ACI 131 1R-2014 Information Delivery Manual (IDM) for Cast-in-Place Concrete.pdf
《ACI 131 1R-2014 Information Delivery Manual (IDM) for Cast-in-Place Concrete.pdf》由会员分享,可在线阅读,更多相关《ACI 131 1R-2014 Information Delivery Manual (IDM) for Cast-in-Place Concrete.pdf(32页珍藏版)》请在麦多课文档分享上搜索。
1、Information Delivery Manual (IDM) for Cast-in-Place ConcreteReported by ACI Committee 131ACI 131.1R-14First PrintingJanuary 2015ISBN: 978-0-87031-992-1Information Delivery Manual (IDM) for Cast-in-Place ConcreteCopyright by the American Concrete Institute, Farmington Hills, MI. All rights reserved.
2、This material may not be reproduced or copied, in whole or part, in any printed, mechanical, electronic, film, or other distribution and storage media, without the written consent of ACI.The technical committees responsible for ACI committee reports and standards strive to avoid ambiguities, omissio
3、ns, and errors in these documents. In spite of these efforts, the users of ACI documents occasionally find information or requirements that may be subject to more than one interpretation or may be incomplete or incorrect. Users who have suggestions for the improvement of ACI documents are requested
4、to contact ACI via the errata website at http:/concrete.org/Publications/DocumentErrata.aspx. Proper use of this document includes periodically checking for errata for the most up-to-date revisions.ACI committee documents are intended for the use of individuals who are competent to evaluate the sign
5、ificance and limitations of its content and recommendations and who will accept responsibility for the application of the material it contains. Individuals who use this publication in any way assume all risk and accept total responsibility for the application and use of this information.All informat
6、ion in this publication is provided “as is” without warranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose or non-infringement.ACI and its members disclaim liability for damages of any kind, including
7、 any special, indirect, incidental, or consequential damages, including without limitation, lost revenues or lost profits, which may result from the use of this publication.It is the responsibility of the user of this document to establish health and safety practices appropriate to the specific circ
8、umstances involved with its use. ACI does not make any representations with regard to health and safety issues and the use of this document. The user must determine the applicability of all regulatory limitations before applying the document and must comply with all applicable laws and regulations,
9、including but not limited to, United States Occupational Safety and Health Administration (OSHA) health and safety standards.Participation by governmental representatives in the work of the American Concrete Institute and in the development of Institute standards does not constitute governmental end
10、orsement of ACI or the standards that it develops.Order information: ACI documents are available in print, by download, on CD-ROM, through electronic subscription, or reprint and may be obtained by contacting ACI.Most ACI standards and committee reports are gathered together in the annually revised
11、ACI Manual of Concrete Practice (MCP).American Concrete Institute38800 Country Club DriveFarmington Hills, MI 48331Phone: +1.248.848.3700Fax: +1.248.848.3701www.concrete.orgThis document provides a framework for enabling efficient inter-disciplinary coordination and collaboration for exchanging info
12、r-mation in both model and nonmodel forms. This report develops a process model that identifies the typical workflows during engi-neering design, planning, and site production of cast-in-place (CIP) reinforced concrete. It identifies what information and when it is to be shared between disciplines a
13、t different stages of CIP concrete projects. The process model relates the different disci-plines that deliver the project, the different phases of the project, and the information exchanges that take place. This report will be used by building information modeling (BIM) users and software developer
14、s as a framework for developing shareable model views for visualization and coordination of production and placement of reinforced concrete.Keywords: building information modeling; exchange descriptions; infor-mation delivery manual; task descriptions; work process flow chart.CONTENTSCHAPTER 1INTROD
15、UCTION AND SCOPE, p. 21.1Introduction, p. 21.2Scope, p. 2CHAPTER 2DEFINITIONS, p. 2CHAPTER 3INFORMATION DELIVERY MANUAL OVERVIEW, p. 23.1Background, p. 23.2 Information delivery manual hierarchy, p. 3CHAPTER 4PROCESS MODEL, p. 34.1Protocol for process model, p. 34.2Rules for formatting process model
16、, p. 5CHAPTER 5TASK, EXCHANGE MODEL, AND NONMODEL INFORMATION DESCRIPTIONS, p. 8CHAPTER 6REFERENCES, p. 8APPENDIX ACOMPLETE CAST-IN-PLACE CONCRETE PROCESS MODEL, p. 9APPENDIX BCONCRETE REINFORCEMENT SUBPROCESS MODEL, p. 10Peter J. Carrato, Chair Allan P. Bommer, SecretaryACI 131.1R-14Information Del
17、ivery Manual (IDM) for Cast-in-Place ConcreteReported by ACI Committee 131Kevin D. AkeJoseph M. AlesPhillip Jay Antis Sr.James P. BarrettDaniel D. BerendGregory P. BirleyRichard H. BirleyChristopher D. BrownBrady G. BuckleyBarry B. ButlerJames T. DavyEdwin T. DeanCharles M. EastmanSidney FreedmanDav
18、id A. Grundler Jr.William F. IkerdHarrison Rolfe JenningsJulian KangWilliam M. KlormanMichael W. LaNierDonald G. McLaughlinRonald L. OKaneMohamed M. Shokry RashwanMartin ReifschneiderDan RussellJoseph C. SandersWilliam J. ShebetkaKurt Dickenson SwenssonJohn B. TurnerJim D. VolkAlistair WellsMatt Whe
19、elisPeter ZdgiebloskiACI Committee Reports, Guides, and Commentaries are intended for guidance in planning, designing, executing, and inspecting construction. This document is intended for the use of individuals who are competent to evaluate the significance and limitations of its content and recomm
20、endations and who will accept responsibility for the application of the informa-tion it contains. ACI disclaims any and all responsibility for the stated principles. The Institute shall not be liable for any loss or damage arising there from.Reference to this document shall not be made in contract d
21、ocuments. If items found in this document are desired by the Architect/ Engineer to be a part of the contract documents, they shall be restated in mandatory language for incorporation by the Architect/Engineer.ACI 131.1R-14 was adopted and published January 2015.Copyright 2015, American Concrete Ins
22、titute.All rights reserved including rights of reproduction and use in any form or by any means, including the making of copies by any photo process, or by electronic or mechanical device, printed, written, or oral, or recording for sound or visual reproduc-tion or for use in any knowledge or retrie
23、val system or device, unless permission in writing is obtained from the copyright proprietors.1APPENDIX CCONCRETE PLACEMENT SUBPROCESS MODEL, p. 11APPENDIX DCONCRETE FORMWORK AND SHORING SUBPROCESS MODEL, p. 12APPENDIX EDESCRIPTIONS OF CAST-IN-PLACE REINFORCED CONCRETE TASKS AND MODEL AND NONMODEL E
24、XCHANGE DESCRIPTIONS, p. 13(I) Task descriptions, p. 13(II) Nonmodel information exchange descriptions, p. 17(III) Exchange model descriptions, p. 20CHAPTER 1INTRODUCTION AND SCOPE1.1IntroductionThe National BIM Standard United StatesTM(NBIMS-USTM2013) defines standard and efficient terminology and
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ACI1311R2014INFORMATIONDELIVERYMANUALIDMFORCASTINPLACECONCRETEPDF

链接地址:http://www.mydoc123.com/p-1242705.html