GA 276-2005 GYPSUM BOARD ROOF UNDERLAYMENT SYSTEMS《石膏板屋顶垫层系统》.pdf
《GA 276-2005 GYPSUM BOARD ROOF UNDERLAYMENT SYSTEMS《石膏板屋顶垫层系统》.pdf》由会员分享,可在线阅读,更多相关《GA 276-2005 GYPSUM BOARD ROOF UNDERLAYMENT SYSTEMS《石膏板屋顶垫层系统》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Printed in U.S.A. Copyright Gypsum Association 2005. All rights reserved. GYPSUM ASSOCIATION 810 FIRST STREET NE, #510 WASHINGTON, DC 20002 GYPSUM BOARD ROOF UNDERLAYMENT SYSTEMS (GA-276-05) Effectively preventing fire from penetrating through the roof eliminates updrafts, both limiting the potentia
2、l for fire spreading on the roof surface and reducing the generation of flying brands. Adding gypsum board to roof systems also inhibits the spread of fire within an attic while protecting against burning brands from fires originating in another unit or from burning vegetation. The use of 5/8in. (15
3、.9 mm) thick type X gypsum board as an underlayment for combustible roofs is the preferred alternate to roof parapets separating dwelling units in multi-family construction. This method of fire protection is de-signed to resist the spread of fire from unit to unit over the top of party walls. To ach
4、ieve this fire protection alternative, the Gypsum Association has developed the following three recom-mended methods of installation. Although the model codes (IBC, BOCA, SBCCI, fit edge joints snugly together without forcing. End and edge joints need not be taped. Protect gypsum board against ex-po
5、sure to inclement weather during installation and until the roof membrane installation is complete. Attach combustible roof sheathing through the gypsum board to the roof framing with sheathing joints offset from the gypsum board joints. Increase fastener length by 5/8in. (16 mm) to account for the
6、thickness of the gypsum board. Apply the roof membrane as specified by the manufacturer. This full roof underlayment method offers a number of advantages over the partial roof underlayment and ledger strip methods. First, it provides the greatest degree of fire protection. Second, it is the least co
7、mplicated of the three methods to install, and finally, it is generally the most cost effective when the additional labor costs incurred by the other methods are considered. GA-276-05 Page 2 PARTIAL ROOF UNDERLAYMENT Install 5/8in. (15.9 mm) type X gypsum board under the combustible roof sheathing o
8、n both sides of the party wall for not less than the minimum distance required by the code. Apply the gypsum board on top of roof framing, with the paper-bound edge perpendicular to the framing, prior to the installation of combustible roof sheathing. All gypsum board ends should occur over and be s
9、upported by the roof framing. Nail the gypsum board to each framing member with at least two minimum 4d common nails, or 13/8in. (35 mm) gypsum wallboard nails. Butt end joints loosely; fit edge joints snugly together without forcing. End and edge joints need not be taped. Protect gypsum board again
10、st exposure to inclement weather during installation and until the roof membrane installation is complete. Shim all remaining trusses and rafters as necessary to provide a straight and uniform base for the attachment of the combustible roof sheathing. Attach roof sheathing through the gypsum board t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GA2762005GYPSUMBOARDROOFUNDERLAYMENTSYSTEMS 石膏板 屋顶 垫层 系统 PDF

链接地址:http://www.mydoc123.com/p-1228985.html