ACI 228 1R-2003 In-Place Methods to Estimate Concrete Strength《混凝土强度现地检测方法》.pdf
《ACI 228 1R-2003 In-Place Methods to Estimate Concrete Strength《混凝土强度现地检测方法》.pdf》由会员分享,可在线阅读,更多相关《ACI 228 1R-2003 In-Place Methods to Estimate Concrete Strength《混凝土强度现地检测方法》.pdf(48页珍藏版)》请在麦多课文档分享上搜索。
1、:onal“ AC1 228.1 R-03 In-Place Methods to Estimate Concrete Strength Reported by AC1 Committee 228 american concrete institute PO, BOX 9094 FARMINGTON HILLS, MICHIGAN 48333-9094 First Printing, November 2003 In-Place Methods to Estimate Concrete Strength Most AC1 Standards and committee reports are
2、gathered together in the annually revised AC1 Manual of Concrete Practice. The sev- eral volumes are arranged to group related material together and may be purchased in- dividually or in setS.The AC1 Manual of Con- Crete Practice is also available on CD-ROM. AC1 Committees prepare standards and repo
3、rts in the general areas of materials and properties of concrete, construction practices and inspection, pavements and slabs, struc- tural design and analysis, structural specifica- tions, and special products and processes. A complete catalog of all AC1 publications is avai la bl e wit hou t charge
4、. American Concrete Institute P.O. Box 9094 Farmington Hills, MI 48333-9094 AC1 Certification Programs The final quality of a concrete structure depends on qualified people to construct it. AC1 certification pro- grams identify craftsmen, technicians, and inspectors who have demonstrated their quali
5、fications. The follow- ing programs are administered by AC1 to fulfill the grow- ing demand in the industry for certified workers: Concrete Flatwork Finisher Concrete Flatwork Technician Concrete Field Testing Technician-Grade I Enhancement of AC1 Documents The technical committees responsible for A
6、C1 committee reports and standards strive to avoid ambiguities, omis- sions, and errors in these documents. In spite of these efforts, the users of AC1 documents occasionally find information or requirements that may be subject to more than one interpretation or may be incomplete or incorrect. To as
7、sist in the effort for accuracy and clarity, the Technical Activities Committee solicits the help of indi- viduals using AC1 reports and standards in identifying and eliminating problems that may be associated with Concrete Strength Testing Technician Concrete Laboratory Testing Technician-Grade I t
8、heir use. Users who have suggestions for the improvement of AC1 documents are reauested to contact the AC1 Engi- Concrete Laboratory Testing Technician-Grade il Concrete Construction Inspector Concrete Transportation Construction Inspector-ln- Training neering Department in writing, with the followi
9、ng infr- 1. Title and number of the document containing the problem and specific section in the document; 2. Concise description of the problem; 3. If possible, suggested revisions for mitigating the The Institutes Engineering Staff will review and take appropriate action on all comments and suggest
10、ions received. Members as well as nonmembers of the Insti- tute are encouraged to assist in enhancing the accuracy and usefulness of AC1 documents. Concrete Construction Inspector-ln-Training mation: Concrete Transportation Construction Inspector problem. This document may already contain reference
11、to these AC1 certification programs, which can be incorporated into project specifications or quality control procedures. If not, suggested guide specifications are available on request from the AC1 Certification Department. ISBN 0-87031-132-8 AC1 228.1 R-03 In-Place Methods to Estimate Concrete Str
12、ength Reported by AC1 Committee 228 Stephen P. Pessiki* Chair Farhad Ansari Hermenegildo Caratin Nicholas J. Carino* K. Choi Neil A. Cumrning Allen G. Davis Aldo Delahaza Ronald L. Dilly Donald E. Dixon Boris Dragunsky AI Ghorbanpoor* Frederick D. Heidbrink Bernard H. Hertlein Ka1 R. Hindo Robert S.
13、 Jenkins Keith E. Kesnert H. S. Lew Kenneth M. Lozen* Larry D. Olson John S. Popovics* Sandor Popovics Randall W. Poston* Afshin Sadri Bryce P. Sirnons Patrick J. Sullivan George V. Teodoru Woodward L. Vogt Alexander B. Zoob *Members of the task force that prepared the revision +Task force Chair. Gu
14、idance is provided on the use of methods to estimate the in-place strength of concrete in new and existing construction. The methods include: rebound number; penetration resistance, pullout, break-o8 ultrasonic pulse velocity, maturity, and cast-in-place cylinders. The principle, inherent limi- tati
15、ons, and repeatability of each method are reviewed. Procedures are presented for developing the relationship needed to estimate compressive strength from in-place results. Factors to consider in planning in-place tests are discussed, and statistical techniques to interpret test results are presented
16、. The use of in-place tests for acceptance of concrete is intm- duced. The appendix provides information on the number of strength levels that should be used to develop the strength relationship and explains a AC1 Committee Reports, Guides, Standard Practices, and Commentaries are intended for guida
17、nce in planning, designing, executing, and inspecting construction. This document is intended for the use of individuals who are competent to evaluate the significance and limitations of its content and recommendations and who will accept responsibility for the application of the material it contain
18、s. The American Concrete Institute disclaims any and ali responsibility for the stated principles. The Institute shall not be liable for any loss or damage arising therefrom. Reference to this document shall not be made in contract documents. If items found in this document are desired by the Archit
19、ecuEngineer to be a part of the contract documents, they shall be restated in mandatory language for incorporation by the ArchitecuEngineer. It is the responsibility of the user of this document to establish health and safety practices appropriate to the specific circumstances involved with its use.
20、 AC1 does not make any representations with regard to health and safety issues and the use of this document. The user must determine the applicability of all regulatory limitations before applying the document and must comply with all applicable laws and regulations, including but not limited to, Un
21、ited States Occupational Safety and Health Administration (OSHA) health and safety standards. regression analysis procedure that accounts for error in both dependent and independent variables. Keywords: coefficient of variation; compressive strength; construction; in-place tests; nondestructive test
22、s; safety; sampling; statistical analysis. CONTENTS Chapter 1-Introduction, p. 228.1 R-2 1.1-Scope 1.2-Need for in-place tests during construction 1.3-Influence of AC1 3 18 1.4-Recommendations in other AC1 documents 1.5-Existing construction 1 .6-Objective of report Chapter 2-Review of methods, p. 2
23、28.1 R-4 2.1-Introduction 2.2-Rebound number (ASTM C 805) 2.3-Penetration resistance (ASTM C 803K 803M) 2.4-Pullout test (ASTM C 900) 2.5-Break-off number (ASTM C 1150) 2.6-Ultrasonic pulse velocity (ASTM C 597) 2.7-Maturity method (ASTM C 1074) 2.8-Cast-in-place cylinders (ASTM C 873) 2.9-Strength
24、limitations 2.1Wombined methods 2.1 1-Summary AC1 228.1R-O3 supersedes AC1 228.1R-95 and became effective September 16,2003. Copyright O 2003, American Concrete Institute. All rights reserved including rights of reproduction and use in any form or by any means, including the making of copies by any
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ACI2281R2003INPLACEMETHODSTOESTIMATECONCRETESTRENGTH 混凝土 强度 现地 检测 方法 PDF

链接地址:http://www.mydoc123.com/p-1242740.html