or Parts of ACI Specification 503.7 arecopied into the Project Specification or any other document,do not refer to them as an ACI Specification, because theSpecification has been altered.P3. A statement such as the following will serve to makeACI Specification 503.7 a part of the Proj
19、ect Specification:“Work on (Project Title) shall conform to all requirementsof ACI Specification 503.7-07, “Specification for CrackRepair by Epoxy Injection,” published by the AmericanConcrete Institute, Farmington Hills, Michigan, except asmodified by these Contract Documents.”P4. Each technical Se
20、ction of ACI Specification 503.7 iswritten in the three-part Section format of the ConstructionSpecifications Institute, as adapted for ACI requirements.The language is imperative and terse.P5. The Specification is written to the Contractor. When aprovision of this Specification requires action by t
21、heContractor, the verb “shall” is used. If the Contractor isallowed to exercise an option when limited alternatives areavailable, the phrasing “eitheror” is used. Statementsprovided in the Specification as information to the Contractoruse the verbs “may” or “will.” Informational statementstypically
22、identify activities or options that “will be taken” or“may be taken” by the Owner or Architect/Engineer.Milton D. Anderson Floyd E. Dimmick, Sr. Peter Mendis W. Glenn SmoakJ. Christopher Ball Jack J. Fontana Brad Nemunaitis Joe SolomonCraig A. Ballinger Robert W. Gaul Kelly M. Page Michael M. Sprink
23、elJohn J. Bartholomew Steven H. Gebler*Federico V. Palma, Jr. D. Gerald WaltersRobert R. Cain Paul R. Hollenbach Suresh Sawant David WhiteFrank J. Constantino Bert P. Kriekemans Raymond J. Schutz Richard E. WollmershauserGlenn W. DePuy Joseph A. McElroy*Deceased.Sheerang N. NabarChairMyles A. Murray
24、Secretary503.7-2 ACI STANDARDCONTENTSSection 1General, p. 503.7-21.1Scope1.2Definitions1.3Reference standards1.4Submittals1.5Quality assurance1.6Delivery and storage of materials1.7Safety and environmental precautionsSection 2Materials, p. 503.7-42.1Surface seal2.2Injection adhesivesSection 3Executi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ACI50372007SPECIFICATIONFORCRACKREPAIRBYEPOXYINJECTION 注射 维修 裂缝 规范 PDF

链接地址:http://www.mydoc123.com/p-1242892.html